Notice of Withdrawal of 930427 Application for Proposed Amend to License NPF-49,allowing one-time Extension of Containment Integrated Leak Rate Test for Plant
ML20057B357
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/15/1993
From: Rooney V
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20057B354 List:
References
NUDOCS 9309210233
Download: ML20057B357 (2)


Text

,

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHEAST NUCLEAR ENERGY COMPANY DOCKET N0. 50-423 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The United States Nuclear Regulatory Commission (the Commission) has granted the request of Northeast Nuclear Energy Company, et al. (the licensee) to withdraw its April 27, 1993 application for proposed amendment to Facility Operating License NPF-49 for the Millstone Nuclear Power Station, Unit No. 3, located at the licensee's site in New London County, Connecticut.

The proposed amendment would have revised the Technical Specifications to allow a one-time extension of the containment integrated leak rate test for Millstone Unit No. 3.

The Commission has previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on May 26, 1993 (58 FR 30198).

However, by letter dated September 2, 1993, the licensee withdrew the proposed change.

For further details with respect to this action, see the application for amendment dated April 27, 1993, and the licensee's letter dated September 2, 1993, which withdrew the application for license amendment. The above documents are available for public inspection at the Commission's Public e

9309210233 930915 PDR ADOCK 05000423 P

ppg.

i

~

. Document Room, The Gelman Building, 2120 L Street, NW., Washington, DC 20555, and at the local public document room located at the learning Resources Center, Thames Valley State Technical College, 574 New London Turnpike, Norwich, Connecticut 06360.

i Dated at Rockville, Maryland, this 15th day of September 1993.

FOR THE NUCLEAR REGULATORY COMMISSION f

L

/

7 Vernon L. Rooney, enior Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation L