ML20058A236
| ML20058A236 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/18/1990 |
| From: | Quay T Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20058A238 | List: |
| References | |
| NUDOCS 9010250350 | |
| Download: ML20058A236 (4) | |
Text
. - _ _ _ _ _ -. _ _ - _ - _ - - - - _ _ - _ _ - - _ - - - _ - - _ _
- .. t.
je %
1 UNITE D STATES
[
r g.
NUCLEAR REGULATORY COMMISSION
- L'-
5
'o E
- WASHINGTON, D, C. 20555 w,,....*/
ENTERGY OPERATIONS IFC.
DOCKET NO. 50-313 ARKANSAS NUCLEAR ONE. UNIT 1 AMENDMENTTOFACILITYOPERATINL8.lCENSE Amendment No.136 j
License No. DPR-51' l
l'.
.The Nuclear Regulatory Comission (the Comission) has found that:
q A.
The application for amendment by Arkansas Power and Light Company.
dated March 2,1990, complies with the standards and recuirements of the Atomic Energy Act of 1954, as amended (the Act), anc the Comission's rules and regulations set forth in 10 CFR Chapter I; B.-
The facility will operate in conformity with the application, the:
1 provisions of the Act, and the, rules and regulations of the
. Comission; l
'C.
'There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without i.ndangering the health a
and safety of the public, and-(ii). that such activities will be conducted in compliance with the'Comission's cegulations;~
-D.
The issuance of this license amendment will not be-inimical to the I
comon defense and security or to the health and safety of the-public;-
and l
E.
- The issuance of this amendment is in accorcance with.10 CFR Part 51 of the Comission's regulations and all applicable requirements have i
been satisfied.
i 901o25035o 90101e N
ADOCK 05000313 P
PNU n
4 S
s, '.;
a
..,7 '
J 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No.
DPR-51 is hereby amended to read as follows:
2.
. Technical Specifications The Technical Specifications containeo in Appendix A, as revised through Amendment No.136, are hereby incorporated in the license. The licensee shall operate.the facility in i
accordance with the Technical Specifications.
3.
The license amendment is effective 30 days frcm the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
[zerbw h.
nay Theodore R. Quay, Acting Director Project Directorate IV-1 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: Oct'ober 18, 1990
4:.
ATTACHMENT TO LICENSE AMENDMENT NO.136 4
FACILITY OPERATING LICENSE NO. DPR-51 DOCKET NO. 50-313 Revise the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by Amendment number and contain vertical lines indicating the area of change.
REMOVE PAGE INSERT-PAGE 110t 110t
]
l b
i l
l l
1 l'
l 1
.i
=4'.21 SPRINKLER SYSTEMS.
~
'doplicability
, Applies to surveillance of the sprinkler systems which are required to be -
I operable by Specification 3.18.
Objective.
To assure that the various sprinkler systems are available and operable when
- needed, t
Specification 4.21.1
_The sprinkler systems located in the condensate demineralizer l
area, the four reactor building cable penetration areas, the two emergency diesel generator rooms, the two diesel generator fuel vaults, four cable penetration rooms, cable spreading room, and Hallway El 372 (Zone 98-J) shall be demonstrated operable:
~
a.
At least once per 31 days by verifying that each system is aligned to the fire pumps; b.
At least once per 12 months by cycling each testable valve in.
the flow path through at least one complete cycle of full travel; c.
At least once per 18 months by inspection of the spray nozzles and-headers to verify their integrity.
Bases The condensate deminealizer area sprinkler system is a wet pipe' system actuated only by heat action.on the fusible head = sprinkler.
The sprinkler systems in'the four Reactor Building cable penetration areas are preaction closed-head (fusible head) systems which must be remotely charged from the control room.
The sprinkler. systems in the two-emergency diesel generator rooms and four cable penetration rooms are automatic preaction closed-head (fusible head)-
systems which are actuated by detection in the area or remote manual operation from the control room.
The sprinkler systems in the two diesel generator. fuel vaults are automatic deluge systems which are actuated by smoke detectors in the area or remote manual operation from the control room.
' The sprinkler system in Hallway El 372-(Zone 98-J) and cable spreading room.
are automatic deluge systems which are actuated by detection in the area or remote manual nperation from the control room.
The required. inspections will assure availability of the various sprinkler systems when they are needed.
Amendment No. 30, IZI,136 110t
_