Text
c ~m
, O
N.D
'
V
a
SEP 2 2 1993
Docket Nos. 50-317
50-318
Mr. Robert E. Denton
Vice President - Nuclear Energy
Baltimore Gas and Electric Company
Calvert Cliffs Nuclear Power Plant
1650 Calvert Cliffs Parkway
Lusby, Maryland 2 % 57 - 4702
Dear Mr. Denton:
SUBJECT:
NRC Combined Inspection Nos. 50-317/93-27; 50-318/93-27
An announced safety inspection of the radiation protection program at your facility was
conducted by Mr. J. Furia of this office on September 7-10,1993. The inspection findings were
discussed with members of your staff at the conclusion of the inspection on September 10,1993.
Areas examined during this inspection are important to health and safety and included the
radiation protection program. Areas inspected include your programs for: radiation safety
,
during normal operations, radiological work control and housekeeping, maintaining radiation
exposures as low as reasonably achievable (ALARA), and assurance of quality. Within these
areas, the inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
ALARA performance during the Spring Unit-2 refueling outage (RF09) was erratic, with several
major work activities going well over budgeted dose. Continued weaknesses identified in
previous inspections in planning for the outage, coupled with an apparent lack of strong support
to ALARA goals by some plant staff played a significant part in the weakness in ALARA outage
performance.
It appears that progress is being made to correct some of these weaknesses. Improvements
include the creation of an ALARA Committee and placement of an ALARA technician in the
Outage Management Team, however improvements in ALARA interfacing with other groups and
more timely submittal of work packages is needed.
270020
omCIA1. RECORD COPY
l
i
, r,
- e_
[ M3
i$
2gggg gj@0 g7
N
d 4
,
.
4
s
Baltimore Gas and
2
'E 2 2 8
Electric Company
No response to this letter is required. Your cooperation with us in this matter is appreciate <l.
>
Sincerely,
-
%1nal Signed By;
.!ames H. Joyner
James H. Joyner, Chief
Facilities Radiological Safety
and Safeguards Branch
,
Division of Radiation Safety
and Safeguards
Enclosure: NRC Region I Combined Inspection Report Nos. 50-317/93-27; 50-318/93-27
l
cc w/ encl:
G. Detter, Director, Nuclear Regulatory Matters (CCNPP)
R. McLean, Administrator, Nuclear Evaluations
J. Walter, Engineering Division, Public Service Commission 'of Maryland
K. Burger, Esquire, Maryland People's Counsel
R. Ochs, Maryland Safe Energy Coalition
K. Abraham, PAO (2)
Public Document Room (PDR)
t
Local Public Document Room (LPDR)
,
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
.
!
,
,
,
k
OFFICIAL RECORD COPY
.
1
.
<
a.
Baltimore Gas and
3
SEP 2 2 gp3
Electric Company
bec w/ encl:
Region I Docket Room (with concurrences)
t
C. Cowgill, DRP
L. Nicholson, DRP
D. Weaver, DRP
P. Wilson - Calvert Cliffs
V. McCree, OEDO
'
R. Capra, NRR
D. Mcdonald, NRR
1
,
i
!
RI:DRSS
RI:D
S
(3,T
[
\\
JFuria
WPyciak
J oyner
7/d/93
9/IT93
9/1//93
i
.
I
t
t
9
1
i
E
I
f
i
i
4
f
OFFICIAL RECORD COPY
!'
,
i