ML20057A739
| ML20057A739 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 09/08/1993 |
| From: | Fenech R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20057A740 | List: |
| References | |
| CON-TVA-SQN-TS-93-12 NUDOCS 9309150242 | |
| Download: ML20057A739 (2) | |
Text
.
e 1
i Tennessee Valley Authonty, Post Office Box 2000. Soody-Daisy, Tennessee 37379-2000 Robert A. Fenech V!ce President. Seadoyah Nuclear Pmnt September 8, 1993 TVA-SQN-TS-93-12 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk l
Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket No. 50-328 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 93-12, "0NE-TIME EXTENSION OF 18-MONTH SURVEILIANCE REQUIREMENT (SR) INTERVALS -
UNIT 2" In accordance with 10 CFR 50.90, we are enclosing a requested amendment to License DPR-79 to change the operating license of SQN Unit 2.
The proposed change will incorporate a temporary license condition that would extend certain TS 18-<nonth SR intervals to coincide with the Unit 2.
Cycle 6 refueling outage.
The proposed operating license change is identified 1in Enclosure 1.
The justification for the proposed change is provided in Enclosure 2.
A l
l proposed determination of no significant hazards consideration performed l
pursuant to 10 CFR 50.92 is provided in Enclosure 3.
A listing of SRs to be extended is provided in Enclosure 4.
TVA requests NRC approval of this' operating license change request by January 1994 to support the extension of SRs that will exceed their
,j 25 percent allowable extension in accordance with TS 4.0.2 as of January 31, 1994.
~2 l
TVA requests a 30-day implementation period for'this TS change following assuance.
i i
140089 j
)0 4
1 9309150242 93090s W'
l s
i DR ADOCK05000328yi.
1 ('
PDR.
l
U.S. Nuclear Regulatory Comission Page 2 September 8, 1993 Please direct questions concerning this issue to K. C. Weller at (615) 843-7527.
Sincerely, f
f f
/
",. a Robert A. Fenech Sworn t and subsc ibed before me this r/Jday of >"< I - 4 1993 Notary Public My Comission Expires 8!77 Enclosures l
cc (Enclosures):
Mr. D. E. LaBarge, Project Manager l
U.S. Nuclear Regulatory Comission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 l
Mr. Michael H. Mobley, Director (w/o Enclosures)
Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tent 4essee 37243-1532 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Comission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711