p Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 6
October 13, 1993 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report September. 1993 Attached is the Monthly Operating Report for September, 1993, for the Monticello Nuclear Generating Plant.
ff h d VM%
Roger o Anderson Director Licensing and Management Issues c:
Director, Office of Resource Management Regional Administrator-III, NRC NRR Proj ect Manager, NRC NRC Resident Inspector j
State of Minnesota - Kris Sanda Attachment soo~u fp{
f I
es.
9310190255.930930 R{up A
PDR ADOCK 05000263 j
R PDR
OPERATING DATA REPORT 4
r
)
DOCKET NO.
50-263 l
DATE 10- 1-93 I
COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 i
OPERATING STATUS
] Notes
]
l
- 1. Unit Name :
Monticello
]
]
- 2. Reporting period:
September
]
]
- 3. Licensed Thermal Power (MWt):
1670
]
]
- 4. Nameplate Rating (Gross MWe):
569_
]
]
- 5. Design Electrical Rating (Net MWe):
545.4
]
]
- 6. Maximum Dependable Capacity (Gross MWe): __564
]
]
l
- 7. Maximum. Dependable Capacity (Net'MWe):
536
]
]
l
- 8. If Changes Occur in Capacity Ratings (Items Number 3-Through 7) Since Last i
Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A
~
THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 720 6551 195072
- 12. Number Of Hours Reactor Was Critical 720.0 5191.0 157175.7-
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 720.0 5137.9 154414.1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1201594 8243445 237636858
- 17. Gross Electrical Energy Generated (!f43) 407472 2790449 80321249
+
- 18. Net Electrical Energy Generated (MWH) 392633 2673478 76829365'
- 19. Unit Service Factor 100.0%
78.4%
79.2%-
- 20. Unit. Availability Factor 100.0%
78.4%
79.2%
l
- 21. Unit Capacity Factor (Using MDC Net) 101.7%-
176.1%
73.5%'
i
- 22. Unit Capacity Factor (Using DER Net) 100.0%
74.8%
72.2%
- 23. Unit Forced Outage Rate 0.0%
1.7%
3.7%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
.i
- None
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A i
26 : Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved-j INITIAL CRITICALITY
~
INITIAL ELECTRICITY COMMERCIAL OPERATION i
o n
e R
v
~l
[
l
.y AVERAGE DAILY UNIT POWER LEVEL
~
DOCKET NO.-
50-263 UNIT Monticello__
DATE 10- l-93 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151
. MONTH OF September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)-
1 537.
17 547.
2 539.
18 547.
~
3 542.
19
- 546, 4
541.
20 546.
5
'540.
21 549.
]'
6 546.
22 547.
7 541.
23 549.
8 543.
24 548.
9 544.
25 547.
10 544.
26 550.
11 546.
27 547.
h i
12
- 545, 28 548.
{
l 13
- 548, 29 548.
t 14 544.
30 548.
-j 15 547.
16 548.
j INSTRUCTIONS 1
On this. format, list the average daily unit power level in MWe-Net for.each day in the reporting month.
Compute to the nearest whole megawatt.
l
' l NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE
?
i DOCKET NO.
50-263 DAT,,
10- 1-93 COMPLETED Y
't. H. Paustian l
TELEPHCJE 12/295-5151 e
t
. MONTH SEP l
r 9-1-93 to Power operation, t
f 9-30-93
' i
. i i
1
~;
i i
?
f 1
~
. i 7
' l j
Note: Power operation defined as: essentially-100% off rated' power except for weekend load drops for
~j specified surveillance testing.
i 7
t i
u
.--~c
-, +
c-
- fF T
IRIT SHUTDOVNS AND POVER REDUCTIONS DOCKET No. 50-263' UNIT NAME Monticello DATE 1 0-01-93
+
1229N5$51 REPORT MONIH _ September _
TELEPHot Duration Reason Method LER System Comp.
Cause & Corrective Ty(pe (hours)
(2) of No.
Code Code Action to No.
Date 1)
Shutdown (4)
(5)
Prevent Recurrence (3)
None
- ?
h 1
2 3
4 F: Forced Draft IEEE 5tandard 5: Scheduled __
Reason:
Method:
' 805-1984(P805-D5)
A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test. Manual Scram C-Refueling 3-Automatic Scram-5 D-Regulator Restriction 4-Other (Explain)
- IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other-(Explain) i I
l c
-.~~.--~.+-e.++--w a
,~,+-n,,~n,,,,,,d,--
-,n,-
c,.'+-.-a an.-nn
., ~, -,, - <, -
,O-e
vn..-,,,,*.----+,,,..,-,,--ema-
<-,,,,n' E+.
,,,m-