Monthly Operating Rept for Aug 1993 for Millstone Nuclear Power Station,Unit 3
ML20057A421
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/31/1993
From: Doboe L, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-93-715, NUDOCS 9309140180
Download: ML20057A421 (5)


Text

. .

NORTHEAST UTILtTIES cenem on cn . semen sueet een.n. t aect> cut

. ,,<s ,s ,

r. u -

T j ec-i% .,. +uo . & ~

~~.,u.~,"* P O BOX 270 HARTFORD. CONNECTICUT 06141-0270 k k J [$'O'[. $'[.$A[.',II~E. , (203) 665 5000 Septenber 9, 1993 MP-93-715 Re: 10CFR50.71(a)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Reference:

Facility Operating License No. NPF-49 Docket No. 50-423

Dear Sir:

In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Repon 93-09 covering operation for the month of August is hereby forwarded.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY Step e I Scace Vice President, Millstone Station - NNECO Attachment cc: T. T. Martin, Region I Administrator P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos.1,2 & 3 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 i

L t

' ){

osuu nov ne 9309140180 930831 C /

PDR ADDCK 05000423 i:

R pyg (

- . . . . ~ ~ . - . . . - . _ - . . . . ~. ..- .

.i s .  ;

t i .  ;

i

"***** NRC OPERATlWG STATUS REPORT COMPLETE!; BY REACTOR ENGINEERING "*"** l i

i

\

1. DOCKET.... 50-423 OPERATING STATUS t

! 2. REPORTlWG PERIOD... AUGUST 1993 OUTAGE + ONLINE HOURS.. 744.0 + 0.0 = 744.0- ,

3. UT I L I TY CONT ACT . . . . . . . . . . . . . . . . .L . C. Doboe 203-447-1791 x 6076 "*********"

l

4. LICENSED T HERMAL P0WER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3411
  • MILLSTONE *

{

5. WAMEPL ATE R AT I NG ( GROSS MWE ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,253 MW
  • UNIT 3 *  ;
6. DESIGN ELECTRICAL RAflWG (NET MWE)............................. 1,153.6 **"** * **** '
7. MAxlMUM DEPENDABLE CAPACITY (CROSS MWE)........................ 1,184.2 r

f

8. max !MLM DEPE ND ABLE CAP ACI TY (WE T MWE ) . . . . . . . . . . . . . . . . . . . . . . . . . . 1,137.0 L ,
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, REASONS ARE........... f E
N/A
10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)...............N/A i

! 11. REASON FOR RESTRICTION, IF ANY....W/A =

l t

MONTH YEAR TO DATE CUMULATIVE TO DATE  !

========== . =====ssassss=

l *

12. HOURS IN REPORTING PERIOD 744.0 5,831.0 64,511.0  ;

i e l i

13. NUMBER OF HOURS THE REACTOR WAS CRITICAL 0.0 4,891.8 47,929.9 l, i 14. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 6,466.5 I

! 15. HOURS GENERATOR ONLINE 0.0 4,825.5 46,956.5

16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
17. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 16,060,804.0 153,251,102.6 .

t l

18. CROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 5,464,147.5 52,782,386.1 .
19. NET ELECTRICAL ENERGY GENERATED (MWH) -5,412.9 5,179,991.1 50,167,258.4 ,

i f

l 20. UNIT SERVICE FACTOR 0.0 82.8 72.8  ;

21. UNIT AVAILABILITY FACTOR 0.0 82.8 72.8 l

1

22. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 78.1 68.3 l

l

23. UNIT CAPACITY FACTOR (USING DER NET) 0.0 77.0 67.4
24. UNIT FORCED OUTAGE RATE 0.0 4.7 17.5
25. UNIT FORCED OUTAGE HOURS 0.0 238.5 9,970.9 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF [ACH)..............

N/A IF CURRENTLY SHUTDOWW, ESTIMATED STARTUP DATE......Septenber 29 1993

1 i

-O l

AVER AGE D AILY UNIT POWER LEVEL i

DOCKET NO: 50-423  :

UNIT: MILLSTONE UNIT 3 l DATE: September. 7.1993 COMPLETED BY: L. C. Doboe 203-447-1791 x 6076 MONTH A.ugust 1993  !

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL  ;

(MWE-NET) (MWE-hTT) 1 0 16 0 2 0 17 0 3 0 18 0 4 0 19 0 5 0 20 0 6 0 21 0 t

7 0 22 0 8 0 23 -

0 9 0 24 0 10 0 25 0 i

)

11 0 26 0

, 12 0 27 0

} 13 0 28 0 14 0 29 0 15 0 30 0 ,

l 31 0 i

i

U N IT S II U T D O W N S A N D POWE R RED UCTIONS '.

DOCKET NO: 50-423 UNIT: MILLSTONE UNIT 3 DATE: August 7.1993 COMPLETED BY: L. C. Doboe TELEPilONE: .203-447-1791 x 6076 Number Date Type Duration Reason Method of Licensee System Component Cause and Corrective Action to Prevent (1) (llours) (2) Shutting Ewnt Report Code Code Recurrence Down the Number (4) (5)

Reactor (3) 93-04 930731 S 744 C 4 N/A N/A N/A Refuel Outage 4 continued from previous month.

l.; Tvrc: L e ..ons: 1 Method 4: IEEE Standard 805-1984 F: Forced A Equipment Failure (Explain) 1 Manual S: Scheduled B Maintenance or Test 2 Manual Scram 5: IEEE Standard 803A-1983 C Refueling 3 Automatic Scram D Regulatory Restriction 4 Cop'inued from Previous Month E Operator Training A License 5 Power Reduction Exam (Duration = 0)

F Auministrative 9 Other (Explain)

G Operational Error (Explain) 11 Other

. - ~ -.- - .- ._ ___ - _ _ _ _ - _ _ _ _

REFUELING IN FO R M A TIO N REOUEST August 1993 l

1. Name of facility: Millstone 3. j l

I

2. Scheduled date for next refueling shutdown: July 30.1993 Currently in Refuel Outage
3. Scheduled date for restan following refueling: September 291993
4. Will refueling or resumption of operation thereafler require a technical specification  ;

change or other license amendments?  ;

e Y_es l 5. Scheduled date for submitting licensing action and supporting information.

l I

Submitted March 15.1993 & Julv 30.1993 l 6. Imponant licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design of performance analysis methods, significant changes in fuel design, new operating procedures:

Millstone Unit 3 current fuel design incorocrates a stainless steel skeleton and zircaloy .

fuel cladding desien. Cycle 5 feed assemblies will utilize zirlo fuel rod cladding:

selected assemblies will incorporate a zirlo skeleton. A Technical Specification change was submitted as ner cuestion 5 above. In addition. a Technical Specification change to increase the reauired boric acid volume in the Boric Acid Storage Tank was submitted on July 30.1993.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a): 0 (b): 525

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present size - 756.

No increase reauestei

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

End of cycle 5.  ;

i

,