Notifies Util of Pending Requalification Program Insp Scheduled for Week of 931025.Requests Util Furnish Sample Plan/Test Outline for Exam
ML20057B011
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/03/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9309170060
Download: ML20057B011 (3)


Text

.

[y C',

SEP 31993 Docket Nos. 50-352 50-353 Mr. D. M. Smith Senior Vice President -

Nuclear Philadelphia Electric Company Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 Wayne, PA 19087-0195

Dear Mr. Smith:

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION In a telephone conversation on August 26,1993, Mr. V. Cwietniewicz, Superintendent of l

Training, and Mr. D. Florek, Sr. Operations Engineer, arranged to evaluate the requalification program at the Limerick Nuclear Generating Station. The NRC will evaluate the facility's licensee's requalification program based on inspection activities in accordance with NRC Inspection Manual, Temporary Instruction TI-2515/117. The inspection will be performed based on facility-administered examinations, which are scheduled to start October 12, 1993. The specific onsite inspection will be performed during the week of October 25,1993.

In order to prepare for the inspection activities, we request that you furnish a sample plan / test outline for the examination, as well as copies of the examinations, to be administered the week of October 25,1993. Mr. Cwietniewicz agreed to provide these materials by October 18, 1993. Your staff should assure appropriate measures are taken to preclude examination compromise when submitting the examinations.

l 160000 l

9309170060 930903 9

[DR ADDCK 05000352 S

l PDR bs

\\\\

Mr. D. M. Smith 2

SEP 3 1993 l

Thank you for your cooperation in this matter. If you have any questions on the evaluation process, please contact Mr. R. Conte, Chief, BWR Section, at (215) 337-5210.

Sincerely,

@ginal SIBBCd 93 g, BettenhBBB" Lee H. Bettenhausen, Chief l

Operations Branch Division of Reactor Safety cc:

J. Doering, Chairman, Nuclear Review Board D. R. Helwig, Vice President - Limerick Generating Station G. A. Hunger, Jr., Manager - Licensing Fection J. L. Kantner, Regulatory Engineer - Limerick Generating Station V. Cwietniewicz, Superintendent of Training T. Dougherty, Manager - Operations Training Secretary, Nuclear Committee of the Board Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC) l NRC Resident Inspector l

Commonwealth of Pennsylvama bec:

i Region I Docket Room (with concurrences)

D. Florek, DRS Master Exam File i

bec: (Via E-Mail)

V. McClee, OEDO l

F. Rinaldi, NRR M. Boyle, Acting PDI-2, NRR OFFICIAL RECORD COPY G: LIM 10129 l

Mr. D. M. Smith 3

sgp 3 1993 (VIA E-MAIL AND NO ATTACIIMENT)

L. Bettenhausen, DRS R. Conte, DRS l

S RI:DRS RI:DRS mg C

hausen Q3/26/93

-08/ 1/93 Off3

)

OFFICIAL RECORD COPY G: LIM 10129

.