Advises That Restart Plan,Rev 2 Acceptable.Staff Will Continue to Conduct Insps to Determine If Reasonable Assurance Exits That Activities Sufficient to Return Plant to Safe & Reliable Operation
ML20057E683
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/28/1993
From: Ebneter S
NRC Office of Inspection & Enforcement (IE Region II)
To: Medford M
Tennessee Valley Authority
References
NUDOCS 9310130031
Download: ML20057E683 (4)


Text

jj bw p

i SEP 2 81993 Docket Nos. 50-327, 50-328 License Nos. DPR-77, DPR-79 l

Tennessee Valley Authority ATTN: Dr. Mark 0. Medford, Vice President Technical Support 3B Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2601

Dear Dr. Medford:

SUBJECT:

SEQUOYAH NUCLEAR PLANT (SQN) RESTART PLAN, REV. 2 This refers to the subject restart plan. My staff finds your plan acceptable l

as submitted. My staff will continue to conduct inspections to determine if there is reasonable assurance that your activities are sufficient to return Sequoyah Units 1 and 2 to safe and reliable operation.

l l

As part of these inspection activities, the NRC will conduct inspections during the Unit 2 startup and power ascension. Appendix 11 of the SQN Restart Plan, Rev. 2, contains your Startup and Power Ascension Plan. This appendix establishes your management's plan for ensuring the safe, controlled, and i

i deliberate return to service of the Sequoyah Nuclear Plant.

The Startup and Power Ascension Plan establishes Unit 2 assessment hold points at which plant conditions are maintained until a prescribed assessment of site readiness for further progression is completed.

Specifically, the following l

hold points are established in your Startup and Power Ascension Plan:

I Mode 5 prior to Mode 4 entry

=

Mode 3 prior to Administrative Mode 2 entry (prior to pulling control rods to approach and achieve criticality) 30 percent reactor +/- 10 percent

=

65 percent reactor +/- 10 percent

=

90 percent reactor +/- 5 percent 100 percent reactor (assessment to approve continued operation)

Your startup plan requires concurrence of the Regional Administrator or his designee prior to entering Mode 2.

As discussed between Mr. Fenech, Vice President, Sequoyah and Mr. Merschoff of my staff on September 24, 1993, I understand you will also obtain the Regional Administrator's or his designee's concurrence prior to exceeding your 30 +/- 10 percent hold point. The intent of this concurrence is to facilitate the NRC's independent assessment of the site's readiness for further progression and continued operation. This request does not preclude licensed responsibilities to take Unit 2, if determined necessary, to a reduced power level or operating mode to ensure safe and stable unit operation.

t 9310130031 930928

'b PDR ADOCK 05000327 G

PDR

]

SEP 2 8 m Tennessee Valley Authority 2

Please confirm in writing your plans to obtain NRC approval prior to exceeding the specified hold points.

Sincerely, (Original signed by S. Ebneter)

Stewart D. Ebneter Regional Administrator cc:

(See page 3) 1 l

SEP 2 81933 Tennessee Valley Authority 3

cc:

W. H. Kennoy, Director Michael H. Mobley, Director Tennessee Valley Authority Division of Radiological ET 12A Health i

400 West Sumit Hill Drive 3rd Floor,.L and C Annex Knoxville, TN 37902 401 Church Street Nashville, TN 37243-1532 R. M. Eytchison, Vice President General Counsel Nuclear Operations Tennessee Valley Authority Tennessee Valley. Authority ET IIH 3B Lookout Place 400 West Summit Hill Drive 1101' Market Street Knoxville, TN 37902 Chattanooga, TN' 37402-2801 County Judge B. S. Schofield, Manager Hamilton County Courthouse Nuclear Licensing and

.: Chattanooga, TN 37402 Regulatory Affairs Tennessee Valley Authority Bill Harris 58 Lookout Place Route 1, Box 26 1101 Market Street Ten Mile, TN 37880

. Chattanooga, TN 37402-2801 Robert Fenech, Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Soddy-Daisy, TN 37379 TVA Representative Tennessee Valley Authority Rockville Office 11921 Rockville Pike Suite 402 Rockville, MD 20852 Ralph H. Shell Site Licensing Manager Sequoyah Nuclear Plant P. O. Box 2000-Soddy-Daisy, TN 37379

SEP 2 8 1993 Tennessee Valley Authority 4

bec:

J. Johnson, RII P. J. Kellogg, RII S. E. Sparks, RII B. Bordenick, OGC D. E. LaBarge, NRR Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Comission 2600 Igou Ferry Soddy-Daisy, TN 37379 i

i i

\\

DRP/RII DR 4

PD RFt PD/N i

SSparks AGib n y

tw 9/ r /93 FH ch DL rgi 9/,

/93 9/.3 9/

95 og DRP/ I DRP/R.

DRP II D

PK ogg WH d

9/g3/93 9/13 / 3 JUrlenjak chaff 9/g93

' 93 port

~

'