ML20057B698

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Repts 50-327/93-29 & 50-328/93-29.C/As:all Technicians W/Pass Responsibility Have Successfully Completed Training in Order to Obtain PASS Samples within Required Timeframe
ML20057B698
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/20/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9309230154
Download: ML20057B698 (4)


Text

-

l c.

.Q'

\\

1 3

Terrelie.Vit a M A :1, ibm Ghe ikin hin 50cocum% iennewe 37379 2000 i

Robert A Fenech v., e Fresea smuwmituaw ret

't September 20, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk-Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAII NUCLEAR PLANT (SQN) - NRC INSPECTION REPORT NOS. 50-327, 328/93 RESPONSE TO REQUEST FOR INFORMATION t

Enclosed is TVA's response to William E. Cline's letter to Mark O. Medford dated July 23, 1993, which transmitted the NRC inspection report containing a request for TVA to provide answers to questions concerning the operation of the postaccident sampling system (PASS) and the training of the personnel operating the PASS.

j If you have any questions concerning this submittal, please telephone C.11. Whittemore at (615) 843-7210.

4 Sincerely,

[- Ad Robert A. Fenech Enclosure cc: See page 2 i

220036 f" (D\\

(*

l 9309230154 930920 D

PDR ADDCK 05000327.

M pyg Lp l

0

E

.l

'F U.S. Nuclear Regulatory Commission Page 2 September 20, 1993 cc (Enclosure)*

Mr. D. E. LaBarge, Project Manager

[

U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike l

Rockville, Maryland 20852-2739 NRC Resident Inspector i

Sequoyah Nuclear Plant

{

2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 i

i 9egional Administrator f

U.'. Nuclear Regulatory Commission Region II

[

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

?

i s

?

h i

P i

i I

q i

ENCLOSURE j

The following is TVA's response to NRC's request for TVA to provide answers to questions concerning the operation of the postaccident i

sampling system (PASS) and the training of the personnel operating the

[

PASS.

QUESTION: What actions are being taken to make the PASS equipment operable?

t t

ANSWER:

The following modifications have been designed to either enhance the operation of PASS equipment or replace equipment that is inoperable for Units 1 and 2.

I 1.

RCS hydrogen / oxygen analyzers: At present, the hydrogen analyzers are inoperable and the oxygen analyzers are functional. The new modification will replace both the hydrogen and oxygen analyzers with one analyzer (for each i

unit) that is capable of analyzing both gases. This modification is presently scheduled to start in October 1993 and finish in June 1994. In the interim, the appropriate back-up compensatory method for hydrogen analysis is being used.

2.

RCS supply / return lines for continuous recirculation capability: This is an enhancement that should increase the effectiveness of the PASS by allowing sampling in all modes. The Unit 1 modification is presently scheduled to start in December 1993 and finish in February of 1995.

The Unit 2 modification is scheduled tc start in October

[

1993 and finish in January 1995.

3.

Demineralized water pumps for improved water pressure:

}

At present, the Unit I demineralized water pressure is l

inadequate to conduct a timely system flush. The Unit 2 demineralizer water pressure is fully adequate. The enhancement of adding a pump will increase the flushing effectiveness and will ensure a timely flush. The Unit 1 modification is presently scheduled to start in October 1993 and finish in March 1994. The Unit 2 modification is i

scheduled to start in October 1994 and finish in June 1995.

4.

New dedicated communication system:

The phone system that is presently being used is not a dedicated line for the 3

Chemistry personnel. The new system has been designed to

~

be a dedicated system.

The modification is presently scheduled to start in December 1993 and finish in June 1994.

-l

The modifications mentioned above are included in the Site 1mprovement Plan (SIP) and will be tracked and controlled as described in the Postrestart Plan.

QUESTION: What will the policy be for ti=cliness in repairing the equipment should it become inoperable in the future?

ANSWER:

The policy for repairing PASS equipment following the restart of the units will be to assign items that support PASS and l

Chemistry sampling / monitoring requirements, a Priority 3.

This priority is assigned to urgent work where a situation exists that has the potential to degrade station operations.

Chemistry management will periodically review the work request data base to ensure that items designated by Chemistry are prioritized appropriately.

QUESTION: What actions are being taken with regard to the training of I

personnel to operate the PASS?

r ANSWER:

Those individuals whose assigned responsibilities include PASS support are required to successfully complete the annual PASS training sessions. All the technicians with this assigned responsibility have successfully completed this training. One of the objectives of this training is to be able to demonstrate the ability to obtain PASS samples and complete required analyses within the required timeframe. Anj technician that fails to adequately demonstrate the ability to meet this objective will not ne assigned responsibilities for PASS sampling.

i i

i