Requests Addl Info Re 930105 Submittal Which Proposed Revision to Operating License & TS to Allow Increase in Rated Thermal Power
ML20057A930
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/13/1993
From: William Reckley
Office of Nuclear Reactor Regulation
To: Carns N
WOLF CREEK NUCLEAR OPERATING CORP.
References
TAC-M85311, NUDOCS 9309160221
Download: ML20057A930 (3)


Text

1 1

September 13, 1993 Docket No. 50-482 Mr. Neil S. Carns President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, Kansas 66839

Dear Mr. Carns:

SUBJECT:

WOLF CREEK GENERATING STATION - REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED POWER RERATE (TAC NO. M85311)

Enclosed are questions related to the Wolf Creek Nuclear Operating Corporation's submittal dated January 5,1993, which proposed a revision to the operating license and technical specifications to allow an increase in rated thermal power.

The reporting requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under Public Law 96-511.

Sincerely, Original Signed By William D. Reckley, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION Request for Additional Docket File RJones Information NRC PDR WReckley Local PDR EPeyton cc w/ enclosure:

PDIV-2 R/F EJordan See next page JRoe ACRS (10)

EAdensam OGC OFFICE PDIV-2/LA PDIV-2 LPM PDIV-2/J)

EPNtEn' WRe b b e Nakk W.E DATE g/lc/93 9/10 93 9/10/93

/ /

/ /

/

fES/N0 h N0 YE M YES/N0

,YES/NO copy

~

0FFICIAL RECORD COPY FILENAME: B:\\M85311.RAI 9309160221 9

!:" ^=" "30913"m2 -

EC HLE BENE 8 myy i

,u

Mr. Neil S. Carns September 13, 1993 cc w/ enclosure:

Jay Silberg, Esq.

Mr. Otto Maynard Shaw, Pittman, Potts & Trowbridge Vice President, Plant Operations 2300 N Street, NW Wolf Creek Nuclear Operating Corporation Washington, D.C.

20037 P. O. Box 411 Burlington, Kansas 66839 Mr. C. John Renken Policy and Federal Department Regional Administrator, Region IV Missouri Public Service Comission U.S. Nuclear Regulatory Comission P. O. Box 360 611 Ryan Plaza Drive, Suite 1000 Jefferson City, Missouri 65102 Arlington, Texas 76011 Regional Administrator, Region III Mr. Kevin J. Moles U.S. Nuclear Regulatory Comission Manager Regulatory Services 799 Roosevelt Road Wolf Creek Nuclear Operating Corporation Glen Ellyn, Illinois 60137 P. O. Box 411 Burlington, Kansas 66839 Senior Resident Inspector U.S. Nuclear Regulatory Comission P. O. Box 311 Burlington, Kansas 66839 Chief Engineer Utilities Division Kansas Corporation Comission 1500 SW Arrowhead Road Topeka, Kansas 66604-4027 Office of the Governor State of Kansas Topeka, Kansas 66612 Attorney General 1st Floor - The Statehouse Topeka, Kansas 66612 County Clerk Coffey County Courthouse Burlington, Kansas 66839 Mr. Gerald Allen Public Health Physicist Bureau of Environmental Health Services Division of Health Kansas Department of Health and Environment 109 SW Ninth Topeka, Kansas 66612

I Enclosure RE0 VEST FOR ADDITIONAL INFORMATION PROPOSED WOLF CREEK POWER RERATE 1.

Provide additional information related to the evaluations performed to verify environmental qualification of equipment.

Discussions should address equipment located inside and outside of containment.

2.

Provide a discussion regarding the review of licensing basis analyses that are located largely outside of the Updated Safety Analysis Report (USAR) (e.g., station blackout, anticipated transients without scram, individual plant evaluation).

3.

Provide a discussion regarding plans for USAR update and/or other configuration control practices which will address the large number of evaluations performed for the rerate.

In particular, address the concern that licensing / design basis analyses, while bounding, may not reflect planned operating conditions. How will future changes to the facility capture not only the specific change but also the rerated operating conditions?

4.

Provide clarification regarding the pressurizer subcompartment analysis.

What evaluations and reanalyses were performed?

5.

Clarify the discussion regarding the condensate storage tank (CST) inventory and the adequacy of the existing technical specification considering both the required inventory and allowances for configuration and losses.

6.

Provide additional details regarding initial conditions assumed for the containment pressure and temperrture analyses. Clarify the assumptions related to the maximum safety injection (SI) case.

-