ML20057C220

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-277/93-17 & 50-278/93-17 on 930803-0913.No Violations Noted
ML20057C220
Person / Time
Site: Peach Bottom  
Issue date: 09/22/1993
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20057C221 List:
References
NUDOCS 9309280090
Download: ML20057C220 (3)


See also: IR 05000277/1993017

Text

k

.:

} ,,c .

. ~,

,

.

'

6

SEP 2 21993

Docket / License No. 50-277/DPR-44

-50-278/DPR-56

P

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company

Correspondence Control Desk

P. O. Box 195

Wayne, PA '19087-0195

Dear Mr. Smith:

SUBJECT:

COMBINED INSPECTION 50-277/93-17 AND 50-278/93-17

[

i

This letter transmits the findings of the resident safety inspection conducted by Messrs. W. L.

Schmidt, B. S. Norris, F. P. Bonnett, and R. K. lorson from August 3 through September 13,

1993, at the Peach Bottom Atomic Power Station, Delta, Pennsylvania. The inspectors based

these findings on observation of activities, interviews, and document reviews. These findings

were discussed with Mr. G. Edwards of your staff.

The inspectors observed that your conduct of activities in support of the Unit 2 outage to install

I

the reactor water level backfill modification were well managed and were handled

j

professionally. However, the inspectors noted that weaknesses in isolation of the reactor vessel

'

water level instrumentation during installation of the modification resulted in the generation of

i

a false low level signal. This low level signal caused ECCS initiation signals and entry into a

,

technical specification required shutdown condition at Unit 3.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

<

its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork Reduction

i

Act of 1980, Pub. L. No. 96.511.

We appreciate your cooperation.

Sincerely,

ORIGINAL SIGNED BY:

!

E. Wenzinger, Chief

i

Projects Branch 2

'

Division of Reactor Projects

Enclosure: NRC Region I Combined Inspection Report 50-277/93-17 and 50-278/93-17

I

9309280090 930922

h

I

PDR

ADOCK 05000277

-

3

PDR

G

-

,

_

_ _ _ ,

.

-

,.

'

.

.

Philadelphia Electric Company

2

'

cc w/ encl:

J. Doering, Chairman, Nuclear Review Board

D. B. Miller, Vice President, Peach Bottom Atomic Power Station

G. Rainey, Vice President, Nuclear Services Department

G. Cranston, General Manager, Nuclear Engineering Division

C. Schaefer, External Operations-Nuclear, Delmarva Power & Light Co.

G. Edwards, Plant Manager, Peach Bottom Atomic Power Station

A. J. Wasong, Manager Experience Assessment, Peach Bottom Atomic Power Station

G. A. Hunger, Jr., Manager, Licensing Section

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Director, Generation Projects Department, Atlantic Electric

B. Gorman, Manager, External Affairs

,

R. Mclean, Power Plant Siting, Nuclear Evaluations

D. Poulson, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Pennsylvania

f

TMI - Alert (TMIA)

i

l

l

M,

---

-

..

  • .

!

!

. .,

.

Philadelphia Electric Company

3

,

'

bec w/ encl:

Region I Docket Room (with concurrences)

i

bec w/ encl: (Via E-Mail)

V. McCree, OEDO

,

R. Clark, Project Manager, NRR

M. Boyle, Acting PDI-2, NRR

i

.,

4

i

.

CONCURRENCES:

clc fv t

cG

-

D^a

RI:

DRP

DR>

'

Schmidt

Anderson

T enzinger

9/7f/93

9/ /93

9/yy93

j

OFFICIAL RECORD COPY

!

o

a:pbir9317.wp

l

1

-

-

,

,