Docket No. 50-440
Centerior Service Company
ATTN: Mr. R. A. Stratman
Vice President
Nuclear - Perry
c/o The Cleveland Electric Illuminating
Company
10 Center Road
Perry, OH 44081
Dear Mr. Stratman:
l
This refers to the inspection conducted by Mrs. S. Burgess and
l
Messrs. A. Vegel and D. Kosloff of this office, on July 30 through
September 13, 1993. The inspection included a review of activities
authorized for your Perry Nuclear Power Plant, Unit 1, facility. At the
conclusion of the inspection, the findings were discussed with those members
i
of your staff identified in the enclosed report.
'
.
Areas examined during the inspection are identified in the report.
Within
l
these areas, the inspection consisted of selective examinations of procedures
!
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violation indicated weaknesses in management
oversight of scaffold activities and the questioning attitude of maintenance
j
and operations personnel. Weaknesses concerning the questioning attitude of
plant personnel has been identified previously,
i
You are required to respond to this letter and should follow the instructions
Ng{
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
l
actions you plan to prevent recurrence.
After reviewing your response to this
(l\\
Notice, including your proposed corrective actions and the results of future
k
>
inspections, the NRC will determine whether further NRC enforcement action is
j
necessary to ensure compliance with NRC regulatory requirements.
!
You are also requested to address in your response to the Notice any specific
actions you have taken or plan to take to address the weaknesses discussed
above.
During this inspection, certain other of your activities appeared to be in
l
violation of NRC requirements. However, as described in the enclosed
inspection report, you identified the violation.
Therefore, the violation
will not be subject to enforcement action because your efforts in identifying
l
9310200010 931008
ADOCK 05000440
0
,
l
]
OCT 0 81993
,
Centerior Service Company
2
-
and correcting the violation meet the criteria specified in Section VII.B of
the " General Statement of Policy and Procedures for NRC Enforcement Actions,"
(Enforcement Policy, 10 CFR Part 2, Appendix C). As noted in the enclosed
inspection report, additional attention is needed in the areas of maintenance
planning and compliance with equipment tagging procedures.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your responses to this letter will be placed
in the NRC Public Document Room.
j
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
'
Sincerely,
"N!c al e:.md byIL2. crne
L. R. Greger, Chief
Reactor Projects Branch 3
Enclosures:
1.
2.
Inspection Report
No. 50-440/93016(DRP)
See Attached Distribution
RIII
RIIk
RIII
RIII
Mh
A J S)p
CCC
g,
,
Lan sbury
BBurgess
Olteanu
pr
it @b
97 &
gp'
loff
txtva
f h enh
%
6.kW
~1
' 0CT 0 81993
.
Centerior Service Company
3
-
l
Distribution
!
'
cc w/ enclosures:
R. W. Schrauder, Director, Nuclear
Support Department
D. P. Igyarto, General Manager,
Perry Nuclear Power Plant
K. P. Donovan, Manager,
Licensing and Compliance Section
N. L. Bonner, Director, Perry
Nuclear Engineering Dept.
H. Ray Caldwell, General
Superintendent Nuclear Operations
Resident Inspector, RIII
Terry J. Lodge, Esq.
State of Ohio State Liason Officer
Robert E. Owen, Ohio
4
Department of Health
A. Grandjean, State of Ohio
Public Utilities Commission
OC/LFDCB
-
Licensing Project Manager, NRR
Technical Support Section, RIII
'