ML20057C064
| ML20057C064 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/15/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20057C065 | List: |
| References | |
| NUDOCS 9309270026 | |
| Download: ML20057C064 (2) | |
See also: IR 05000423/1993016
Text
{{#Wiki_filter:_ _ - _ _ _ _ , y . . SEP 151993 Docket No. 50-423 Mr. John F. Opeka Executive Vice President - Nuclear Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270 Dear Mr. Opeka: SUBJECT: NRC REGION I INSPECTION REPORT NO. 50-423/93-16 This letter transmits the findings of the announced safety inspection conducted by Mr. P. Patnaik of this office from July 26 - July 30,1993, and August 10 - 13,1993, at the Millstone Nuclear Power Station, Unit 3, Waterford, Connecticut. The inspection was directed at areas important to public health and safe.ty and was conducted in two phases: one just prior to the refuel outage, and the second during the refuel outage. The first phase of the inspection centered around review of the inservice inspection (ISI) program, the scope of work for the outage, and the procedures. The second phase of the inspection focused on non-destructive examination (NDE) activities related to the inservice inspection and the steam generator tube examination. The results of this inspection were discussed with the members of your staff at the exit meeting on August 13,1993. The inspector found the ISI and NDE activities to generally be planned, controlled, and documented properly. Two areas of potential weakness were noted as unresolved items. These are the lack of corrosion control on UT calibration blocks, and the use of a UT calibration block not specified in the approved ISI program while not documenting the change. Your staff acknowledged these findings and committed to review the issues to establish appropriate corrective actions. No violations were found during this inspection, and, therefore, no response to this letter is required. A: MIL 9316. INS OFFICIAL RECORD COPY 9309270026 930915 1 l $DR ADOCK 05000423 ). l PDR . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _
-_________ _ _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ . ~ $EP 151993 ' . , Mr. John F. Opeka 2 L L Your cooperation with us in this matter is appreciated. Sincerely, i Oricteni nera syf- _j iecqas V. Dan j i Jacque P. Durr, Chief l Engineering Branch Division of Reactor Safety Enclosure: As stated l- l l cc w/ encl:
W. D. Romberg, Vice President - Nuclear, Operations Services j S. E. Scace, Vice President, Millstone Station l ' F. R. Dacimo, Nuclear Unit Director R. M. Kacich, Director, Nuclear Licensing G. H. Bouchard, Director of Quality Services
l Gerald Garfield, Esquire Nicholas Reynolds, Esquire K. Abraham, PAO (2) All Inspection Reports Public Document Room (PDR) Local Public Document Room (LPDR) Nuclear Safety Information Center (NSIC) 1. NRC Senior Resident Inspector i State of Connecticut SLO bec w/ encl: Region I Docket Room (with concurrences) bec w/ encl (VIA E-MAIL): V. McCree, OEDO - V. Rooney, PM, NRR J. Stolz, NRR/PD I-4 O- ' W RI:DRS RI:DRS RI:DRS Patnaik Gray Durr 4 {{&t )'/ '[/93 09/ 09/1/93 09/7/93 , A: MIL 9316. INS OFFICIAL RECORD COPY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____ _____ __ _ j }}