Advises of Cavaet to Response to NRC Bulletin 88-02, Rapidly Propagating Cracks in Steam Generator Tubes
ML20057D150
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/28/1993
From: Stolz J
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO.
References
IEB-88-002, IEB-88-2, TAC-M67309, NUDOCS 9310010185
Download: ML20057D150 (3)


Text

e

~

Septenber 28, 1993 Docket No. 50-213 Mr. John F. Opeka Executive Vice President, Nuclear Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

RESPONSE TO NRC BULLETIN NO. 88-02, " RAPIDLY PROPAGATING CRACKS IN STEAM GENERATOR TUBES" FOR HADDAM NECK PLANT (TAC N0. M67309)

By letter dated June 2,1993, the staff issued the safety evaluation for the above subject for the Haddam Neck Plant. The staff in that letter concluded that your actions to resolve this issue were acceptable.

However, this conclusion should have been caveated with the following:

Administrative controls should be developed by the licensee to ensure that updated stress ratio and fatigue usage calculations are performed in the event of any significant changes to the steam generator operating parameters (e.g., steam pressure and flow, circulation ratio) relative to those assumed in the JAYCOR analysis.

If, for any reason, you do not plan to implement such administrative controls, please contact us within 30 days of receipt of this letter.

Implementation of the additional administrative controls may be subject to verification by an NRC inspection.

If you have any comments or questions regarding the above contact Alan Wang at (301)504-1445.

Sincerely, Original signed by Alexander W. Dromerick for: John F. Stolz, Director 9310010185 930928 Project Directorate I-4 PDR ADOCK 0500 3

Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc w/ enclosure:

See ne.:t page DISTRIBUTION:

Docket File NRC & Local PDRs PDI-4 R/F SVarga JCalvo SNorris AWang 2900,r0~

OGC ACRS (10)

LDoerflein, RGI JNorberg JRajan JStronider GJohnson EMurphy e m et LA:PDI-4 PM:PDI-4 D:PDI-4, NAME S EW AWang:bphLd JdN[

']/l/93 G/N/93 4/7p/93

/ /

/ /r1 DATE i

CM ANG\\8802FU hh b t IJ g0

/

  1. 6 UNITED STATES

[

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20656-0001

\\

/

September 28, 1993 Docket No. 50-213 l

l Mr. John F. Opeka Executive Vice President, Nuclear Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

RESPONSE TO NRC BULLETIN N0. 88-02, " RAPIDLY PROPAGATING CRACKS IN -

STEAM GENERATOR TUBES" FOR HADDAM NECK PLANT (TAC NO. M67309)

By letter dated June 2,1993, the staff issued the safety evaluation for the; above subject for the Haddam Neck Plant. The staff in that letter concluded.

that your actions to resolve this issue were acceptable. However, this letter should have included the following caveat Administrative controls should be developed by the licensee to ensure that updated stress ratio and fatigue usage calculations

~

are performed in the event of any significant changes to the steam generator operating parameters (e.g., steam pressure and flow, circulation ratio) relative to those assumed in the JAYCOR i

analysis.

If, for any reason, you do not plan to implement such administrative controls, please contact us within 30 days of receipt of this letter.

i Implementation of the additional administrative controls may be subject to verification by an NRC inspection.

If you have any comments or questions regarding the above contact Alan Wang at (301)504-1445.

Sincerely, hb WhMD l

John. Stolz, Director Project Directorate I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc w/ enclosure:

See next page i

e s

o Mr. John F. Opeka Haddam Neck Plant CC:

Gerald Garfield, Esquire R. M. Kacich, Director Day, Berry and Howard Nuclear Licensing Counselors at Law Northeast Utilities Service Company City Place Post Offir,e Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President S. E. Scace, Vice President Nuclear Operations Services Millstone Nuclear Power Station Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 128 Hartford, Connecticut 06141-0270 Waterford, Connecticut 06385 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Environmental Protection U.S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania.19406 Allan Johanson, Assistant Director Board of Selectmen Office of Policy and Management Town Office Building Policy Development and Planning Division Haddam, Connecticut 06438 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Plant J. P. Stetz, Vice President c/o U.S. Nuclear Regulatory Commission Haddam Neck Plant 361 Injun Hollow Road Connecticut Yankee Atomic Power Company East Hampton, Connecticut 06424-3099 362 Injun Hollow Road East Hampton, Connecticut 06424-3099 Nicholas S. Reynolds Winston & Strawn D. J. Ray 1400 L Street, NW Haddam Neck Unit Director Washington, DC 20005-3502 Connecticut Yankee Atomic Power Company 362 Injun Hollow Road East Hampton, Connecticut 06424-3099 G. H. Bouchard, Director Nuclear Quality Services Nortteast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270