ML20057E412
| ML20057E412 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/22/1993 |
| From: | Merschoff E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Beckham J GEORGIA POWER CO. |
| References | |
| NUDOCS 9310120114 | |
| Download: ML20057E412 (22) | |
Text
.-
s SEP 221993 Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 Georgia Power Company ATTN: Mr. J. T. Beckham, Jr.
Vice President, Plant Hatch Nuclear Operations P. O. Box 1295 Birmingham, AL 35201 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- HATCH UNITS I and 2 This refers to the management meeting conducted in the Region II office on September 20, 1993. This ceeting was held at your request to discuss health
)
physics practices at Hatch.
It is our opinion that the meeting was mutually beneficial. A list of attendees and a copy of your handouts are enclosed.
In accordance with 10 CFR 2.790 of the NRC's " Rule of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
'M4 af) f.)bD N. WW
)
Ellis W. Merschoff, Director Division of Reactor Projects
Enclosures:
i 1.
Management Meeting Presentation Material 2.
List of Attendees cc w/encls:
J. D. Woodard Senior Vice President Georgia Power Company Nuclear Operations P. O. Box 1295 4
Birmingham, AL 35201 cc w/encls: Continued page 2 9310120114 930922 U
PDR ADOCK 05000321 p g[
P PDR g
SEP 221993 Georgia Power Company 2
cc w/encls: Continued H. L. Sumner General Manager, Plant Hatch Georgia Power Company Route 1, Box 439 Baxley, GA 31513 S. J. Bethay l
Manager Licensing - Hatch Georgia Power Company P. O. Box 1295 i
Birmingham, AL 35201 Ernest L. Blake, Esq.
Shaw, Pittman, Potts and J
Trowbridge 2300 N Street, NW i
Washington, D. C.
20037 Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, SW Atlanta, GA 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Thomas Hill, Manager Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta, GA 30354 Chairman Appling County Commissioners County Courthouse Baxley, GA 31513 Dan H. Smith Vice President Power Supply Operations Oglethorpe Power Corporation 2100 E. Exchange Place Tucker, GA 30085-1349 cc w/encls: Continued page 3
Georgia Power Company 3
SEP 2 21993 cc w/encls: Continued Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker 12th Floor 1050 Connecticut Avenue, NW Washington, D. C.
20036 bec w/encls:
K. N. Jabbour, NRR A. R. Herdt, RII P. H. Skinner, RII W. E. Cline, RII W. H. Rankin, RII D. A. Seymour, RII D. W. Jones, RII E. B. Pharr, RII Document Control Desk NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 725 Baxley, GA 31513 FILE: G:\\DRP\\HTMTSUM.DAS Q,Ig]lSS RII:DRP RIQpRP RI P
R
/
eymour PJknner AH dt
'WCline C j7,j/93 g/p93 k/p/93
<j'/d/93 2
=
)
ENCLOSURE 1 i
l MANAGEMENT MEETING PRESENTATION MATERIAL I
i I
l i
t i
i 1
l i
I I
i r
l 1
l l
4 l
1 I
l l
NRC PRESENTATION l
a 4
1 1
1 i
i h
i l
September 20,1993 l
l l
i 1
)
?
l Plant Hatch Health Physics Dept.
4 i
i i
i 2
'l 1
l NRC-HATCH COMMUNICATION i
i i
i
. Meeting requested by GPC j
l To facilitate additional communication with i
the NRC.
i To offer assurance of Georgia Power Company's commitment to a safe environment for its workers as well as the public.
P J
M NRC PRESENTATION
,..m....._
1
~
3 s'
l PROBLEM AREAS i
i I
i i
I l
High Rad Areas i
I Locked High Rad Areas Total Plant j
Exposure i
i 1
i l
NRC PRESENTATION i
3 i
i' CORREChlVE j
ACTIONS l
HIGH RAD AREAS Stop Work Order by Plant General Manager General Manager Bulletins Event Review Teams Upgrade of Postings Door Upgrade Locked Door Double Verification Increased Management Attention Plantwide ALARA Safety Meeting NRC PRESENTATION
,j.-
s l
CORRECTIVE l
ACTIONS 1
HIGH l
EXPOSURE I
j Formalized ALARA Group Cameras i
Shielding & Hot Spot j
Reduction i
Quality Checks Radworker l
Ownership Chemical Decon j
l NRC PRESENTATION L--
- ~
- ~
i
~'
CORRECTIVE ACTIONS i
HIGH I
i EXPOSURE l
(Cont'd) i j
Job Scope Reduction i
j Radworker Questionnaire i
Surveillance Frequency Reduction l
i i
l i
i NRC PRESENTATION 1
4
IMPROVEMENTS DOSE REDUCTION Plant Model Chemistry (source term reduction) 30 Day Outage Schedule Continued Management Attention Chemical Decons (RECIRC, RWCU, RHR)
Additional Cameras I
Soft Shutdown Depleted Zinc Hot Spot Flusher a
NRC PRESENTATION
IMPROVEMENTS i
I l
l l
MISCELLANEOUS i
l Electronic Dosimetry Telemetry Dosimetry l
Revised 10CFR20 l
Implementation Continuing Training Low Dose Signs i
New PC's i
l Elmers' Glue ALARA Pamphlet
)
i i
s j
NRC PRESENTATION 1
i I
b
~~
I l
RESULTS l
NO HIGH RAD l
AREA ACCESS i
PROBLEMS S I N. C E A P R I L 3
1993 i
l NO LOCKED l
HIGH RAD AREA PROBLEMS j
SIGNIFICANT l
DOSE REDUCTION 1
j NRC PRESENTATION 1
.-r-,.
r,
\\
~
Georgi ^
?ower Company
?.~.a n t 3.
