Announces Intent to Conduct Osti During Periods 931101-05 & 1115-19,per Guidance in NRC Insp Manual 93802.Informs That Insp Team Will Conduct pre-insp Visit on 931012-13 to Obtain Access Training & Be Badged for Unescorted Site Access
ML20057B488
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/15/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Horn G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 9309220127
Download: ML20057B488 (5)


Text

_

"f %q

.NITED ST ATES NUCLEAR REGULATORY COMMISSION j

,C EcicN iv l

k/ b all A V AN N. AZA O RIVE. LUIT E 400 3....,_

ARLINGTON TEXAS 76011 8064 j a6 i

c--cP l o 1933 l

1 Docket:

50-298 License:

DPR-46 i

l Nebraska Public Power Districe l

ATTN:

Suy R. Horn, Vice President - Nuclear P.O. Bcx 98 Brownville. Nebraska 68321 l

SUBJECT:

SCHEDULE FOR THE OPERATIONAL SAFETY TEAM INSPECTION (OSTI) - NRC

]

INSPECTION REPORT NO. 50-298/93-202 This announces our intent to conduct an OSTI at the Cooper Nuclear Station during tne pericas of November 1-5 and Novemoer 15-19. 1993.

The inscection will be conducted utilizing the gulaance in NRC Inspection Manual 93802,

" Operational Safety Team Inspection 0STI)."

The inscettion objectives are to verify that the plant is being operated safely ana,n conformance with reculatory recuirements and that the organizations that control and support Diant operations are functioning effectively.

The inspection will incluae sustainea control room observations, i

observation of maintenance and surveillance activities, technical suoport for l

operations, review of eauipment harcware, corrective actions implemented to l

resolve ceficiencies, and plant area tours.

l The ins;ection team will be led by Mr. J. D. Wilcox, Team Leader, Scecial Inspect 1:n Branch. Office of Nuclear Reactor Regulation (NRR).

The assistant

_eam lea:er will te Mr. W. B. Jones. Project Engineer, Division of Reactor

?rojects DRP). Region IV.

The following incividuals will assist in the team inspect':n.

"r.

?. Aagner. Team Leaaer. 01 vision of Reactor Safety (DRS). :egion IV e

Mr. ; Pellet. Chief. Coerations Section. DRS. Region IV

9. G. Werner. Resident Insoector DRP. Region IV Mr. M. Runyan. Reactor Inspector. DRS, Region IV e

e Mr. C Paulk Reactor Inspector. DRS. Region IV Mr. R. DePriest. Reactor Engineer NRR Contract Personnel (2)

The inscection team will conduct a cre-inspection visit on October 12-13, Be purpose of this visit is to obtain site access training and b }

1993.

21TL1

/t 11 l O O

'U 9309220127 930915 PDR ADOCK 05000298

' J' '

f PDR L

Nebraska Public Power District 89l6 M '

occ to DMB (IE01)

I bcc distrib, by RIV:

(

J. L. Milhoan Resident Inspector Section Chief (DRP/C)

Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS Section Chief (DRP/TSS)

Project Engineer (DRP/C)

RIV File SRI - River Bend G. Imbro, MS: 9Al P. Wagner K. Connaughton, Project Manager, MS: 13E5 J. Pellet Senior Resident Inspector - Fort Calhoun G. Werner M. Runyan C. Paulk R. DePriest, NRR (E-Mail) l I

l 1

/k h*RIV:DRP/C

  • NRR

!'*C:DRP/C

  • D:DRS D:DRP WBJonesidf JDWilcox JEGagliardo SJCollins ABBeach M

) 9/

/93 9/ /93 l 9/

/93 9/ /93 9//f/93h "previously concurred

Nebraska Public Power District badged for unescorted site access, discuss the inspection scope with licensee personnel, conduct a tour of the facility, ana gather information for the inspection. An entrance meeting has oeen scheduled for Wednesday, October 13 at 9 a.m. (CDT) an your training conference room. A tentative exit meeting has been scheduled for November 22, 1993. at 9 a.m. (CST) in the training conference room.

We understand that Mr. Gene Mace nas been designated as your primary interface with the inspection team. Any aaditional accommodations and any document requests will be forwarded via telecearerence with Mr. Mace or identified during the pre-inspection visit.

Should you have any questions regarding this inspection, please contact the inspection team leader, Mr. J. D. Wilcox. at (301) 504-1262 or assistant team leader, Mr. Bill Jones. at (S17) 860-8147.

Sincerely,

[

,gnO i

/ A. Bill Beach, Direc' tor / !

7, Division of Reactor b jehts v

cc:

Nebraska Public ower District ATTN:

G. D. Watson, General Counsel P.O. Box 499 Columbus, Nebras(a 68602-0499 Nebraska Public ;ower District ATTN:

Mr. Davic A. Whitman P.0. Box 399 Columous. Nebras(a 68602-0499 Nebraska Departrent of Environmental Control ATTN:

Randolph Jood, Director P.O. Box.98922 Lincoln, Nebraska 68509-8922 Nemaha County Board of Commissioners ATTN: Larry Bohhen, Chairman Nemaha County Courthouse 1824 N Street Auburn, Nebraska 58305

Nebraska Public Power District ;

i Nebraska Department cf Health ATTN:

Harold Borchert, Director i

Division of Radiological Health 301 Centennial Mall, South P.0. Box 95007 Lincoln, Nebraska 68509-5007 i

Kansas. Radiation Control Program Director

.ti s

6 i

I L

+

- i l

s.

i l

i 5!

.; l

i I

t I

I "i

,Nebriska Public Power District S915 E bec to DMB (IE01) bcc distrib. by RIV:

J. L. Milhoan Resident Inspector Section Chief (DRP/C)

Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS Section Chief (DRP/TSS)

Project Engineer (DRP/C)

RIV File SRI - River Bend G. Imbro, MS: 9Al P. Wagner K. Connaughton, Project Manager, MS: 13E5 J. Pellet Senior Resident Inspector - Fort Calhoun G. Werner M. Runyan C. Paulk R. DePriest, NRR (E-Mail) l l

l l

)

)

i I

  • RIV:DRP/C
  • NRR
  • C:DRP/C
  • D:DRS D:DRP k WBJones;df JDWilcox JEGagliardo SJCollins ABBeach[

9/ /93 9/ /93 9/ /93 9/ /93 9//f/93k

  • previously concurred

_ _ _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - _ - _ - _ _ _ _ _ _ _ - _ _ _ - _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ -