September 7, 1993 4
Docket Nos. 50-321 and 50-336 Mr. J. T. Beckham, Jr.
Vice President - Plant Hatch Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201
Dear Mr. Beckham:
SUBJECT:
ASSESSMENT OF ECCS TORUS SUCTION VALVES' CATEGORIZATION AND TESTING EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M83001 AND M83002)
By letter dated December 10, 1991, the NRC staff transmitted a Safety Evaluation (SE) regarding your pumps and valves' inservice testing program for the second 10-year interval for Plant Hatch.
In the SE, the staff requested that you review the ASME Code,Section XI, IWV-2100 categorization and testing of the ECCS torus suction valves to ensure that their current categorization and testing are appropriate. By letter dated March 10, 1992, you responded to the staff's request.
l The staff has reviewed your response and finds that the current categorization and testing requirements for these valves do not have to be changed at this time. However, the staff is currently considering a potential generic backfit regarding the categorization and testing of these valves. You will be notified if the staff decides to readdress this issue for Plant Hatch.
This letter completes the NRC staff actions regarding TAC Nos. H83001 and M83002.
If you have any questions regarding this letter, please contact me at (301) 504-1496.
Sincerely,
/s/
Kahtan H. Jabbour, Senior Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
Glainas OGC, 15B18 Docket File DMatthews ACRS (10)
P-135 NRC & Local PDRs KJabbour EMerschoff RII PDII-3 R/F LBerry Svarga EWang j 7
PM:PDII-3 y'bNRR NR8 fp '
D:f 'theks 14 LA:PDIl-31 PDII-3 x Lperry.Q EWank" KJabbour/rt RB' fbtt Jilorberg DMat
?/4/93 V'/t/93 y/ t 793 7 17 /93 E'/5//93 G/r//93 0FFICIAL RECORD COPY I /
DOCUMENT HAME: G:\\ HATCH \\ HAT 83001.VLV i
930915029B 930907 hE '
'~ D @$" I
~
\\
P
September 7, 1993 Docket Nos. 50-321 and 50-336 Mr. J. T. Beckham, Jr.
Vice President - Plant Hatch Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201
Dear Mr. Beckham:
t
SUBJECT:
ASSESSMENT OF ECCS TORUS SUCTION VALVES' CATEGORIZATION AND TESTING EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M83001 AND M83002)
By letter dated December 10, 1991, the NRC staff transmitted a Safety Evaluation (SE) regarding your pumps and valves' inservice testing program for l
the second 10-year interval for Plant Hatch.
In the SE, the staff requested that you review the ASME Code,Section XI, IWV-2100 categorization and testing of the ECCS torus suction valves to ensure that their current categorization and testing are appropriate. By letter dated March 10, 1992, you responded to the staff's request.
The staff has reviewed your response and finds that the current categorization and testing requirements for these valves do not have to be changed at this time.
However, the staff is currently considering a potential generic backfit regarding the categorization and testing of these valves.
You will be notified if the staff decides to readdress this issue for Plant Hatch.
This letter completes the NRC staff actions regarding TAC Nos. M83001 and M83002.
If you have any questions regarding this letter, please contact me at (301) 504-1496.
Sincerely,
/s/
Kahtan N. Jabbour, Senior Project Manager Project Directorate 11-3 Division of Reactor Projects - I/II l
Office of Nuclear Reactor Regulation 1
cc:
See next page DISTRIBUTION:
Glainas OGC, 15B18 Docket File DMatthews ACRS (10)
P-135 NRC & Local PDRs KJabbour EMerschoff RII PDII-3 R/F LBerry SVarga EWang 7 1
'l 't EWar.g: g PM:PDII-3flNRR LA:PDI5-PDII,3 Nft /
K D:
3 KJabbour/rt RB Fett J!or erg DMatthews LBerryAti 4/4/93 7/f/93 f/ t(/93 7 M /93 E'/.7//93 C/ry/93 0FFICIAL RECORD COPY
/ /
DOCUMENT NAME:
G:7ATCH\\ HAT 83001.VLV 4
4
f %g['e
[i j,,
(.,'*
E UNITED STATES
- y NUCLEAR REGULATORY COMMISSION g;
?
WASHINGTON, D.C. 2055MKs01 September 7,1993 Docket Nos. 50-321 and 50-336 Mr. J. T. Beckham, Jr.
Vice President - Plant Hatch Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201
Dear Mr. Beckham:
SUBJECT:
ASSESSMENT OF ECCS TORUS SUCTION VALVES
- CATEGORIZATION AND TESTING EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M83001 AND M83002)
By letter dated December 10, 1991, the NPC staff transmitted a Safety Evaluation (SE) regarding your pump'
'lves' inservice testing program for e:
the second 10-year interval for Plano In the SE, the staff requested that you review the ASME Code,Section XI, IWV-2100 categorization and testing of the ECCS torus suction valves to ensure that their current categorization and testing are appropriate. By letter dated March 10, 1992, you responded to the staff's request.
The staff has reviewed your response and finds that the curren; categorization and testing requirements for these valves do not have to be changed at this time. However, the staff is currently considering a potential generic backfit regarding the categorization and testing of these valves.
You will be notified if the staff decides to readdress this issue for Plant Hatch.
This letter completes the NRC staff actions regarding TAC Nos. M83001 and M83002.
If you have any questions regarding this letter, please contact me at (301) 504-1496.
Sincerely, W:Ih +I. $how J
Kahtan N. Jabbour, Senior Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:
See next page t
B
i Mr. J. T. Beckham, Jr.
Georgia Power Company Edwin I. Hatch Nuclear Plant I
CC:
Mr. Ernest L. Blake, Jr.
Mr. Alan R. Herdt, Chief Shaw, Pittman, Potts and Trowbridge Project Branch #3 2300 N Street, NW.
U. S. Nuclear Regulatory Commission Washington, DC 20037 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. S. J. Bethay Manager Licensing - Hatch Mr. Dan H. Smith, Vice President Georgia Power Company Power Supply Operations P. O. Box 1295 Oglethorpe Power Corporation Birmingham, Alabama 35201 2100 East Exchange Place Tucker, Georgia 30085-1349 Mr. L. Sumner General Manager, Nuclear Plant Charles A. Patrizia, Esquire Georgia Power Company Paul, Hastings Janofsky & Walker Route 1, Box 439 12th Floor Baxley, Georgia 31513 1050 Connecticut Avenue, NW.
Washington, DC 20036 Resident Inspector U.S. Nuclear Regulatory Commission Mr. Jack D. Woodard Route 1, Box 725 Senior Vice President -
Baxley, Georgia 31513 Nuclear Operations Georgia Power Company Regional Administrator, Region II P. O. Box 1295 U.S. Nuclear Regulatory Commission Birmingham, Alabama 35201 101 Marietta Street, NW. Suite 2900 Atlanta, Georgia 30323 Chairman Appling County Commissioners Mr. Charles H. Badger County Courthouse t
Office of Planning and Budget Baxley, Georgia 31513 Room 610 270 Washington Street, SW.
Atlanta, Georgia 30334 Harold Reheis, Director Department of Natural Resources
~
205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 s
,