ML20057B746
| ML20057B746 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 09/17/1993 |
| From: | Fenech R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20057B747 | List: |
| References | |
| NUDOCS 9309230218 | |
| Download: ML20057B746 (2) | |
Text
4
.-h, A
Tunnessee Vasey Authonty, Post O'fce Boy PCOO. Smidy-Daisy. Tenneuse 37379 2000 Robert A. Fenech vce President, reauoyan NucMar Plant September 17, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket No. 50-327 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 CORE OPERATING LIMITS REPORT (COLR)
In accordance with SQN Unit 1 Technical Specification 6.9.1.14.c enclosed is the Unit 1 Cycle 7 COLR.
Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.
Sincerely,
&h r-~A-<
Robert A. Fenech Enclosure ec:
See page 2 F10051 3m Awcnosooog7y@-
ggp[.
9309230218 930917-lll
-l l
U.S. Nuclear Regulatory Commission Page 2
-September 17, 1993 cc (Enclosure).
Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike j
Rockville Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator-U.S.. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 e
(
f 4
P r
'I
>