Ea;ca Historical Radiation Exposure 2000
~
1.670 1.4ss f g 1500-d5
$N s'-
N Q 1000 818 816/{J g/
l p
/
e-0 1985 1986 1987 1988 1989 1990:1991 1992 1993
~.,
\\
'992 3W R Co ec--ive V a n rem 3 er Uni ~
Averag e Exposure rmA US BWR's 800 [
MSSR1 US BWR Average j
g
.;. f E 700 Hatch b
600
=
23 L
k500 jr 3
1; 111 f
f:
ll 1Ui3ljj]lllj 54 ll l
l 53 1
I ll I ' l f l ss s
5 U.S.
BWR's By Rank
~
\\
'991 3WR Co ec ive k a n rem Average Ex 30su re 3 er Uni ~
t7 a A US BWR's g
1 00 h
1300 g,E0 l l
3 1000 L.
900
/
h 1,
800 "3 3 7
]k j
E
[-
g 600
- 10) Ii!II 6
$0 E 1
i 1
aaHHi7r7l[
l h
l1,li,j]fl7e h
300
)]jil 200 l l l l h
s U.S.
BWR's By Rank
2 er uni Verag EXpOSu r/ N A US BWR's 800 -
tehw US BWR Average j
Hatch j yf 700 l}
f 3
600
]
15
~
ljil f
y' If il!N ij]!
54 ill 83 I!illllilllll l3ll
!!il l 1
-j U.S.
BWR's By Rank
1 G:?C
?.an; 3.
.?. ate.a Historical Radiation Exposure
":aree Year 30::ing Average 2000 O
1500
%s Y $m i
aI t
ya t
NO 1000 i
mp as e m
c c C' 4~
500 i
.)
O 1987 -1993*
^
1
.a.
._e.
. s _ a..s
...t..
gens
.........,,,,,e
,s e in n,
n,,,,,
-......._._..._...._.,.._.._..m
LM.SN%\\4T$\\fbl%\\(GNS) 9 HATCH UNIT 2 AVERAGE RECIRC PIPE DOSE RATES 600 Projected Dose Rote EOC 11 g
550 500 g
( 450 Condenser Retube (RF-8)
E 400 E
3, ).
v 350 338 8
i 4
yl 300 jg coc-i.
r y-a
-Q g=
p 250 e
"f
=
200 g
150
}
, __, m N8 EoC 3
.g Wg O
u2 100 g
roc a 7 evvvvveveveve l
55%
i e
R 8.1 58 i an
.=.
MB. N\\%\\%L\\hDD (603h)-
i HATCH UNIT 1
AVERAGE RECIRC PIPE DOSE RATES 500 Projected Dose Rote EOC 15 450 cEZIP-8/90 Condenser Retube (RF-12)
U EOC 13 C
h 350 EOC 12 HWC-9/87 v 300 1,
d 250 EOC 11 9,
. 24 F-y 200 EOC 10 Ld 150 g-a 100 50 AE A
0 Y
9 Y
Y Y
Y Y
Y Y
Y
~
5 5
e e
s 5
R
..su u m ag e s pse Georgia Power Company
?Lant 3.
Eauch Elstorical Rac.1ation Exposure 2500
=
2000 d
~
Oy
~
gl 1500 a
' 'j,
d g
d 1000 l c E
1
~
500 1
EI
/ /
0 78 77 78 79 80 81 88 83 84 86 88 87 88 89 90 91-92 93*
~. =
i
/
j l
s i
ENCLOSURE 2 l
LIST OF ATTENDEES i
U.S. NUCLEAR REGULATORY COMMISSION W. E. Cline, Chief, Radiological Protection and Emergency Preparedness Branch i
(RPEP), Division of Radiation Safety and Safeguards (DRSS), RII I
W. H. Rankin, Chief, facilities Radiological Protection Section (FRP), RPEP, i
DRSS,'RII K. N. Jabbour, Project Manager, Project Directorate II-3,.0ffice of l'
Nuclear Reactor Regulation D. A. Seymour, Project Engineer, Section 38, Branch 3, Division of Reactor l
Projects, RII l
D. W. Jones, Senior Radiation Specialist, Radiological Effluents and Chemistry r
Section, RPEP, DRSS, RII l
E. B. Pharr, Radiation Specialist,- FRP, RPEP, DRSS, RII GEORGIA POWER COMPANY j
i I
D. Smith, Superintendent, Health Physics l
W. Kirkley, Manager, Health Physics and Chemistry S. Tipps, Manager, Nuclear Safety and Compliance G. Riner, Health Physicist M. Link, Supervisor, Health Physics i
l 1
j i
L l
L
.;