GENucle:r Energy.

l 5

i GeneralDectnc Cornpany 175 Curtner Avenue. San Jose. CA 95125 -

r i

.{

September 15,1993 Docku No. STN 52-001 f

I l

}

i i

i Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal l

Office of the Nuclear Reactor Regulation l

Subject:

Submittal Supporting Accelerated ABWR Schedule - Bechtel QA l

Dear Chet:

Attached are two letters from Bechtel documenting the application of its QA Project i

Procedures Manual to the ABWR Certification Program (DOE Advanced Reactor Program).

Please provide a copy of this transmittal to David Tang.

j i

Sincerely, j

Y Jack Fox t

Advanced Reactor Programs i

ec:

Alan Beard (GE)

Norman Fletcher (DOE)

.l JWA2$8 0O 4nn y

9309280277 930915 gp.

t A.

,PDR. O-

}4-c PDR ADOCK.05200001-T;d j.-

4

SEP,01 '93 02: 1SPM BECHTEL SBLR PROJECT P.2/2 i

e j

Bechtel S0 Beale Street San Francaca CA 941051895 Mailing accress: RQ Box 19396S San Francisco CA 94119-3965 August 31, 1993 BLG-09/,

Mr. J.F. Quirk M/C 441 General Electric Nuclear Energy 175 Curtner Avenue San Jose, CA 95125

Subject:

DOE Advanced Reactor Program (ABWR).

GE Purchase Order 190-ALWR-31307 Bechtel Job No. 18775-014 Civil / Structural ABWR:

ABWR Licensing Support calculations

References:

(1)

Bechtel Letter to GE BLG-0095 dated August 17, 1993

Dear Mr. Quirk:

This is to document that the Civil / Structural calculations for the Licensing Support of the ABWR project have been performed in accordance with the Bechtel QA Project Procedures Manual.

An internal' QA/ technical audit has been performed to verify compliance with project procedural and QA requirements.

The calculations are available for inspection at the ABWR project office in Bechtel.

Please call us if there are any questions.

Very truly yours, b

. Posta B. A Project Engineer cc:

G. Ehlert.,

A.

S.

Liu BechtelPowerCorporation n d2>

x:\\Asut\\ Linnets.097 pr,

SEF-10 '93 12:05PM BECHTEL SBWR PROJECT P.2/2 o

Bechtel 50 Beale Street San Francisco, CA 94105-1895 Mailing accress' PO Box 193965 San Francisco, CA 94119 3965 September 10, 1993 BLG-O/00 Mr.

J.F. Quirk M/C 441 General Electric Nuclear Energy 175 Curtner Avenue San Jose, CA 95125

Subject:

DOE Advanced Reactor Program (ABWR)

GE Purchase Order 190-ALWR-31387 Bechtel Job No. 18775-014 Quality Assurance Program Plan

Reference:

P. Novak telephone request of 09/10/93.

Dear Mr. Quirk:

This letter is in response to the reference conversation and, as requested, confirms the following points:-

i.

The Bechtel work supporting safety related items in the ABWR Standard Safety Analysis Report (SSAR) are in compliance with the project Nuclear Quality Assurance Plan and Bechtel Nuclear Quality Assurance Manual,in compliance with 10CFR50 Appendix B requirements.

ii.

Engineering is controlled through the use of Standard EDPs (Engineering Department Procedures) which -implement 10CFR50 Apr_adix B requirements.

iii. The calculations supporting the SSAR have been checked and audits conducted to verify their technical content and conformance to applicable angineering procedures and QA requirements.

Early preliminary studies have been reworked for the SSAR submittals.

Should you need further information or clarification on the above matters, please do not hesitate to call.

very truly yours, B.A % F E.A. Goldenberg cc:

P. Novak Project Manager EAG/MPL/BAP x:\\KB TRS\\BLG.100 i

i BechtelPower Corporation od4