ML20057G185
| ML20057G185 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/15/1993 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cottle W HOUSTON LIGHTING & POWER CO. |
| References | |
| CAL-4-93-04B, CAL-4-93-4B, NUDOCS 9310210006 | |
| Download: ML20057G185 (5) | |
Text
40u UNITED STATES g_
Jg NUCLEAR REGULATORY COMMISSION
[
j P.EGION IV o
611 RYAN PLAZ*. DRIVE, SUITE 403
?,p j#
ARUNGTON, TEXAS 40114364 OCT I 51993 Dockets:
50-498 50-499 Licenses: NPF-76 NPF-80 CAL 4-93-04B Houston Lighting & Power Company ATTN: William T. Cottle, Group Vice President, Nuclear P.O. Box 1700 Houston, Texas 77251
SUBJECT:
CONFIRMATORY ACTION LETTER SUPPLEMENT 2 This is the second supplement to my Confirmatory Action Letter of February 5, 1993, which noted Houston Lighting & Power Company's management agreement that South Texas Project, Units 1 and 2, will not be taken critical until the NRC staff has been briefed on the results of your efforts to correct the overspeed trip condition which affected the turbine-driven auxiliary feedwater pumps.
As discussed with Mr. John Groth in a public meeting in Arlington, Texas, on October 5, 1993, the following topics have been identified as additions to the issues which must be resolved prior to startup of either South Texas Project unit.
In a telephone conversation on October 15, 1993, you acknowledged these issues and agreed that these topics would be addressed in your briefing of the NRC staff in a meeting to be scheduled prior to unit startup.
The additional topics are:
Effectiveness of the SPEAK 0UT program; Standby diesel generator reliability; Essential chiller reliability; The system certification program; Reliability and operability of the feedwatei isolation bypass valves; Adequacy of tornado damper testing; and Acceptability of the emergency preparedness accountability drill results.
These are not new issues, but they were considered to be significant following reviews of the Diagnostic Evaluation Report, your Operational Readiness Program, the allegation process, and recent NRC inspection findings. The complete results of these reviews are documented in NRC Inspection Report 50-498/93-31; 50-499/93-31. This listing of topics for discussion is CERTIFIED MAIL - RETURN RECEIPT RE0 VESTED
%O2go P
l l
Houston Lighting & Power Co. j l
intended to focus the briefing on staff concerns involving potential safety issues.
If other such topics are identified prior to the briefing, you will be advised by letter or telephone.
Please inform me when your staff has made significant progress in addressing these issues so I can schedule special inspections prior to the briefing. All provisions of the February 5, 1993, letter and its supplement of May 7,1993, remain in effect.
If you have any questions, please feel free to contact me or Mr. Art Howell of my staff.
Sincerely.
C/&l l! L o t
~Q ames L. Mi an-j Regional A... nisttator t
cc:
Houston Lighting & Power Company ATTN: James J. Sheppard, General Manager Nuclear Licensing P.O. Box 289 Wadsworth, Texas 77483 City of Austin Electric Utility Department ATTN:
J. C. Lanier/M. B. Lee 721 Barton Springs Road Austin, Texas 78704 i
City Public Service Board ATTN:
K. J. Fiedler/M. T. Hardt i
P.O. Box 1771 San Antonio, Texas 78296 Newman & Holtzinger, P. C.
ATTN: Jack R. Newman, Esq.
1615 L Street, NW Washington, D.C.
20036 Central Power and Light Company ATTN:
D. E. Ward /T. M. Puckett P.O. Box 2121 Corpus Christi, Texas 78403 t
INP0 Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957 l
i Houston Lighting & Power Co.,
Bureau of Radiation Control State of Texas 1100 West 49th Street Austin, Texas 78756 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414 Licensing Representative Houston Lighting & Power Company Suite 610 i
Three Metro Center Bethesda, Maryland 20814 Houston Lighting & Power Company ATTN:
Rufus S. Scott, Associate l
General Counsel P.O. Box 61867 Houston, Texas 77208 Mr. Joseph fl. Hendrie 50 Bellport Lane Bellport, New York 11713 t
r l
1
9 Houston Lighting & Power Co. OCT I 5 2 bec to DMB (IE36) bcc distrib. by RIV:
J. L. Milhoan Resident Inspector Section Chief (DRP/A)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV File Project Engineer (DRP/A)
R. Bachmann, 0GC, MS: 15-B-18 Section Chief (DRP/TSS)
G. F. Sanborn, EO W. L. Brown, RC DRP DRS J. M. Taylor, MS: 17-G-21 E. L. Jordan, MS: 37-0-1 J. Lieberman, MS: 7-H-5 E. G. Adensam, MS: 13-E-4 S. C. Black, MS: 13-H-15 L. E. Kokajko, MS: 13-E-16 e
D, RIV:CMRP/A ADD:DRP(b ADD:DRSS h D<dRk )
NRR (h d dbb WDJohnson:ww ATHowel1 (kDChamberlain [SCCdllins/
EGAdenYam 10/#/93 10/0493 10//3/93 kOM3 10/p/93
/rk DRMf]fy RN4[A D:DRP) k E0[M RC M
l GFb$ brn wlBI n JMbtgomery dL Nan ABBeach 10/p' /93 l10/ji/93 10/ti/93 10//$/93 10/l5/93
4 a
Houston Lighting & Power Co. OCT I 5 FR3 bcc to DMB (IE36) s \\
bcc distrib. by RIV:
J. L. Milhoan Resident Inspector Section Chief (DRP/A)
Lisa Shea, RM/ALF, MS: HNBB 4503 MIS System DRSS-FIPS RIV File Project Engineer (DRP/A)
R. Bachmann, OGC, MS: 15-B-18 Section Chief (DRP/TSS)
G. F. Sanborn, E0 W. L. Brown, RC DRP ORS J. M. Taylor, MS: 17-G-21 E. L. Jordan, MS: 37-0-1 J. Lieberman, MS: 7-H-5 E. G. Adensam, MS: 13-E-4 S. C. Black, MS: 13-H-15 L. E. Kokajko, MS: 13-E-16 f
r O-g RIV:C:bRP/A ADD:DRP4)[
ADD:DRSS h d5)
NRR (
WDJohnson:w ATHoweY1
(:kDChamberlain[SCCdllin/
EGAdenYam 10/P/93 10/tk/93 10/jj/93 k0dyd3 10/p/93
/ph DRADfv7 RM/4[A 0:DRPJM E0[~l[;
RC M
GFS$ibn WLBro n JM$ntgomery JLMilban ABBeachc 10/p' /93 10/j$/93 10//i/93 10/lh/93 10/l5/93 20nong