Forwards Final Completion Review Rept for Remedial Action at Lakeview,Or U Mill Tailings Site. Concurs That W/ Exception of ground-water Restoration,Doe Completed Remedial Action in Accordance W/Approved Plans & Specs
ML20057D026
Person / Time
Issue date: 09/01/1993
From: Randy Hall
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Chernoff A
ENERGY, DEPT. OF
Shared Package
ML20057D027 List:
References
REF-WM-64 NUDOCS 9310010008
Download: ML20057D026 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _

C s\\

i.

pmMco UNITED STATES y"

NUCLEAR REGULATORY COMMISSloN e

REGION IV

,e URANIUM RECOVERY FIELD OFFICE e,,,,

BOX 25325 DENVER, COLORADO 30225 SEP 01 1993 Docket No. WM-64 U.S. Department of Energy Albuquerque Operations Office ATTN: Albert R. Chernoff Project Manager P.O. Box 5400 Albuquerque, New Mexico 87115

Dear Mr. Chernoff:

We have completed our review of the certification data for the uranium mill tailings site at Lakeview, Oregon. The data reviewed were the Final Completion Report, the Final Audit Report, and all other associated documentation pertinent to the completed remedial action at Lakeview. The results of our review are documented in the enclosed Final Completion Review Report.

Based on our review of the certification data and on observations and record checks made during periodic site visits, we concur that, with the exception of ground-water restoration, the Dtpartment of Energy (DOE) has completed the remedial action in accordance with the approved plans and specifications, and that this action complies with the Environmental Protection Agency's standards in 40 CFR 192, Subparts A-C.

I have tnerefore signed the enclosed signature pages signifying NRC's concurrence in the completion of remedial action at Lakeview, Oregon.

Ground-water cleanup at the processing site will be addressed by DOE as part of a separate ground-water restoration program once the proposed EPA grourid-water standards have been finalized. This will require that DOE maintain control of the processing site in a manner consistent with DOE's April 9,1993, policy letter.

If you have any questions, please contact the NRC Lakeview project manager, Ray Gonzales, at FTS (303) 231-5808.

Sincerely, l

30-145 hanf amon E. Hall Director

Enclosures:

i As stated p

)

931001000s 93o901 a

PDR WASTE

?

WFf-64 PDR y

j

/

O

, a U.S. Department of Energy SEP 01 1933 cc:

S. Hamp, DOE F. Hiera, Oregon D. Stewart-Smith, Oregon 4

4 o

l U.S. Department of Energy,SEP 01 1993.

}'

Case Closed: X60593 bcc:

Docket No WM-64

['PDR/DCSlj/

URF0~r/f LJCallan, RIV LLUR Branch, LLWM, SE2 R0Gonzales DLJacoby 0:\\ROG\\WM-64.LTR

.i

\\

l l

1 bl r PM:URFQh PM:URF0ch' DD:URF0 h D:URF0:RIVM ROGonzks/lv DLJacoby EFHawkins REHall h U

08/26/93 08//7/93 Ok/I/93 Oh/ ( /9Y

N

~

U.S. DEPARDENT OF DJERGY Cun w 1 CATION

SUMMARY

for the Lakeview, Oregon, Disposal Site The Uranium Mill Tailirgs Pomodial Irtion Project Panager and the Contractirq Officer for the U.S. Departrent of Energy certify tlat the Iakeview, Oregon, renedial action is complete. The processing ard disposal sites have been remediated ard rect all design criteria and technical specifications contained in the approved Ponodial Action Plan, as required under Public Law 95-604. This certification applies only to the earth surface remediation. The grountsater restoration activities at the lakeview raill site will be completed separately. ihe undersigned request that the U.S. Nuclear Regulatory Cammission concur in this certification.

d2 Af4'W --

W/

Melanie J. Thomas Albert R. Cherno f Contracting Officer Project Parager Programs ard R&D Branch Uranium Mill Tailings Remedial Cbntracts and Procurement Division Action Project Office DATE:

8 44

/ / 9 942-DATE:

/i bV V

The Director, Uranium Recovery Field Office, Region IV, U.S. Nuclear Regulatory rwmmi mion hereby concurs with the U.S. Department of Energy's completion of surface remedial action at the Lakeview, Orcgon processirg and disposal site.

r. Ramon E. Ha 1, Uranium Recovery Field Office i

RaJ on IV, DRSS U.S. Nuclear Regulatory nrrimi mion Swbahir / MM ime:

fI

/

4 4

N U.S. DEPARIMD7T OF DIERGY cuumCATIOti

SUMMARY

for the lakeview, Oregon, Disposal Site me Uranium Mill Tailings Remedial Action Project Manager and the Contracting Officer for the U.S. DepartIcnt of Energy certify that the lakeview, Oregon, renadial action is complete. he processirg and dispccal sites have been renediated ard reet all design criteria ard technical specifications contained in the approved Renedial Action Plan, as required under Public law 95-604.

'2ds certification applies only to the earth surface renadiation. me grourdwater restoration activities at the Lakeview mill site will be conpleted separately. Se urdersigned request that the U.S. Nuclear Regulatory Commission concur in this certification.

W WW Melanie J. Scras Albert R. Chernoff Contractirg Officer Project Manager Programs and R&D Branch Uranium Mill Tailings Renedial Contracts and Procurement Division Action Project Office DATE:

84A

/ / f 7c=2 DATE:

(

f

/

W e Director, Uranium Recovery Field Offi, Region IV, U.S. Nuclear Regulatory Commission hereby concurs with the U.S. Deht of Energy's t

cxrpletion of surface renedial action at the Iakeview, Oregon processirg and disposal site.

M~

v

r. Ranon E. Hall, Director Uranium Recovery Field Office Region IV, DRSS U.S. Nuclear Regulatory ch,mienion h b