ML20057E088
| ML20057E088 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/27/1993 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Broughton T GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20057E089 | List: |
| References | |
| NUDOCS 9310070264 | |
| Download: ML20057E088 (3) | |
See also: IR 05000289/1993019
Text
_
_
_
-
._
_
_ . .
t
f
-
.
.
'
SEP 2 71993
1
.
i
l
I
!
f
Docket No. 50-289
3
Mr. T. Gary Broughton
Vice President and Director, TMI-1
GPU. Nuclear Corpomtion
{
Three Mile Island Nuclear Station
'
Post Office Box 480
!
Middletown, PA 17057-0191 ~
!
t
Dear Mr. Broughton:
!
SUBJECT: NRC INSPECTION REPORT NO. 50-289/93-19 -
r
!
This letter transmits the findings of the resident safety inspection conducted by -
.
l
Ms. M. Evans and Mr. D. Beaulieu from August 1,1993 - September 9,1993, at the Three-
.
Mile Island Nuclear Station,-Unit 1. The inspectors based these findings on observations of
1
activities, interviews, and document reviews, and discussed them with you and other_
{
members of your staff at the conclusion of the f.ispection period. Inspector observations -
l
indicated safe and conservative operation.
i
i
We reviewed your corrective actions associated with several incidents that occurred during
1
- the last refueling outage. These' incidents were safety significant and occurred 'due'to__
l
procedural and performance related problems. We noted that you have improved the quality
i
of procedures for infrequently performed or critical evolutions and the manner in which some
surveillances are performed. However, since incidents involving performance and procedure
j
related weaknesses continued to occur during the operating cycle, we will continue to;
l
evaluate your corrective actions in this area.
!
'
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosure will be placed in the NRC Public Document Room. We appreciate your
cooperation.
Sincerely,
Orignisigd Dy
i
A. Randolph Blough, Chief
Projects Branch No< 4
,
'
Division of Reactor Projects
Enclosure: NRC Inspection Report No. 50-289/93-19
,
i
9310070264 930927
!
I
!
PDR~ ADDCK 05000289'
e
1
[
a
eDn
!
a
.
4
'
SEP 2 71993
!
GPU Nuclear Corporation
2
cc w/ encl:
'
R. E. Rogan, TMI Licensing Director
'
M. J. Ross, Operations and Maintenance Director, TMI-1
J. Fornicola, Licensing and Regulatory Affairs Director
TMI-1 Licensing Department
E. L. Blake, Jr., Esquire
TMI-Alert (TMIA)
K. Abraham, PAO (2)
-
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
i
i
.
I
!
-
-.
4
SEP 2 71993
-
.
GPU huclear Corporation
3
4
bec w/ encl:
i
Region I Docket Room (with concurrences)
J. Lanning, TI 2500/028
R. Rosano, OE, TI 2500/028
bec w/ encl (VIA E-MAIL):
V. McCree, OEDO
_
1
J
l
I
i
IQ
RI:bRP
k
RI:DRP
RI:DRP
\\
Evans
N Rogge
Blough
9/p/93
2 /t>/93
[K)/93
OFFICIAL RECORD COPY
G:\\ BRANCH 4\\TM19319. INS