ML20057A593
| ML20057A593 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/09/1993 |
| From: | Forney W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Link R WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 9309150017 | |
| Download: ML20057A593 (3) | |
Text
-
September 9,
1993 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:
Mr. R. E. Link Vice President Nuclear Power 231 West Michigan Street - P379 1
Milwaukee, WI 53201
Dear Mr. Link:
SUBJECT:
DOCUMENTATION REQUEST TO SUPPORT THE POINT BEACH SYSTEMS BASED
)
INSTRl"iENTATION AND CONTROL INSPECTION (SBICI)
I would like to inform you that the NRC will perform a system based instrumentation and control inspection (SBICI) at the Point Beach Nuclear Power Plant.
The onsite inspection activities are scheduled for the weeks of January 10, January 24, and February 7,1994.
The inspection will assess design, operation, maintenance, surveillance, quality assurance, and corrective actions associated with instrumentation and control systems.
To accomplish its objectives, the SBICI team will review a broad range of information and activities for the 1&C system loops selected.
The attachment to this letter lists the initial items which the team expects to review.
The list is being provided to allow you to anticipate the team's informational needs.
I request your assistance in making this information available for review during the January 10-14, 1994, pre-inspection visit.
If you have any questions regarding the attachment or the inspection itself, please contact Mr. Ronald Gardner (708/790-5524) or Mr. David Butler (708/790-5796) of my staff.
Sincerely, original signed by G.
C.
Wright for William L. Foraey, Acting Director Division of Reactor Safety
Attachment:
As stated See Attached Distribution YO Rlli Rilb vfa RUI 1
111 Forne/V g
nc
[ right-Uu er/lc Gardner y
9/9/93
/7/93 9/(/93 9/9/93 9/7/93 I
9309150017 93o909 p
gDR ADDCK 0500 2 6 i
/gpf I
s Wiscosin Electric Power Company 2
September 9, 1993 Distribution cc w/ attachment:
l G. J. Maxfield, Plant Manager OC/LFDCB Resident Inspector, RIII Virgil Kanable, Chief Boiler Section Cheryl L. Parrino, Chairman Wisconsin Public Service Commission Robert M. Thompson, Administartor WI Division of Emergency Government bcc:
PUBLIC - IE01
.I l
a
,...wm
-.---_,2,
.m.,
-.-- e e,m._
,,....e._#v.,
.-y._.1..,
s_.
ATTACHMENT SBICI Information Reauest i
1.
Index of instrument loop design calculations.
2.
Index of setpoint calculations and setpoint tolerance analyses.
3.
Instrument setpoint control program.
4.
Instrument setpoint methodology used.
5.
List of safety related instrument loops.
6.
List of BOP instrument loops that can impact safety related systems and cause reactor trips.
7.
Loop schematics and P&I diagrams for items 5 and 6, above.
8.
FSAR and Technical Specifications.
9.
Summary of PRA study.
10.
M&TE program for instrumentation.
11.
Organizational chart of l&C engineering groups (corporate and site).
12.
Index of instrument surveill'ance procedures.
13.
Index of preventive and corrective maintenance procedures for safety related instruments.
t