Monthly Operating Rept for Sept 1993 for Monticello Nuclear Generating Plant
ML20057F859
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/30/1993
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9310190255
Download: ML20057F859 (5)


Text

p Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 6

October 13, 1993 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report September. 1993 Attached is the Monthly Operating Report for September, 1993, for the Monticello Nuclear Generating Plant.

ff h d VM%

Roger o Anderson Director Licensing and Management Issues c:

Director, Office of Resource Management Regional Administrator-III, NRC NRR Proj ect Manager, NRC NRC Resident Inspector j

State of Minnesota - Kris Sanda Attachment soo~u fp{

f I

es.

9310190255.930930 R{up A

PDR ADOCK 05000263 j

R PDR

OPERATING DATA REPORT 4

r

)

DOCKET NO.

50-263 l

DATE 10- 1-93 I

COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 i

OPERATING STATUS

] Notes

]

l

1. Unit Name :

Monticello

]

]

2. Reporting period:

September

]

]

3. Licensed Thermal Power (MWt):

1670

]

]

4. Nameplate Rating (Gross MWe):

569_

]

]

5. Design Electrical Rating (Net MWe):

545.4

]

]

6. Maximum Dependable Capacity (Gross MWe): __564

]

]

l

7. Maximum. Dependable Capacity (Net'MWe):

536

]

]

l

8. If Changes Occur in Capacity Ratings (Items Number 3-Through 7) Since Last i

Report, Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A

~

THIS MONTH YR.-TO-DATE CUMULATIVE

11. Hours In Reporting Period 720 6551 195072
12. Number Of Hours Reactor Was Critical 720.0 5191.0 157175.7-
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 720.0 5137.9 154414.1
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1201594 8243445 237636858
17. Gross Electrical Energy Generated (!f43) 407472 2790449 80321249

+

18. Net Electrical Energy Generated (MWH) 392633 2673478 76829365'
19. Unit Service Factor 100.0%

78.4%

79.2%-

20. Unit. Availability Factor 100.0%

78.4%

79.2%

l

21. Unit Capacity Factor (Using MDC Net) 101.7%-

176.1%

73.5%'

i

22. Unit Capacity Factor (Using DER Net) 100.0%

74.8%

72.2%

23. Unit Forced Outage Rate 0.0%

1.7%

3.7%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

.i

None
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A i

26 : Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved-j INITIAL CRITICALITY

~

INITIAL ELECTRICITY COMMERCIAL OPERATION i

o n

e R

v

~l

[

l

.y AVERAGE DAILY UNIT POWER LEVEL

~

DOCKET NO.-

50-263 UNIT Monticello__

DATE 10- l-93 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151

. MONTH OF September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)-

1 537.

17 547.

2 539.

18 547.

~

3 542.

19

546, 4

541.

20 546.

5

'540.

21 549.

]'

6 546.

22 547.

7 541.

23 549.

8 543.

24 548.

9 544.

25 547.

10 544.

26 550.

11 546.

27 547.

h i

12

545, 28 548.

{

l 13

548, 29 548.

t 14 544.

30 548.

-j 15 547.

16 548.

j INSTRUCTIONS 1

On this. format, list the average daily unit power level in MWe-Net for.each day in the reporting month.

Compute to the nearest whole megawatt.

l

' l NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE

?

i DOCKET NO.

50-263 DAT,,

10- 1-93 COMPLETED Y

't. H. Paustian l

TELEPHCJE 12/295-5151 e

t

. MONTH SEP l

r 9-1-93 to Power operation, t

f 9-30-93

' i

. i i

1

~;

i i

?

f 1

~

. i 7

' l j

Note: Power operation defined as: essentially-100% off rated' power except for weekend load drops for

~j specified surveillance testing.

i 7

t i

u

.--~c

-, +

c-

  • fF T

IRIT SHUTDOVNS AND POVER REDUCTIONS DOCKET No. 50-263' UNIT NAME Monticello DATE 1 0-01-93

+

1229N5$51 REPORT MONIH _ September _

TELEPHot Duration Reason Method LER System Comp.

Cause & Corrective Ty(pe (hours)

(2) of No.

Code Code Action to No.

Date 1)

Shutdown (4)

(5)

Prevent Recurrence (3)

None

- ?

h 1

2 3

4 F: Forced Draft IEEE 5tandard 5: Scheduled __

Reason:

Method:

' 805-1984(P805-D5)

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test. Manual Scram C-Refueling 3-Automatic Scram-5 D-Regulator Restriction 4-Other (Explain)

- IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other-(Explain) i I

l c

-.~~.--~.+-e.++--w a

,~,+-n,,~n,,,,,,d,--

-,n,-

c,.'+-.-a an.-nn

., ~, -,, - <, -

,O-e


vn..-,,,,*.----+,,,..,-,,--ema-

<-,,,,n' E+.

,,,m-