ML20057F149
| ML20057F149 | |
| Person / Time | |
|---|---|
| Issue date: | 10/06/1993 |
| From: | Joshua Wilson Office of Nuclear Reactor Regulation |
| To: | Miraglia F, Murley T, Russell W NRC |
| References | |
| PROJECT-669A NUDOCS 9310140203 | |
| Download: ML20057F149 (3) | |
Text
,
j o arc k
UNITED STATES f.kZ1[t}
NUCLEAR REGULATORY COMMISSION
=
WASHINGTON D.C. 20555-0001 October 6, 1993 Project No. 669 MEMORANDUM FOR:
T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Wiggins W. Bateman, ED0 F. Gillespie B. D. Liaw M. Slosson S. Varga A. Thadani Operations Center J. Calvo E. Adensam C. Rossi THRU:
R. W. Borchardt, Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FROM:
James H. Wilson, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
DAILY HIGHLIGHT - FORTHCOMING MEETING WITH THE ELECTRIC POWER RESEARCH INSTITUTE (EPRI) ON PASSIVE AUTO CATALYTIC RECOMBINERS DATE AND TIME:
October 7, 1993 (9 a.m. - 11 a.m.)
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 13-B-9 PURPOSE:
To discuss design requirements for hydrogen control in advanced light-water reactors.
SDP %u' iM"iu u a u uL -[
L UYIQ POEO ImuL ut Oxyd &&9 1300P8
{Q 01 3 931006 669A PDR g g
i
-2_
October 6, 1993 PARTICIPANTS *:
NRC
[EB1 T. Kenyon S. Additon A. Drozd U. Wolff J. Monninger C. Hoxie (Original signed by)
James H. Wilson, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation cc: See next page
- Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting. Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the l
public who wish to attend should contact me at (301) 504-1108.
DISTRIBUTION:
Docket File PDST R/F SBajwa, 12G18 RBorchardt PDR RArchitzel MXFranovich PShea OPA EJordan, MNBB3701 TGody, EDO ACRS (11)
JMoore, 15B18 NRR Mailroom, 12G18 JHWilson NMarkisohn ADrozd, 8D1 JMonninger, 801 CHoxie, 8D1 JHWilson TWambach SMagruder CPoslusny MMalloy TKenyon 0FC:
LA:PDST:ADAR PM:PDST:ADAR SC:PDST:ADA,R I'
NAME:
PShea JHWilsonytz RArchitzel 10//p/93 10/ [2/93'7 10/?/93 DATE:
0FFICIAL DOCUMENT COPY: DH1007.JHW I
i 1
]'
=
i EPRI Project No. 669 cc:
Mr. R. P. Mcdonald, RP - ARC Bin 854 Southern Company Services Room 518 P.O. Box 2625 i
Birmingham, Alabama 35202 Mr. John Trotter i
Nuclear Power Division Electric Power Research Institute I
Post Office Box 10412 Palo Alto, California 94303 Mr. Brian A. McIntyre, Manager Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 i
Pittsburgh, Pennsylvania 15230 i
Mr. Joseph Quirk GE Nuclear Energy Mail Code 782 General Electric Company i
175 Curtner Avenue San Jose, California 95125 Mr. Stan Ritterbusch Combtstion Engineering 1000 Prospect Hill Road i
Post Office Box 500 t
Windsor, Connecticut 06095 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.
20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.
Room 8002 Washington, D.C.
20503 i