Sou nem touclear Operatng Company Post Offce Box 1295
, B:rmingham, Alabama 35201 Teiephone (205) 808-5131 m
Southern Nuclear Operating Company o.ve uo,,y
$efr*rfe"c?
the southern electnc system SEPTDEER 22, 1993 Docket No. 50-364 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Joseph M. Farley Nuclear Plant - Unit 2 Technical Specification Changes Associated with Steam Generator Tube Support Plate Interim Pluacino Criteria Gentlemen:
By letter dated July 29, 1993, Southern Nuclear submitted a proposed interim plugging criteria for use at Unit 2 of the Farley Nuclear Plant.
Recent discussions with the NRC Staff have indicated a need to revise Page 3/4 4-26 of the proposed revised technical specification.
As a result, a revised Page 3/4 4-26 is provided in Attachment 1.
The modification to Page 3/4 4-26 does not change the conclusions reached in the Significant Hazards Consideration Analysis submitted on July 29, 1993.
If there are any questions, please advise.
Respectfully submitted,
(?l })l&- f l
Dave Morey
/
SWORN TO AND SUBSCRIBED BEFORE ME THIS c2 # DAY
/
Attachment
./ ~
ry Public~ & -
. dr.
k cc:
Mr. S.D. Ebneter M Commission Expires: 'f-/9-- F<f/
Mr. T.A. Reed
~
Mr. M.J. Morgan Dr. D.E. Williamson 97 197 g
930929018o 930922 I