ML20057F033
| ML20057F033 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/07/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Barkhurst R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20057F034 | List: |
| References | |
| NUDOCS 9310140035 | |
| Download: ML20057F033 (5) | |
See also: IR 05000382/1993027
Text
.
pp Rf C
UNIT E D ST ATES
y.
?g
NUCLEAR REGULATORY COMMISSION
,
( YI
REGloN IV
8
611 RYAN PLAZA DRIVE. SulTE 400
o.
[
AR LINGTON, T E XAS 76011 8064
s
OCT - 7 1993
Docket:
50-382
License: NPF-38
-
Entergy Operations, Inc.
>
ATTN: Ross P. Barkhurst, Vice President
Operations, Waterford
P.O. Box B
Killona, Louisiana 70066
SUBJECT:
NRC INSPECTION REPORT 50-382/93-27
i
'
This refers to the inspection conducted by Mr. E. J. Ford of this office, and
the inspectors identified in this report, during the period August 8 through
i
September 18, 1993. The inspection included a review of activities authorized
for your Waterford Steam Electric Station, Unit 3, facility.
At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed report..
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
,
and representative records, interviews with personnel, and observation of
activities in progress. The results of this inspection are documented in the
~i
enclosed report.
I
During our review of Unresolved Item 382/9323-01, we found that your staff
I
determined that inadequate procedures allowed a system to be returned to
service following maintenance prior to resetting a valve limiter and that this
was in violation of Technical Specification 6.8.1.
This violation will not be
subject to enforcement action because your efforts in identifying and
correcting the violation meet the criteria specified in paragraph VII.B.(2) of
Appendix C to 10 CFR Part 2 of the NRC's " Rules of Practice." This violation
appears to be an isolated occurrence in which your staff took prompt and
effective actions to correct the problem.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
i
9310140035 931007
ADOCK 050003B2
G
u
. - .
-
-
.
..
-
-.
-_ ._-
.
.
.
.
t
,
Entergy Operations, Inc.
-2-
,
I
yua have any questions concerning this inspection, we will be pleased
+
de..s.u
to discuss them with you.
Sincerely,
l
O
I
. Bill Beach, D' rec-.or
Division of Reac grf ro e
ts
Enclosure:
Appendix - NRC Inspection Report
50-382/93-27 w/ attachments
t
cc w/ enclosure:
Entergy Operations, Inc.
l
ATTN: Harry W. Keiser, Executive
Vice President & Chief Operating Officer
P.O. Box 31995
Jackson, Mississippi 39286-1995
.
Entergy Operations, Inc.
ATTN: John R. McGaha, Vice President
Operations Support
P.O. Box 31995
Jackson, Mississippi 39286
Wise, Carter, Child & Caraway
ATTN:
Robert B. McGehee, Esq.
P.O. Box 651
Jackson, Mississippi 39205
Entergy Operations, Inc.
ATTN:
D. F. Packer, General
.
Manager Plant Operations
P.O. Box B
Killona, Louisiana 70066
4
!
Entergy Operations, Inc.
ATTN:
L. W. Laughlin
Licensing Manager
P.O. Box B
.
Killona, Louisiana 70066
r
Chairman
5
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
(
i
!
,
,
-
_
.
l
1
.
Entergy Operations, Inc.
-3-
,
Entergy Operations, Inc.
<
'
ATTN:
R. F. Burski, Director
Nuclear Safety
,
P.O. Box B
,
Killona, Louisiana 70066
l
l
!
Hall Bohlinger, Administrator
Radiation Protection Division
I
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
i
Parish President
St. Charles Parish
!
P.O. Box 302
i
Hahnville, Louisiana 70057
Mr. William A. Cross
Bethesda Licensing Office
3 Metro Center
Suite 610
Bethesda, Maryland 20814
i
Winston & Strawn
,
ATIN: Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
,
Washington, D.C.
20005-3502
,
i
I
i
,
<
'
l
1
__
i
.
Entergy Operations, Inc.
-4-
OCT - 7 t993
.
bcc to DMB (IE01)
bcc distrib, by RIV:
J. L. Milhoan
Resident Inspector
-
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/D)
Section Chief (DRP/TSS)
R. Rosano, MS: 7H5
,
!
t
!
!
,
t
en .
. _ ,
RIV:SRIhI.
DRP/D M b
C:DRP/D db
D:DRP Y
d
EJFord;df'(
SMcCrory
TFStetka
ABBeach rie
p/1/93
10/'7/93
10/ 1 /93
10/7/93\\
P
,
.N
Entergy Operations, Inc.
-4-
OCT - 71993
.
-
bcc to DMB (IE01)
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/D)
Section Chief (DRP/TSS)
R. Rosano, MS: 7H5
130004
N
__t
..
.
RIV:SRIh.
DRP/D,,f)h
C:DRP/D db
D:DRP h
l
I
SMcCrory
TFStetka
ABBeach y
EJFord;df
Ib /-1/93
10/7/93
10/ 1 /93
10/~i/93\\
l[t
i