ML20057F554

From kanterella
Jump to navigation Jump to search
Notification of 931109 Meeting W/Epri in Rockville,Md to Discuss Changes to EPRI Requirements Document in Area of Seismic Design.Draft Agenda Encl
ML20057F554
Person / Time
Issue date: 10/12/1993
From: Joshua Wilson
Office of Nuclear Reactor Regulation
To: Borchardt R
Office of Nuclear Reactor Regulation
References
PROJECT-669A NUDOCS 9310180177
Download: ML20057F554 (4)


Text

_ __ -__ __ - ____-.

Project No. 669 October 12, 1993 MEMORANDUM FOR:

R. W. Borchardt, Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR FROM:

James H. Wilson, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR

SUBJECT:

NOTICE OF PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND THE ELECTRIC POWER RESEARCH INSTITUTE (EPRI)

DATE AND TIME:

November 9, 1993 (8:30 a.m. - 4:30 p.m.)

l LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Room 6-B-11 PURPOSE:

To discuss changes to EPRI Requirements Document in the area of seismic design (draft agenda enclosed).

PARTICIPANTS:

NRC EERL W. Russell J. Trotter G. Bagchi B. Puschek R. Rothman R. Kassawara D. Terao J. Reynolds N. Chokshi J. Reed, et al.

J. H. Wilson, et al.

(Original signed by)

James H. Wilson, Project Manager Standardization Project Directorate l

Associate Directorate for Advanced Reactors and License Renewal, NRR l

Enclosure:

Proposed Agenda l

cc w/ enclosure:

l See next page DISTRIBUTION:

93101eo377 931012 See next page 6$A PRN i

PDR

  • Meetings between the NRC technical statt anu applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reois.tn 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-1108.

OFC:

LA:PDST:ADAR PM:PDST:ADAR SC:PDST:ADAg p " kl

/. )'" 4 ) f l /{i-JHWilson:tz RArchitzel' NAME: PShea.,

DATE: 10/jf/

10//%/9$

10/@/93

'[

0FFICIAL DOCUMENT COPY: MTG1109.JHW

{g 3r i

EPRI Project No. 669 1

1 cc:

Mr. R. P. Mcdonald, RP - ARC Bin 854 Southern Company Services Room 518 P.O. Box 2625 Birmingham, Alabama 35202 Mr. John Trotter Nuclear Power Division

)

Electric Power Research Institute Post Office Box 10412 Palo Alto, California 94303 Mr. Brian A. McIntyre, Manager Advanced Plant Safety & Licensing Westinghouse Electric Corporation j

Energy Systems Business Unit Post Office Box 355 Pittsburgh, Pennsylvania 15230 Mr. Joseph Quirk GE Nuclear Energy Mail Code 782 i

General Electric Company 175 Curtner Avenue i

San Jose, California 95125 Mr. Stan Ritterbusch Combustion Engineering 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095 Mr. Sterling Franks U.S. Department of Energy NE-42 4

Washington, D.C.

20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Room 8002 Washington, D.C.

20503

. ~

DRAFT AGENDA Proposed ALWR Requirements Document Seismic Changes 8:30 a.m. - 4:30 p.m.

Room 6 B-ll One White Flint North 11555 Rockville Pike Rockville, MD 20852 8:30 - 8:45 Introduction NRC 8:45 - 9:00 ALWR opening remarks J. Reynolds Meeting objectives Incentives motivating URD changes 9:00 - 9:30 Summary of URD Changes B. Puschek By categories Comparison with SER conclusions 9:30 - 10:00 High frequency seismic effects R. Kassawara Introduction

=

Application of method to site-specific spectrum versus component level l

Objectives from meeting 10:00 - 10:10 BREAK All 10:10 - 12:00 High frequency seismic effects J. Reed Description of methodology in TR-102470 1

Questions / discussion NRC schedule for review / conclusion

=

Identify additional actions, if any 12:00 - 1:00 LUNCH All 1:00 - 2:00 Discussion of remaining URD changes B. Puschek 2:00 - 3:00 NSSS vendor assessment of URD changes GE, ABB/CE, Impact to designs / certification schedule Westinghouse 3:00 - 3:10 BREAK All 3:10 - 4:20 Item-by-item discussion of URD changes 4:20 - 4:30 Concluding remarks NRC Enclosure

c' DISTRIBUTION:

Docket File PDST R/F SBajwa, 12G18 PDR RArchitzel JHWilson PShea EJordan, MNBB3701 TGody, ED0 JMoore, 15B18 NRR Mailroom,12G18 NMarkisohn DCrutchfield WTravers OPA RBorchardt TMurley/FMiraglia Receptionist, 0WFN ACRS (11)

GBagchi, 7H15 RRothman, 7H15 DTerao, 7H15 NChokshi, NS217A WRussell, 12G18 RKenneally, RES AMurphy, RES