ML20057E991
| ML20057E991 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/05/1993 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Stankiewicz J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 9310130460 | |
| Download: ML20057E991 (2) | |
Text
.
(
+
[
OCT 5 1993 e
b Docket Nos. 50-277 50-278 l
Philadelphia Electric Company Peach Bottom Atomic Power Station ATTN:
Mr. J.
Stankiewicz Superintendent - Training RD #1, Box 208 i
Delta, Pennsylvania 17314 l
Dear Mr. Stankiewicz:
The purpose of this letter is to inform you of individual examination results for your applicants on the initial examination conducted on August 30, 1993 - September 2,-1993, by my staff at your facility.
This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021.
This information is considered to be " proprietary" in accordance with 10 CFR 2.790 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing
' Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, (NRC Form 157) for each applicant.
Contained therein are the deficiencies noted for each applicant.
In accordance with your Systems Approach to Training (SAT) Program, we' expect that you will review these results'and provide appropriate remedial training for these individuals independent of their overall pass status.
Each applicant has authorized the release of this information'to your facility by signing Block 19A of NRC Form 398. are copies of the licenses issued for those who passed and the denial letter for the one who failed the examination.
Official Record Copy 3 2 ) "r3 m"
/
9310130460 931005 (rt$'O PDR ADDCK 05000277
- ) 4r y
PDR is
l
+
i Peach Bottom Atomic Power Station i
Thank you for your cooperation in this matter.
Please refer any 5
questions you have to Richard J.
Conte at 215-337-5210.
j Sincerely, wiginal Sign 80 378 Lee H.
Bettenhausen, Chief Operations' Branch l
Division of Reactor Safety
Enclosures:
I 1.
ES-501-2, Power-Plant Licensing Examination Results Summary 2.
ES-303-1 and 303-2, Individual Examination Results 3.
Licenses and Denial letter i
cc w/o encls:
G.
D.
Edwards, Plant Manager Public Document Room (PDR)
Local Public Document Room (LPDR)
}
Nuclear Safety Information Center (NSIC) i bec w/o enclosures:
l Region I Docket Room (w/ concurrences)
[
Master Exam File D.
Florek, DRS
{
R.
Conte, DRS t
/
I RI:DRS RE35 DRp; RI:DRS i
curley Flb k
dbon 66-Bettenhausen d
M l
10/p /93 10/3/93 10/> /93 10/f7/93 official Record Copy j
1
.i i
~-.
- - - - -