ML20057G049

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-336/93-21 & 50-423/93-22 on 930823- 27.No Violations Noted
ML20057G049
Person / Time
Site: Millstone  
Issue date: 10/07/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20057G050 List:
References
NUDOCS 9310200124
Download: ML20057G049 (2)


See also: IR 05000336/1993021

Text

.

i

!

,

1

OCT

7 1993

Docket Nos. 50-336

50-423

Mr. John F. Opeka

Executive Vice President - Nuclear

Northeast Nuclear Energy Company

P. O. Box 270

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT: INSPECTION REPORT NOS. 50-336/93-21 AND 50-423/93-22

This letter refers to the announced inspection conducted by Mr. S. Chaudhary of this office

on August 23 - 27,1993, at the Millstone Nuclear Power Plant, Units 2 and 3, at Waterford,

-

Connecticut. Mr. Chaudhary discussed the results of the inspection with Messrs. Resetar and

l

Sudigala of your staff on August 27,1993, at the conclucion of this inspection.

This inspection was directed toward areas important to public health and safety. Areas

examined during this inspection are described in the NRC Region I inspection report, which

l

is enclosed with this letter. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with personnel, and

observation by the inspector.

This inspection has indicated that your surveillance and maintenance program for pipe

supports and snubbers is effective in assuring the safety functions of these items.

No reply to this letter is necessary and your cooperation with us in this matter is appreciated.

Sincerely,

j.m0 =1sisedEyr

Jacque F.Durt

Jacque P. Durr, Chief

l

Engineering Branch

Division of Reactor Safety

I

Enclosure: NRC Inspection Report Nos. 50-336/93-21 and 50-423/93-22

I

i

ESA % 'S osE88$26

/

O

PDR;

7

[

,

<

)

_ _ _ _ _ _

_

_

_

.

.

,

OCT

7 1993

Northeast Nuclear

2

Energy Company

cc w/ encl:

W. D. Romberg, Vice Presider.t - Nuclear, Operations Serdtes

S. b. Scace, Vice President, Millstone Station

J. P. Stetz, Vice President, Haddam Neck Plant

F. R. Dacimo, Nuclear Unit 3 Director

l

G. H. Bouchard, Nuclear Unit 2 Director

l

R. M. Kacich, Director, Nuclear Licensing

J. Solymossy, Director, Nuclear Quality and Assessment Services

l

Gerald Garfield, Esquire

l

Nicholas Reynolds, Esquire

l

K. Abraham, PAO (2) All Inspection Reports

1

Public Document Room (PDR)

Local Public Document Room (LPDR)

l

Nuclear Safety Information Center (NSIC)

l

NRC Resident Inspector

State of Connecticut SLO

bec w/ encl:

Region I Docket Room (with concurrences)

I

bec w/ encl (VIA E-MAIL):

V. McCree, OEDO

V. Rooney, PM, NRR

G. Vissing, PM, NRR

J. Stolz, NRR/PD I-4

C__d

,)

y

RI:DRS

RI:DRS

RI:DRS

Chaudhary

Gray

Durr

SYC

((/L-

9/10/93

9/7//93

10/ //93

OFFICIAL RECORD COPY

A:M23-2122. INS

\\

4

m

. . _ ,

..,r