ML20057A561

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-483/93-11 on 930802-0902.No Violations Noted
ML20057A561
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/08/1993
From: Snell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20057A562 List:
References
NUDOCS 9309140401
Download: ML20057A561 (2)


See also: IR 05000483/1993011

Text

'

DcD bc6

.

.

.

o

SEP

8 1993

.

.

Docket No. 50-483

1

Union Electric Company

ATTN:

Mr. Donald F. Schnell

Senior Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166

Dear Mr. Schnoll:

SUBJECT:

ROUTINE RADIATION PROTECTION INSPECTION AT CALLAWAY NUCLEAR POWER

STATION

This refers to the routine safety inspection conducted by Mr. D. W. Nelson of

this office on August 2 through September 2, 1993. This inspection included a

review of activities authorized for your Callaway Nuclear Power Station. At

the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations of activities in progress.

No violations of NRC requirements were identified during the course of this

inspection. However, concerns were raised about the effectiveness of your

ALARA program.

.Thile the findings from your self-assessment of the ALARA

program were very good for the areas addressed, because the scope failed to

include issues involving the performance of the ALARA group such as workload,

staff size and expanding responsibilities, the overall effectiveness of the

program is still in question.

This appears to be a weakness in your self-

assessment that should be addressed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

i

I

e

}

h

9309140401 930908

'

PDR

ADOCK 0D000483

,

I

PDR

-

I_E

C4)

1

-

-

- -

-

- -

-

-.

-

i

!

)

-

.

.

SEP

8 1993

Union Electric Company

2

.

We will gladly discuss any questions you have concerning this inspection.

.

Sincerely,

.. Original Sig,ned oy William Snell

.

,

William Snell, Acting Chief

Reactor Support Programs Branch

,

'

Enclosure:

Inspection Report

No. 50-483/93011(DRSS)

l

cc w/ enclosure:

l

G. L. Randolph, Vice President,

i

Nuclear Operations

l

J. V. Laux, Manager Quality

Assurance

S. E. Sampson, Supervising

i

Engineer, Site Licensing

OC/LFDCB

Resident Inspector, RIII

Region IV

Resident Inspector, Wolf Creek

K. Drey

C. John Renken, Engineer

Policy & Federal Dept.

Gerald Charnoff, Esq.

R. A. Kucera, Deputy Director,

Department of Natural Resources

Chairman, Illinois Commerce

Commission

bcc:

PUBLIC

t

I

j

RIII

RIII

R

I-

'

4 .,

j

'

Nelson /sd

Snpil

-

08/3f/93

,p/g/jJ

9 r 93