Forwards Insp Repts 50-317/93-27 & 50-318/93-27 on 930907-10.No Violations Noted
ML20057C177
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/22/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Denton R
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20057C178 List:
References
NUDOCS 9309280041
Download: ML20057C177 (3)


See also: IR 05000317/1993027

Text

c ~m

, O

N.D

'

V

a

SEP 2 2 1993

Docket Nos. 50-317

50-318

Mr. Robert E. Denton

Vice President - Nuclear Energy

Baltimore Gas and Electric Company

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, Maryland 2 % 57 - 4702

Dear Mr. Denton:

SUBJECT:

NRC Combined Inspection Nos. 50-317/93-27; 50-318/93-27

An announced safety inspection of the radiation protection program at your facility was

conducted by Mr. J. Furia of this office on September 7-10,1993. The inspection findings were

discussed with members of your staff at the conclusion of the inspection on September 10,1993.

Areas examined during this inspection are important to health and safety and included the

radiation protection program. Areas inspected include your programs for: radiation safety

,

during normal operations, radiological work control and housekeeping, maintaining radiation

exposures as low as reasonably achievable (ALARA), and assurance of quality. Within these

areas, the inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

ALARA performance during the Spring Unit-2 refueling outage (RF09) was erratic, with several

major work activities going well over budgeted dose. Continued weaknesses identified in

previous inspections in planning for the outage, coupled with an apparent lack of strong support

to ALARA goals by some plant staff played a significant part in the weakness in ALARA outage

performance.

It appears that progress is being made to correct some of these weaknesses. Improvements

include the creation of an ALARA Committee and placement of an ALARA technician in the

Outage Management Team, however improvements in ALARA interfacing with other groups and

more timely submittal of work packages is needed.

270020

omCIA1. RECORD COPY

l

i

, r,

- e_

[ M3

i$

2gggg gj@0 g7

N

d 4

,

.

4

s

Baltimore Gas and

2

'E 2 2 8

Electric Company

No response to this letter is required. Your cooperation with us in this matter is appreciate <l.

>

Sincerely,

-

%1nal Signed By;

.!ames H. Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

,

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Combined Inspection Report Nos. 50-317/93-27; 50-318/93-27

l

cc w/ encl:

G. Detter, Director, Nuclear Regulatory Matters (CCNPP)

R. McLean, Administrator, Nuclear Evaluations

J. Walter, Engineering Division, Public Service Commission 'of Maryland

K. Burger, Esquire, Maryland People's Counsel

R. Ochs, Maryland Safe Energy Coalition

K. Abraham, PAO (2)

Public Document Room (PDR)

t

Local Public Document Room (LPDR)

,

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

.

!

,

,

,

k

OFFICIAL RECORD COPY

.

1

.

<

a.

Baltimore Gas and

3

SEP 2 2 gp3

Electric Company

bec w/ encl:

Region I Docket Room (with concurrences)

t

C. Cowgill, DRP

L. Nicholson, DRP

D. Weaver, DRP

P. Wilson - Calvert Cliffs

V. McCree, OEDO

'

R. Capra, NRR

D. Mcdonald, NRR

1

,

i

!

RI:DRSS

SS

RI:D

S

(3,T

[

\\

JFuria

WPyciak

J oyner

7/d/93

9/IT93

9/1//93

i

.

I

t

t

9

1

i

E

I

f

i

i

4

f

OFFICIAL RECORD COPY

!'

,

i