Forwards Operational Safety Team Insp Rept 50-271/93-80 on 930607-0702.Insp Conducted as Result of Observed Decline in Performance During SALP Period Mar 1991 - Jul 1992 in Listed Areas
ML20057A535
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/08/1993
From: Cooper R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20057A536 List:
References
NUDOCS 9309140362
Download: ML20057A535 (3)


See also: IR 05000271/1993080

Text

<

.

-

~m

\\

'

<

.

s

SEP

8 1993

Docket No. 50-271

,

l

l

Mr. Donald A. Reid

l

Vice President, Operations

Vermont Yankee Nuclear Power Corporation

RD 5, Box 169

i

Ferry Road

j

Brattleboro, Vermont 05301

l

l

Dear Mr. Reid:

l

SUBJECT:

NRC Region I Team Inspection No. 50-271/93-80 - Operational Safety Yeam

Inspection

i

This refers to the Operational Safety Team Inspection (OSTI) led by Mr. Wayne L. Schmidt

l

of this of6ce between June 7 and July 2,1993, at the Vermont Yankee Nuclear Power Plant,

Vernon, Vermont. The team focused on verifying safe operation of the plant, conducting

their activities through personnel interviews, direct observations, and independent

l

examination of selected procedures, records, documents, and calculations. On

July 16,1993, Mr. Schmidt and I held a public exit meeting with you and members of your

staff to present the inspection Endings. The enclosed inspection report documents the

findings of the inspection.

The purpose of the inspection was to allow the NRC to determine the effectiveness of the

Vermont Yankee organization in identifying, examining, and resolving problems that could

affect the safe operation of the plant. The inspection was conducted as a result of an

observed decline in performance during the last Systematic Assessment of Licensee

Performance (SALP) period (March 1991 through July 1992) in the areas of engineering and

technical support, safety assessment and quality veri 5 cation and security, and concerns

identified since then with fire barrier penetrations and control rod scram time testing. Also,

the team reviewed recent changes made by Vermont Yankee management, to address these

issues, to determine whether the scope and implementation would provide effective long-term

improvements.

We concluded that you continued to operate the plant safely. Your organization is beginning

i

to fully use industry and vendor experience to enhance operating performance. However,

additional work is needed in these areas to ensure the adequacy of your past reviews of

industry experience to reduce the possibility of the existence of safety vulnerabilities. We

found that management is more aggressive than in the past and is becoming more self-

critical. However, continued efforts are needed to improve the rigor of management controls

over processes and programs to reduce the continued heavy reliance on personnel. We are

1311 5

' ,0\\

9309140362 930908

i

PDR

ADDCK 05000271

U

,

G

pgg

y

\\

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

'

l

l

00

Vermont Yankee Nuclear

2

Power Corporation

'

encouraged by your line management's increased recognition of quality assurance audit and

l

surveillance activities as useful processes for identifying problems, as well as your enhanced

l

responsiveness to such findings.

!

We request that, within 60 days of receipt of this letter, you inform us, in writing, of the

actions taken or planned to improve reviews of industry experience and to improve

'

management controls over processes and programs. The response directed by this letter is

not subject to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

In accordance with 10 CER 2.790 of the NRC's " Rules of Practice," a copy of this letter and

!

j

its enclosures will be placed in the NRC Public Document Room.

Your cooperation with us is appreciated.

Sincerely,

Original Signed By:

l

Richard W. Cooper

,

i

l

Richard W. Cooper, II, Director

-

l

Division of Reactor Projects

Enclosure: NRC Operational Safety Team Inspection Report 50-271/93-80

cc w/ encl:

i

l

R. Wanczyk, Plant Manager

J. Thayer, Vice President, Yankee Atomic Electric Company

L. Tremblay, Senior Licensing Engineer, Yankee Atomic Electric Company

'

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts

R. Gad, Esquire

G. Bisbee, Esquire

R. Sedano, Vermont Department of Public Service

T. Rapone, Massachusetts Executive Office of Public Safety

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2 copies)

NRC Resident Inspector

State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

Commonwealth of Massachusetts, SLO Designee

l

i

t-

1

.

Vermont Yankee Nuclear

3

8 1993

Power Corporation

l

bec w/ encl:

l

Region I Docket Room (with concurrences)

l

Chief, Reactor Systems Branch, NRR, 8E23 (Section 2.4 and 6.2)

G. Kelly, DRP

1

l

bec w/ encl (VIA EcMAIL):

,

l

A. Ramey-Smith, OEDO

)

W. Butler, NRR

D. Dorman, NRR

i

i

i

i

J

RP

RI:D, 4

Schmidt

Haverkamp

C

.uv

9/?/93

9/7 /93

9/ /93

OFFICIAL RECORD COPY

G:\\SITESWY\\MVYOSTI.1