ML20057C128

From kanterella
Jump to navigation Jump to search
Memorandum & Order (Termination of Proceeding).* W/Certificate of Svc.Served on 930916
ML20057C128
Person / Time
Site: Pilgrim
Issue date: 09/13/1993
From: Gleason J
Atomic Safety and Licensing Board Panel
To:
BOSTON EDISON CO., NRC OFFICE OF THE GENERAL COUNSEL (OGC)
References
CON-#393-14311 93-678-03-OLA, 93-678-3-OLA, LBP-93-19, OLA, NUDOCS 9309270111
Download: ML20057C128 (3)


Text

I M.3//

'tr 4

  • LBP-93-19 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges James P.

Gleason, Chairman Charles N.

Kelber Thomas D.

Murphy

  • 38 SERVED SEP 1 6 1993

)

In the Matter of

)

)

Boston Edison Company

)

Docket No. 50-293-OLA (Pilgrim Nuclear Power Station)

ASLBP No. 93-678-03-OLA

)

Facility Operating License

)

September 13, 1993 No. DPR-35

)

)

MEMORANDUM AND ORDER (Termination of Proceeding)

In connection with the Boston Edison Company (Licensee) application for an expansion of a spent fuel pool at its Pilgrim Nuclear Power Station, the Board has pendino a request for hearing and petition to intervene filed by the Massachusetts Attorney General (Petitioner) on May 27, 1993.

Several extensions of time for filing contentions were requested and granted and a subsequent notification from the Petitioner, dated August 25, 1983, informs the Board that matters at issue with the Licensee have been satisfactorily resolved.

The Petitioner therein withdraws its motion to intervene and request for hearing, and the Staff on 9309270333 930916

{DR ADOCK 05000293 M

fp PDR

4 b

September 2, 1993, advised the Board that it has no objection to the withdrawal.

Accordingly, no matters in controversy existing between the parties, the Board terminates and dismisses the proceeding herein.

{

It is so Ordered.

FOR THE ATOMIC SAFETY AND LICENSING BOARD f

r

/

x-f J ies P.

Gleason, Chdirman DMINISTRATIVE JUDGE 1

Bethesda Maryland September 13, 1993 I

4 4

l I

j

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

.In the Matter of BOSTON EDIS0N COMPANY Docket No.(s) 50-293-OLA r

(Pilgrim Nuclear Power Station)

CERTIFICATE OF SERVICE I

I hereby certify that copies of the foregoing RE-SERVED LB M&O AS LBP-93-19 I

have been served upon the following persons by U.S. mail, first class, except i

as otherwise noted and in accordance with the requirements of 10 CFR Sec. 2.712.

Office of Commission Appellate AJministrative Judge Adjudication James P. Gleason, Chairman i

U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board l

Washington, DC 20555 U.S. Nuclear Regulatory Commission Washington, DC 20555 t

Administrative Judge Administrative Judge 1

Charles N. Kelber Thomas D. Murphy Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Ann P. Hodgdon, Esq.

W. S. Stowe, Esquire Arlene A. Jorgensen, Esq.

Boston Edison Company Office of the General Counsel 800 Boylston Street, 36th Floor U.S. Nuclear Regulatory Commission Boston, MA 02199 Washington, DC 20555 Joseph W. Rogers, Esquire Assistant Attorney General Regulated Industries Division Public Protection Bureau l

131 Tremont Street, 3rd Floor Boston, MA 02111 1

v t

Dated at Rockville, Md. this

/j-j /

16 day of September 1993 4/

e-l b l.u ( D.d L v Office of the Secretary of the Commission i

I