ML20057B746

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Sequoyah Nuclear Plant Unit 1 Cycle 7 Core Operating Limits Rept, Reflecting Redesigned Core Due to Titled Fuel Assembly H64 During Core Onload
ML20057B746
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 09/17/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057B747 List:
References
NUDOCS 9309230218
Download: ML20057B746 (2)


Text

4

.-h, A

Tunnessee Vasey Authonty, Post O'fce Boy PCOO. Smidy-Daisy. Tenneuse 37379 2000 Robert A. Fenech vce President, reauoyan NucMar Plant September 17, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket No. 50-327 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 CORE OPERATING LIMITS REPORT (COLR)

In accordance with SQN Unit 1 Technical Specification 6.9.1.14.c enclosed is the Unit 1 Cycle 7 COLR.

Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.

Sincerely,

&h r-~A-<

Robert A. Fenech Enclosure ec:

See page 2 F10051 3m Awcnosooog7y@-

ggp[.

9309230218 930917-lll

-l l

U.S. Nuclear Regulatory Commission Page 2

-September 17, 1993 cc (Enclosure).

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike j

Rockville Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator-U.S.. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 e

(

f 4

P r

'I

>