September 29, 1993 Docket No. 50-271 Mr. Donald A. Reid, Vice President Operations Vermont Yankee Nuclear Power Corporation Ferry Road Brattleboro, Vermont 05301 l
l-
SUBJECT:
INSPECTIONS OF REACTOR VESSEL HEAD CLADDING AT THE VERMONT YANKEE NUCLEAR POWER STATION (TAC NO. M87040)
By letter dated July 1,1993, Vermont Yankee Nuclear Power Corporation (VYNPC) submitted its reactor vessel head cladding inspection plan for the 1993 refueling outage in accordance with a commitment made to the NRC and documented in a letter from the NRC to VYNPC dated April 17, 1992. The NRC staff has reviewed the inspection plan and concludes that it is acceptable provided the ultrasonic techniques are at least as sensitive as those used in the original inspection conducted in 1992, the acceptance criteria is contained in IWB-3520.2 of Section XI of the 1989 Edition of the American Society of Mechanical Engineers Code, and the findings are submitted in a report to the NRC including a discussion on future activities beyond the 1993 refueling outage.
If you have any question on this matter, please contact me at (301) 504-1429.
or gina ' signed by Daniel H. Dorman, Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
Slittle
~ Docket File DDorman NRC & Local PDRs OGC PDI-3 Reading ACRS (10)
SVarga JLinville, RI JCalv
,3Sirc6nicld WButler OFFICE PDIE3LA PDI-3:PM W PDI-3:D1 1 3
NAME~ ~
SbtYe DDorman:dt WButler W DATEi 9/$/93 9 /21/93 Q 2 /93 6
0FFICIAL RECORD COPY.
DpCUMENTNAME: A:\\VYLETIER 9310070155 930929 PDR ADOCK 05000271
/
O PDR
(
in mico k^
ej UNITED STATES y
E E
NUCLEAR REGULATORY COMMISSION E*
f-WASHINGTON, D.C. 205664X)01
/
September 29, 1993 Docket No. 50-271 Mr. Donald A. Reid, Vice President Operations Vermont Yankee Nuclear Power Corporation Ferry Road Brattleboro, Vermont 05301
SUBJECT:
INSPECTIONS OF REACTOR VESSEL HEAD CLADDING AT THE VERMONT YANKEE NUCLEAR POWER STATION (TAC NO. M87040)
By letter dated July 1, 1993, Vermont Yankee Nuclear Power Corporation (VYNPC) submitted its reactor vessel head cladding inspection plan for the 1993 refueling outage in accordance with a commitment made to the NRC and-1 documented in a letter from the NRC to VYNPC dated April 17, 1992. The NRC-staff has reviewed the inspection plan and concludes that it is acceptable provided the ultrasonic techniques are at least as sensitive as those used in the original inspection conducted in 1992, the acceptance criteria is contained in IWB-3520.2 of Section XI of the 1989 Edition of the American Society of Mechanical Engineers Code, and the findings are submitted in a report to the NRC including a discussion on future activities beyond the 1993 refueling outage.
If you have any question on this matter, please contact me at (301) 504-1429.
Sincerely, Daniel H. Dorman, Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office Nuclear Reactor Regulation cc: See next page f
i
e 4
/
Mr. Donald A. Reid, Vice President Vermont Yankee Nuclear Power Station Operations CC:
Mr. Jay Thayer, Vice President G. Dana Bisbee, Esq.
Yankee Atomic Electric Company Office of the Attorney General 580 Main Street Environmental Protection Bureau Bolton, Massachusetts 01740-1398 State House Annex 25 Capitol Street Regional Administrator, Region I Concord, New Hampshire 03301-6937 U. S. Nuclear Regulatory Commission 475 Allendale Road Resident Inspector King of Prussia, Pennsylvania 19406 Vermont Yankee Nuclear Power Station U.S. Nuclear Regulatory Commission R. K. Gad, III P. O. Box 176 Ropes & Gray Vernon, Vermont 05354 One International Place Boston, Massachusetts 02110-2624 Chief, Safety Unit Office of the Attorney General Mr. Richard P. Sedano, Commissioner One Ashburton Place, 19th Floor Vermont Department of Public Service Boston, Massachusetts 02108 120 State Street, 3rd Floor Montpelier, Vermont 05602 Mr. David Rodham, Director Massachusetts Civil Defense Agency Public Service Board 400 Worcester Rd.
State of Vermont P.O. Box 1496 120 State Street Framingham, Massachusetts 01701-0317 Hontpelier, Vermont 05602 ATTN: James Muckerheide Chairman, Board of Selectmen Mr. Raymond N. McCandless Town of Vernon Vermont Division of Occupational Post Office Box 116 and Radiological Health Vernon, Vermont 05354-0116 Administration Building Montpelier, Vermont 05602 Mr. J. P. Pelletier, Vica President Vermont Yankee Nuclear Power Mr. L. A. Tremblay Corporation Senior Licensing Engineer Ferry Road Vermont Yankee Nuclear Power Brattleboro, Vermont 05301 Corporation 580 Main Street Bolton, Massachusetts 01740-1398 Mr. Robert J. Wanczyk, Plant Manager Vermont Yankee Nuclear Power Station P.O. Box 157, Governor Hunt Road Vernon, VT 05354 1