ML20058A161

From kanterella
Jump to navigation Jump to search
Forwards Revised NRC Operating Status Report for Aug 1990 for Haddam Neck Plant Unit 1
ML20058A161
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/15/1990
From: Stetz J
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058A092 List:
References
NUDOCS 9010250303
Download: ML20058A161 (1)


Text

--

.t

.g.

,yf ' t

)

ifl,.

CON NECTICUT~' YAN K EE ATOMIC POWERL COMPANY 1 l:

HADDAM NECK PLANT '

'j RR#1

  • BOX 127E
  • EAST HAMPTON, CT 06424 9341 j

a.

October 15,1990 n'

Re: Technical Specification 6.9.ld L

Docket No. $0 213 K

q l-U.' S. Nuclear Regulatory Commission Document Control Desk

- Washington, D. C. 20555

Dear Sir:

d

' In accordance with reporting requirements of Technical Specification 6.9.ld, the Connecticut Yankee Haddam Neck Plant Monthly Operating Report 90-09, covering operations for the period September 1,1990 to September 30,.1990 is hereby forwarded.

Attached is the revised NRC Operating Status Report for August 1990.-

L Very truly yours,

[

u..

John P. Stetz -

Station Director.

l JPS/va:

l.

cc:

(1); ! Regional Administrator, Region 1-

~~

U. S. Nuclear Regulatory Commission -

3 (475 Allendale Road b>

King of Prussia, PA 19406 1

.(2)l - John T. Shedlosky -

Sr. Resident inspector p,

Connecticut Yankee 4

il dCI5S 9010250303 901015 PDR ADOCK 05000213

~R PNV

=

f'

+

a Hw6-3 AEV,1447 d\\

\\

,,-