Forwards Safety Evaluation Concluding That Safe Shutdown Capability at Plant Re Fire Protection Program Satisfies Requirements of Section Iii.G & Iii.L of App R to 10CFR50
ML20057B642
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/16/1993
From: James Shea
Office of Nuclear Reactor Regulation
To: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20057B643 List:
References
TAC-M63013, TAC-M63014, NUDOCS 9309230059
Download: ML20057B642 (3)


Text

i 6

C

[ ". *%g

., e

,s lr -. ( )fi/

S UNITED STATES 5g i!

NUCLEAR REGULATORY COMMISSION

'k*%j /

WASHINGTON, D.C. 20555 6 1 September 16, 1993 Docket Nos.'50-277 and 50-278 Mr. George A. Hunger, Jr.

. Director-Licensing, MC 52A-5 Philadelphia Electric Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, Pennsylvania 19087-0195

Dear Mr. Hunger:

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, FIRE PROTECTION PROGRAM (TAC NOS. M63013 AND M63014)

By letter dated September 30, 1986,- Philadelphia Electric Company submitted its Fire Protection Program (FPP) for the Peach Bottom Atomic Power Station, Units 2 and 3 (PBAPS).to the NRC. The FPP was submitted as part of a commitment documented in Confirmatory Action Letter No. 86-07 dated April 11, 1986.

Completion of the " Fire Protection Evaluation Report," retitled the

" Fire Protection Program," was part of an effort to fully implement the requi rements. of_10. CFR 50.48.

The NRC staff has completed a review of the " Fire Protection Program" document through Revision 4 as well as certain other documents related to the-implementation of Appendix R requirements. The enclosed safety evaluation (SE) concludes that the safe shutdown capability at Peach Bottom, as~ described in the PBAPS Fire Protection Program, with approved exemptions, satisfies the requirements of Section III.G and III.L of Appendix R to'10 CFR Part 50..This SE does not change the results of any previous _NRC staff evaluations or inspections of the PBAPS FPP or any of the conclusions drawn in previous NRC staff documents.

Section 2.4.8 of the SE addresses the status of technical specifications (TS) for alternate safe shutdown equipment and other fire protection equipment.

Resolution of staff requests for alternate shutdown equipment technical specifications and other fire protection technical specification issues.should be accomplished during review of the licensee's improved standard technical specification program. The licensee has committed to submit an application for the improved standard TS in July 1994.

The SE does not make any conclusions related to the issues in NRC Bulletin 92-01, " Failure of Thermo-Lag 330 Fire Barrier System to Maintain Cabling in Wide Cable Trays and Small Conduits Free From Fire Damage" or in Bulletin 92-01, ggggggs gi8;g 20 FILE CENTER COPY

P Mr. George A. Hunger, Jr. September 16, 1993 Supplement 1, " Failure of Thermo-Lag 330 Fire Barrier System to Perform Its Specified Fire Endurance Function."

Resolution of fire barrier issues will be the subject of separate correspondence.

4 Since y,

N JosephNW.Shea,ProjectManager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page i

1 e-i J

Mr. George A. Hunger, Jr.

Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 CC:

I J. W. Durham, Sr., Esquire Mr. William P. Dornsife, Director Sr. V.P. & General Counsel Bureau of Radiation Protection Philadelphia Electric Company Pennsylvania Department of 2301 Market Street, S26-1 Environmental Resources Philadelphia, Pennsylvania 19101 P. O. Box 8469 Harrisburg, Pennsylvania 17105-8469 Philadelphia Electric Company ATTN: Mr. D. B. Miller, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township Route 1, Box 208 R. D. #1 Delta, Pennsylvania 17314 Delta, Pennsylvania 17314 Philadelphia Electric Company Public Service Commission of Maryland ATTN:

Regulatory Engineer, Al-2S Engineering Division Peach Bottom Atomic Power Station ATTN:

Chief Engineer Route 1, Box 208 231 E. Baltimore Street Delta, Pennsylvania 17314 Baltimore, MD 21202-3486 Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, Pennsylvania 17314 B-3, Tawes State Office Building Annapolis, Maryland 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. John Doering, Chairman 475 Allendale Road Nuclear Review Board King of Prussia, Pennsylvania 19406 Philadelphia Electric Company 955 Chesterbrook Boulevard Mr. Roland Fletcher Mail Code 52C-1 Department of Environment Wayne, Pennsylvania 19087 201 West Preston Street Baltimore, Maryland 21201 Carl D. Schaefer External Operations - Nuclear Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 l