ML20057C671

From kanterella
Jump to navigation Jump to search
Notifies NRC That Util Completed ISI of All Three SGs by 930914 & That Addl Info Re Insp of SGs Will Be Included in ISI Summary Rept Scheduled to Be Completed by Jan 1994
ML20057C671
Person / Time
Site: Maine Yankee
Issue date: 09/22/1993
From: Hebert J
Maine Yankee
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JRH-93-193, MN-93-87, NUDOCS 9309290248
Download: ML20057C671 (1)


Text

MaineYankee m um - =

ED: SON DRfVE

  • AUGUSTA MAINE 04330 *.207) 622-4868 i

l September 22, 1993 MN-93-87 JRH-93-193 UNITED STATES NUCLEAR REGULATORY COMMISSION Attention:

Document Control Desk Washington, DC 20555

Reference:

(a)

License No. DPR-36 (Docket No. 50-309) l

Subject:

Steam Generator Tube Surveillance Gentlemen:

Maine Yankee's Technical Specification 4.10.E.1 requires that, following each inservice inspection of steam generator tubes, the number of tubes plugged in each steam generator shall be reported to the Commission within 15 days.

Maine Yankee completed an inservice inspection of all three steam generators.

As a result of this inspection, we plugged 17 tubes in steam generator E-1-1, 4 tubes in steam generator E-1-2, and 34 tubes in steam generator E-1-3.

All plugging was completed by September 14, 1993.

Additional information related to the inspection of the steam generators will be included in our Inservice Inspection Summary Report which is scheduled to be submitted about January, 1994.

Please contact us if you have any questions.

Very truly yours, kN James R. Hebert, Manager Licensing & Engineering Support Department WBD/ jag c:

Mr. Thomas T. Martin Mr. J. T. Yerokun Mr. E. H. Trottier Mr. Patrick J. Dostie i

gRO9290248 930922 P

'O ADOCK 05000309 L g

PDR Q

t\\y m.,_1 m

..t

'