Georga Poufr C0mpany 40 in emm.3 Ceoer Pm way v
- - PMt O"ce box 1295 D;rmevyam. Aia!,.tma WO1 Tei qAarie 205 R77 7122 Georgia Power c.x. uccoy v w en. m.-
u.. a a, nyfe prryy >
tt+: Sout*em ejec uc Lgtem LCV-0179 October 14, 1993 Docket No.
50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT SPECIAL REPORT STEAM GENERATOR TUBES PLUGGED DURING THIRD UNIT 2 REFUELING OUTAGE In accordance with the requirements of the Vogtle Electric Generating Plant Unit I and 2 Technicai Specifications, sections 4.4.5.5.a and 6.8.2, Georgia Power Company hereby submits this special report related to the number of steam generator tubes plugged during the Unit 2 third refueling outage (2R3).
After completion ofinservice inspection (ISI) on October 2,1993, two (2) tubes in steam generator No. I that had been previously plugged with Inconel 600 plugs were replugged with Inconel 690 plugs. This reflects our implementation of a previously stated comnsttment.
Complete ISI results will be submitted within 12 months per Technical Specification 4.4.5.5.b.
Sincerely, f
C. K. McCoy CKM/NJS J800R0 0>
9310190094 931014 E
I IIb PDR ADOCK 05000425 M
2 G
PDR E
L
,h Special Report 2-93-4 L
LCV-0179 Page 2 xc:
Georgia Power Company l
Mr. J. B. Beasley, Jr.
Mr. M. Sheibani 1
NORMS U. S. Nuclear Renulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR
{
Mr. B. R. Bonser, Senior Resident Inspector, Vogtle i