ML20057C979

From kanterella
Jump to navigation Jump to search
Forwards Scenario Package for Evaluated Exercise Scheduled for 931207.W/o Encl
ML20057C979
Person / Time
Site: Pilgrim
Issue date: 09/22/1993
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-93-124, NUDOCS 9309300202
Download: ML20057C979 (2)


Text

1 i

y

-s BOSTON EDISON Pngom Nuclear Power Staten 10 CFR 50, App. E Section IV F.2, F.3 P
ymouth PiaSSB ho e*ts 02360 E. T. Boulette. PhD Senior Vice President - Nuclear f

September 22, 1993 BECo Ltr.93-124 i

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 License No. DPR-35

Subject:

1993 NRC/ FEMA Evaluated Exercise Scenario Submittal l

Enclosed is Boston Edison's scenario package for the Pilgrim Nuclear Power Station (PNPS) NRC/ FEMA Evaluated Exercise scheduled for December 7,1993.

In addition to the normal scenario submittal you will also find a copy of the information generated i

by Boston Edison in support of the Ingestion portion of the Exercise.

f Two copies of the scenario package for this exercise are attached for your review.

The enclosures adhere to FEMA's Guidance, Radiological Emergency Preparedness exercise manual (REP-14), dated September 1991, which states that the exercise scenario be submitted at least 60 days in advance of the exercise.

The scenario package includes:

}

Scope and Objectives Schedules Contingency & Simulation Information

+

Controller and Player Information Exercise Rules Radiation Levels & Release Rates Data / Messages (Plant, Radiochemistry, Radiological)

If you have questions or require additional information, please do not hesitate to contact the Emergency Preparedness Onsite Division at (508) 747-9455.

dbuLYk E. T. Boulette, PhD RAG / JAM /bal/cs Enclosures 30 104 i ()

i 9309300202 930922-IN PDR ADOCK 05000293 f3 F

pyg g;

p,,

q l

p,'

e l

Page'2 -

l U.S. Nuclear Regulatory Commission September 22, 1993 h

l With Enclosures (2) cc:

Mr. E.B. McCabe, Chief Emergency Preparedness Section, Region I U.S. Nuclear Regulatory Commission 475 Allendale Rd.

King of Prussia, PA 19406 Sr. NRC Resident Inspector - Pilgrim Station

- Without Enclosure.

Mr. R. B. Eaton, Project Manager Div. of Reactor Projects I/II.

Office of NRR - USNRC Mail Stop:

14D1 One White Flint North 11555 Rockville Pike Rockville, MD 02852 Mr. David Chawaga Emergency Response Coordinator U. S. Nuclear Regulatory Commission l

Region I 475 Allendale Road King of Prussia, PA 19406 i

1 1

I j

J

'I l

l

)

o

,