r October 18, 1993 Docket No. 50-382 Mr. Ross P. Barkhurst Vice President Operations Entergy Operations, Inc.
Post Office Box B Killona, Louisiana 70066
Dear Mr. Barkhurst:
-l
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - RESPONSE TO NRC BULLETIN 93-02, " DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. M86632)
This letter acknowledges receipt of your response dated June 9, 1993, to NRC Bulletin 93-02 (Bulletin).
The Bulletin was issued May 11, 1993, to all nuclear power reactor licensees.
It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory measures, and remove any such material. Your response stated that fibrous filter material, such as described in the Bulletin, was identified as being used in your containment and that compensatory actions were not necessary because the material was located well within the ductwork of the Airborne Radioactivity Removal System. We agree that removal is not necessary, and, accordingly, we consider your actions to be complete.
Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.
Should you have any questions, please contact me at (301) 504-1301 or the lead project manager for this issue, John B. Hickman, at (301) 504-3017.
Sincerely, ORIGINAL SIGNED BY:
David L. Wigginton, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION Docket File NRC & Local PDRs PD4-1 Reading R. Barrett D. Wigginton E. Adensam W. Beckner P. Noonan ACRS (10) (P-315)
OGC (15818)
J. Roe A. B. Beach, RIV J. Hickman 0FC LA:PD4-TV)i PM:h-J D:PD4-1 rJbb hon:pk WBeckner NAME PNoodan I DWi DATE
/(') /fi$/93 10/ 8 /93
/0/N/93 Tj YEh0) kSh0 YES/fi@
COPY OFFICIAL RECORD COPY Document Name: WAT86632.ltr 9
9310220094 931018 2100'c IVRC g gJ y
f PDR ADOCK 05000382 a.
P PDR
E October 18, 1993 Docket No. 50-382 i
Mr. Ross P. Barkhurst Vice President Operations Entergy Operations, Inc.
Post Office Box B t
Killona, Louisiana 70066
Dear Mr. Barkhurst:
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - RESPONSE TO NRC BULLETIN 93-02, " DEBRIS PLUGGING 0F ENERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. M86632)
This letter acknowledges receipt of your response dated June 9,1993, to NRC Bulletin 93-02 (Bulletin). The Bulletin was issued May 11,1993, to all nuclear power reactor licensees.
It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory measures, and remove any such material.
Your response stated that fibrous filter material, such as described in the Bulletin, was identified as being used in your containment and that compensatory actions were not necessary because the material was located well within the ductwork of the Airborne Radioactivity Removal System. We agree that removal is not necessary, and, accordingly, we consider your actions to be complete.
Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.
Should you have any questions, please contact me at (301) 504-1301 or the lead project manager for this issue, John B. Hickman, at (301) 504-3017.
Sincerely, ORIGINAL SIGNED BY:
David L. Wigginton, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION Docket File NRC & Local PDRs PD4-1 Reading R. Barrett D. Wigginton E. Adensam W. Beckner P. Noonan ACRS (10) (P-315)
OGC (15B18)
J. Roe A. B. Beach, RIV J. Hickman 0FC LA:PD4eTM PM:h0hl D:PD4-In)$
DWih on:pk WBeckner NAME PNoodan E DATE /d//8/93 10/,K/93
/0/N/93 YEh hNO YESh COPY 0FFICIAL RECORD COPY Document Name: WAT86632.ltr L
- p..m
't UNITED STATES
.o
[,
J j NUCLEAR REGULATORY COMMISSION
- y,gg f
WASHINGTON, D.C. 20555-0001 October 18, 1993 Docket No. 50-382 Mr. Ross P. Barkhurst Vice President Operations Entergy Operations, Inc.
Post Office Box B Killona, Louisiana 70066
Dear Mr. Barkhurst:
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - RESPONSE TO NRC BULLETIN 93-02, " DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. M86632) 4 This letter acknowledges receipt of your response dated June 9,1993, to NRC Bulletin 93-02 (Bulletin).
The Bulletin was issued May 11, 1993, to all nuclear power reactor licensees.
It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory measures, and remove any such material.
Your response stated that fibrous filter material, such as described in the Bulletin, was identified as being used in your containment and that compensatory actions were not necessary because the material was located well within the ductwork of the Airborne Radioactivity Removal System. We agree that removal is not necessary, and, accordingly, we consider your actions to be complete.
Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.
Should you have any questions, please contact me at (301) 504-1301 or the lead project manager for this issue, John B. Hickman, at (301) 504-3017.
Sincerely,
-- t ign David L. Wigginton, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation cc:
See next page 1
j i
i Mr. Ross P. Barkhurst i
-Entergy Operations, Inc.
Waterford 3
)
CC*
Mr. Hall Bohlinger, Administrator Regional Administrator, Region IV Radiation Protection Division U.S. Nuclear Regulatory Commission Office of Air Quality and Nuclear Energy 611 Ryan Plaza Drive, Suite 1000 Post Office Box 82135 Arlington, Texas 76011 Baton Rouge, Louisiana 70884-2135 Resident Inspector /Waterford NPS Mr. Jerrold G. Dewease Post Office Box 822 Vice President, Operations Killona, Louisiana 70066 Support Entergy Operations, Inc.
Parish President Council P. O. Box 31995 St. Charles Parish Jackson, Mississippi 39286 P. O. Box 302 Hahnville, Louisiana 70057 William A. Cross Bethesda Licensing Office Mr. Harry W. Keiser, Executive Vice-3 Metro Center President and Chief Operating Officer Suite 610 Entergy Operations, Inc.
Bethesda, Maryland 20814 P. O. Box 31995 Jackson, Mississippi 39286-1995 Mr. Robert B. McGehee Wise, Carter, Child & Caraway Chairman P.O. Box 651 Louisiana Public Service Commission Jackson, Mississippi 39205 One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Mr. D. F. Packer General Manager Plant Operations Mr. R. F. Burski, Director Entergy Operations, Inc.
Nuclear Safety P. O. Box B Entergy Operations, Inc.
Killona, Louisiana 70066 P. O. Box B Killona, Louisiana 70066 Mr. L. W. Laughlin, Licensing Manager Entergy Operations, Inc.
P. O. Box B Killona, Louisiana 70066 Winston & Strawn Attn:
N. S. Reynolds 1400 L Street, N.W.
Washington, DC 20005-3502