Text

-- -

(

a nz o

UNITED STATES 8'

NUCLEAR REGULATORY COMMISSION

'h WASHINGTON,0. C. 20555 a

September 23, 1993 I

Docket No.52-003 I

i Mr. Nicholas J. Liparulo Nuclear Safety and Regulatory Activities i

I Westinghouse Electric Corporation

{

P.O. Box 355 Pittsburgh, Pennsylvania 15230

Dear Mr. Liparulo:

\\

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) ON THE AP600 As a result of its review of the June 1992 application for design certifica-tion of the AP600, the staff has determined that it needs additional informa-1 I

tion in order to complete its review. The additional infomation is needed in i

the area of safeguards (Q920.1 - Q920.2),* Enclosed are the staff's ques-tions.

Please respond to this request within 90 days of the date of receipt of this letter.

j You have requested that portions of the information submitted in the June 1992 application for design certification be exempt from mandatory public disclo-sure. While the staff has not completed its review of your request in accordance with the requirements of 10 CFR 2.790, that portion of the submit-ted information is being withheld from public disclosure pending the staff's final determination. The staff concludes that this request for additional information does not contain those portions of the information for which exemption is sought. However, the staff will withhold this letter from public disclosure for 30 calendar days from the date of this letter to allow Westing-house the opportunity to verify the staff's conclusions.

If, after that time, you do not request that all or portions of the information in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.790, this letter will be placed in the Nuclear Regulatory Commission's Public Document Room.

  • The numbers in parentheses designate the tracking numbers assigned to the questions.

MC RLE CEPHER Cpy

],, C I

v 9309280406 930923 f

PDR ADOCK 05200003 PDR A

\\,

L.

Mr. Nicholas J. Liparulo September 23, 1993 This RAI affects nine or fewer respondents, and therefore, is not subject to review by the Office of Management and Budget under P.L.96-511.

If you have any questions regarding this matter, you can contact me at (301) 504-1120.

Sincerely, Odghar b a4 a Thomas J. Kenyon, Project Manager Standardization Project Directorate Associate Director for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION:

  • Central File PDST R/F TMurley/FMiraglia DCrutchfield
  • PDR WTravers RBorchardt TKenyon RHasselberg T60dy, Jr., EDO JMoore, 15B18 MSiemien, 15B18 FYoung, 9D24 RDube, 9D24 PShea ACRS (11) w/o encl.

OFC:

LA:PDST:ADAR PM:PdSNADAR D:PD :ADAR NAME:

PShea mr, 8 TKen[on:sg RBohardt 09/24d3 09/; "'/93 09/b/93 DATE:

0FFICIAL RECORD COPY:

DOCUMENT NAME: PSGB.RAI

\\s l

1 Mr. Nicholas J. Liparulo Westinghouse Electric Corporation Docket No.52-003 AP600 cc:

Mr. B. A. McIntyre l

Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit P.O. Box 355 Pittsburgh, Pennsylvania 15230 1

Mr. John C. Butler Advanced Plant Safety & Licensing

)

Westinghouse Electric Corporation Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania 15230 Mr. M. D. Beaumont Nuclear and Advanced Technology Division Westinghouse Electric Corporation One Montrose Metro 11921 Rockville Pike Suite 350 Rockville, Maryland 20852 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.

20585 Mr. S. M. Modro EG&G Idaho Inc.

Post Office Box 1625 Idaho Falls, Idaho 83415 Mr. Steve Goldberg 4

Budget Examiner 725 17th Street, N.W.

Room 8002 Washington, D.C.

20503 Mr. Frank A. Ross U.S. Department of Energy, NE-42 Office of LWR Safety and Technology 19901 Germantown Road Germantown, Maryland 20874 s

REQUEST FOR ADDITIONAL INFORMATION ON THE WESTINGHOUSE AP600 DESIGN 920.1 Sectio.

2.2.1 of Chapter 9 of the EPRI Advanced Light Water Reactor (ALWR) utility Requirements Document (URD) for passive plant designs states that a vulnerability analysis should be performed prior to finalizing the design to analyze issues associated with insider and outsider sabotage.

In Section 5.2.2 of the EPRI final Safety Evalua-tion Report, dated August 31, 1993, the staff stated that a vulnerabil-ity analysis would be reviewed as part of an individual application.

Westinghouse has stated that it will comply with the EPRI ALWR URD.

Provide that analysis.

920.2 Section 13.6.5.2 of the AP600 SSAR states that a listing of vital equipment is provided in the AP600 Security Design Report.

The Security Design Report, dated June 30, 1992, did not contain a list of vital equipment.

Provide a listing of vital equipment for the AP600 design.

Enclosure