Informs That Licensee Revised Section 11.0 of EMF-30 & Has Fully Implemented Criticality Safety Component of Safety, Security & Licensing,Per Suppl 1 of NRC Bulletin 91-001, Reporting Loss of Criticality Safety Controls
ML20057C174
Person / Time
Site: Framatome ANP Richland
Issue date: 09/20/1993
From: Faulkenberry B
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-91-001, IEB-91-1, NUDOCS 9309280036
Download: ML20057C174 (2)


Text

.

V i

j SIEMENS l-I September 20,1993 U.S. Nuclear Regulatory Commission

- Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Revised NRC Bulletin 91-01 Reporting Criteria

Reference:

NRC Bulletin 91-01, Supplement 1: Reporting Loss of Criticality Safety Controls, 4

j July 27,1993 i

The referenced NRC bulletin supplement provided additional guidance to licensees related to the reporting of criticality safety incidents and conditions. Siemens Power Corporation -

Nuclear Division (SPC) requirements for the reporting of criticality safety incidents to NRC are found in Chapter 3.0, Section 11.0 (Reporting Criticality Safety heidents and Emergencies) of the SPC Safety Manual (EMF-30). Section 11.0 of EMF-30 defines responsibilities for criticality safety incident reporting, both internal and to NRC; provides criteria for internal reporting to the Safety, Security and Licensing Department (Appendix 5) and external reporting to the NRC (Appendix 11); and provides specific instructions for telephone and followup written notification to NRC.

As requested by the referenced bulletin supplement, SPC has reviewed Section 11.0 of EMF-30 versus the reporting criteria in the supplement. As a result of this review SPC has revised Section 11.0, and in particular the appendix providing criteria for reporting to NRC, to directly incorporate the criteria from the NRC bulletin supplement. The revised Section 11.0 was issued on September 10,1993 and has been fully implemented by the Criticality Safety Component of Safety, Security and Licensing. SPC reporting criteria and management implementation procedures therefore fully meet NRC's current criteria. Questions in this regard can be directed to L.J. Maas, Manager, Regulatory Compliance on 509-375-8537.

Very truly yours, 49 4

cc:

B. H. Faulkenberry, Administrator US NRC Region V 1

9309280036 930920 P

I PDR ADDCK 07001257 hO C

PDR

$3 B.N. Femreite Siemens Power Corporation d

Nuclear Uxcon - E ng neenng and Manufactunng Facity Richland 2101 Horn Rapds Road. PO Box 130. R.chtand, WA 99352 0130 P! ant M i Tet: (509) 375 8191 Far (509) 375 8402

l 4

, State of Washington County of Benton i

Bemal N. Femreite being first duly sworn, deposes and says: I am the Richland Plant Manager for the Siemens Power Corpordon - Nuclear Division. The attached Siemens Power Corporation letter dated Septerr57 N,1993 (" Revised NRC Bulletin 91-01 Reporting Criteria") was prepared under my supervision and direction, and, to the best of my knowledge and belief, the facts contained therein are true and correct.

i l

Y A

BefKal N. F reite 80!93 Dated Subscribed and sworn to before me this 20th day of September 1993

<2 L C1 f.:

ffotaty Public (j

d

(/

My Commission Expires:

7fD/ 7M