Enterg sai><ev, oa rai>ea
'ac-Operations
. jz-R. P. Bar k hurst W3F1-93-0172 A4.05 PR SAFEGUARDS INFORMATION September 7,1993 "THIS LETTER NOT SUBJECT-U.S. Nuclear Regulatory Commission TO PROTECTIVE REQUIREMENTS ATTN: Document Control Desk WHEN SEPARATED FROM Washington, DC 20555 MATERIAL CONTAINING SAFEGUARDS INFORMATION."
l
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Proposed Revision to the Physical Security Plan Gentlemen:
On May 4,1993, at the annual Regulatory Information Conference, Dr. Thomas E.
1 Murley announced a pilot program established by NRR to give special
]
consideration to licensee requests for changes requiring Staff Review involving high cost and. low safety benefit.
In response to Dr. Murley's initiative, Entergy Opertaions Inc, met with NRR Staff on June 8, 1993, to present an initial list of cost beneficial licensing actions (CBLAs). As part of the Burden Reduction Program for long term economic savings, this request is submitted to make CBLA changes to the Physical Security Plan (PSP).
These changes will allow added flexibility to determine the optimal secur'.ty compensatory measures based on plant activities and the status of the overall Security program. The proposed revisions to the PSP and supporting documentation for this request are attached.
i 65 140007
)
9309140192 930907 i
PDR ADOCK 050003B2 F
1 F
PDR L
.j i
. ~
-.I
^
i i
1 i
ls Proposed Revision to the Physical Security Plan f
l W3F1-93-0172 I
Page 2 September 7,1993 Entergy Operations has evaluated these changes in accordance with the requiremen+
of 10CFR50.54(p).
As discussed in the attachment, it was determined that these changes should be processed under the provisions of 10CFR50.90. Accordingly, we evaluated the proposed changes using the criteria in 10CFR50.92(c) and determined that the said changes involve no significant hazards considerations. The bases for this determination is-also attached.
Entergy Operations requests that the effective date for this revision be upon NRC issuance of the amendment.
l t
Entergy Operations has determined that Attachments 2 and 3 contain safeguards information as specified by 10CFR73.21.
The attached documentation should therefore be handled appropriately.
t Very truly yours, i
i e
h%
l
]
104 3 Shh?V R.P. Barkhurst Vice President, Operations l
Waterford 3 RPB/TSB/ssf Attachments (w/ Attachments 2 & 3) cc:
J.L. Milhoan, NRC Region IV D.L. Wigginton, NRC-NRR (w/o Attachments 2 & 3)
R.B. McGehee a
N.S. Reynolds a
NRC Resident Inspectors Office SAFEGUARDS INFORMATION "THIS LETTER NOT SUBJECT TO PROTECTIVE REQUIREMENTS WHEN SEPARATED FROM MATERIAL CONTAINING SAFEGUARDS INFORMATION."
yw-v-
y--g v
9 y
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION I
In the matter of
)
)
Entergy Operations, Incorporated
)
Docket-No. 50-362 Waterford 3 Steam Electric Station
)
AFFIDAVIT R.P. Barkhurst, being duly sworn, hereby deposes and says that he is Vice President, Operations - Waterford 3 of Entergy Operations, Incorporated; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Proposed Revision to the Physical Security Plan; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
i l
4U R.P. Barkhurst Vice President, Operations Waterford 3 STATE OF LOUISIANA
)
) ss PARISH OF ST. CHARLES
)
)
Subscribed and sworn to before me, a Notary Public in and for the Parish and State above named this
'7
- day of S E P T e m et/R 1993.
l L5-C,. w T
m Notary Public My Commission expires W iT +4 L i r c
.