ML20057G083
| ML20057G083 | |
| Person / Time | |
|---|---|
| Site: | Monticello, Prairie Island |
| Issue date: | 10/14/1993 |
| From: | Ring M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Antony D NORTHERN STATES POWER CO. |
| References | |
| NUDOCS 9310200152 | |
| Download: ML20057G083 (2) | |
Text
_
e i
?
I j
October 14, 1993 Docket No. 50-263 Docket No. 50-282 Docket No. 50-306 Northern States Power Company ATTN: Mr. D. D. Antony Vice President, Nuclear Generation i
414 Nicollet Mall l
Minneapolis, MN 55401
Dear Mr. Anteny:
'N\\
Thank you for your 10 CFR 50.54(a) submittal dateddune 4,1993, which incorporates changes in your Quality Assurance Program' description. We have l
reviewed the changes associated with this submittal. Que(tions resulting from j
l this review were discussed between Mr. F. Maura of this office and l
Mr. P. Kamman of your staff during telephone conferences on September 14 and l
27, 1993.
As a result of these discussions you submitted additional-l information on September 30, 1993, to justify the reduction in commitment identified during our-review. We have completed our review and based on the information provided in your September 30, 1993 letter, we conclude that these revisions continue to meet the requirements of 10 CFR Part 50, Appendix B, and 1
are acceptable.
If there are changes to QA commitments existing in docketed correspondence outside of the Quality Assurance Program description,:you are j
obligated to notify this office.
We appreciate your timely submittal of information required by 10 CFR 50.54(a).
Please contact Mr. Bruce Burgess of my staff at (708) 790-5575 with any questions you may have regarding this matter.
Sincerely, Original signed by Mark A. Ring l
Mark A.' Ring, Chief Operations Branch Division of Reactor Safety See Attached Distributicn RIII RIIpa RIII RIII y
f)[j'b Maura /cg B. Burgess rgensen Ring 10//3/93 10/(-) /93 10/g /93 10/// /93 l
9310200152 931014 0
PDR ADOCK 05000263 P
Northern States Power Company 2
October 14, 1993 l
Distribution cc:
E. L. Watzl, Site Manager, Prairie Island Site L. Waldinger, General Manager W. Hill, Plant Manager M. Wadley, Plant Manager j
OC/LFDCB l
Resident Inspector, RIII Prairie j
Island Resident Inspector, RIII Monticello John W. Ferman, Ph. D.,
Nuclear Engineer, MPCA State Liaison Officer, State of tiinnesota State Liaison Officer, State of Wisconsin M. K. Gamberoni, LPM, NRR R. B. Samworth, LPM, NRR bcc:
PUBLIC-IE01 s
7 f L 1
l l
J
-