. (ps"%q[o UNITED STATES g
NUCLEAR REGULATORY COMMISSION w
g WASHINGTON, D. C. 20555
%...+ }
October 5, 1993 Project No. 672 Mr. Peter M. Williams HTGR Division Office of Advanced Reactor Programs U.S. Department of Energy, NE-451 Washington, DC 20585
Dear Mr. Williams:
SUBJECT:
TECHNICAL REVIEW REQUESTED OF NUCLEAR REGULATORY COMMISSION (NRC)
CONTRACTOR REPORT 2-2-93 ON THE MODULAR HIGH-TEMPERATURE GAS-COOLED REACTOR (MHIGR) DESIGN In my letter of July 8,1993, I provided you with Technical Evaluation Report (TER) 2-2-93, " Review of Computer Codes Used to Calculate MHTGR Accident Dose Consequences," on the General Atomics computer codes used to evaluate the radiological consequences of accidents for the MHTGR design.
This TER was developed for the NRC by a contractor.
The TER was classified " Applied Technology" because it was based on documents that the Department of Energy (DOE) has classified " Applied Technology." DOE has stated that Applied Technology information on the MHTGR design must be kept from the public at this time.
i In my letter of July 8,1993, I requested that you identify the portions of the original TER that contained Applied Technology information.
You responded in your letter of August 26, 1993, and your staff clarified the letter in a telephone call on October 1,1993, adding additional areas of the TER that had i
Applied Technology information.
Based on this telephone call, there may be still other areas of the TER that will be classified " Applied Technology."
Because the areas that have been classified " Applied Technology" are so extensive, we have decided not to issue a non-Applied Technology report of the TER at this time.
This would have been the original TER without the identified " Applied Technology" information.
You are now requested to provide comments on the technical discussions and conclusions of the TER within 75 days of receipt of this letter. We are not providing you a copy of the TER at this time because you were provided with such a copy in our letter of July 8,1993. This schedule will allow us to incorporate your comments into our preapplication safety evaluation report on the MHTGR design.
M{m Q9 g e,m ;n
,g a t u t u.+ a w e ; &c.
Ogd J Y2 idOO11 3Fo3 9310140139 931005 PDR,PROJ 672 A PDR lkO n
4-I a
Mr. Peter M. Williams October 5, 1993 MHTGR Project No. 672 cc: Jerry D. Griffith, Director Dave A. Dilling Office of Advanced Reactor Programs Bechtel National, Inc.
l U.S. Department of Energy, NE-45 50 Beale Street Washington, D.C.
20545 P.O. Box 193965 t
San Francisco, California 94119 Sterling Franks Technical Director Office of MHTGR Walter J. Parker New Production Reactor Program Stone and Webster Engineering U.S. Department of Energy, NP-61 Corporation Washington, D.C.
20545 245 Summer Street Boston, Massachusetts 02107 J. David Nulton, Associate Deputy Assistant Secretary for Reactor Sten Caspersson Systems, Development, and Technology Combustion Engineering U.S. Department of Energy, NE-40 100 Prospect Hill Road Washington, D.C.
20545 Windsor, Connecticut 06095 i
Salma El-Safwany Henry Jones U.S. Department of Energy Oak Ridge National Laboratory Nuclear Energy Division P.O. Box 2009 1333 Broadway Building 9102-1, Mail'Stop 8030 Oakland, California 94612 Oak Ridge, Tennessee 37831-8030 Dr. Daniel L. Mears Steve Goldberg Gas-Cooled Reactor Associates Budget Examiner 10240 Sorrento Valley Road, Suite 300 Office of Management and Budget San Diego, California 92121-1605 725 17th Street, NW l
Washington, D.C.
20503 Lloyd Walker Modular HTGR Plant Design Dr. Lee S. Schroeder Control Office - West Assistant Director for Physical P.O. Box 85608 Sciences and Engineering San Diego, California 92186-9784 Office of Science and Technology i
OE0B Ray R. Mills Washington, D.C.
20503 Modular HTGR Plant Design Control Office - East 3226 Tower Oaks Boulevard j
Suite 300 Rockville, Maryland 20852 George C. Bramblett, Director MHTGR-NE Project Division General Atomics P.O. Box 85608 i
San Diego, California 92186-9784
g Mr. Peter M. Williams October 5, 1993 This reporting requirement affects nine or fewer respondents and, therefore, is not subject to Office of Management and Budget review under P.L.96-511.
If you have any questions regarding this request, please contact me at (301) 504-3128.
Sincerely,
/
\\M Jack N. Donohew, fr. Project Manager Advanced Reactors Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation cc: See next page Distribution:
- Central; File-PDR PDAR R/F MHTGR R/F DCrutchfield WTravers EThrom JDonohew PShea OGC 15/B/18 ACRS(10)
P-315 LShotkin NLN-353 FEltawila NLN-344 LA PD AR:ADAR PM:%AELADAR PD:tD44 ADAR PShea JND
- sa E
_b' 93 10/
g / /93 OFFICIAL RECORD COPY Document Name: MHTGRTER.RAI