Forwards Final Survey Repts for Westinghouse Site at Large, Pa.Documents Provided to Facilitate Preparation for Performance of Confirmatory Radiological Survey at Site
ML20057A393
Person / Time
Site: 07000997
Issue date: 08/03/1993
From: Kinneman J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Landis M
OAK RIDGE ASSOCIATED UNIVERSITIES
References
NUDOCS 9309140141
Download: ML20057A393 (5)


Text

_

p2 Mcg i

6

  1. f I,

f UNITED STATES y'

p, NUCLEAR REGULATORY COMMISSION 5

j REGloN I o,

475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 AUG 3g License No. SNM-951 Docket No. 070-00997 Oak Ridge Instititte For Science and Environment ATTN: Michelle Landis Environmental and Site Assessment Program P. O. Box 117 Oak Ridge, Tennessee 37831-0117

Dear Ms. I2ndis:

Subject:

WESTINGHOUSE ELECTRIC CORPORATION, LARGE, PENNSYLVANIA, SITE REMEDIAL ACTIONS AND FINAL SURVEY REPORTS Enclosed are the final survey repons for the Westinghouse Electric Corporation (W) site at Large, Pennsylvania. These documents are provided to facilitate your preparation for the performance of a confirmatory radiological survey of this site. The repons are in addition to those fumished to you with our letter dated June 14,1993. We are in contact with OV) to develop the information regarding the site which you requested in your letter dated July 23, 1993.

We request that you develop a survey plan and cost estimate for this site.

We would like to accomplish the survey as soon as possible and so will work with you by telephone to develop a schedule.

We appreciate your advice and assistance in this matter.

Sincerely yours, u=

^

o n D. Kinneman, Chief Re earch, Development, and ecommissioning Section Division of Radiation Safety and Safeguards I

r, tj i

9309140141 930803 i

PDR ADDCK 07000997 C

PDR

I Oak Ridge Institute for Science -l and Environment I

Enclosures:

As stated cc: (w/o enclosures)

D. Tikinsky, NMSS T. Mo,-NMSS 7

t i

e i-t i

i i

s i

l I

.=.

i t

i Enclosures i

1.

  1. 001 EVALUATION OF RADIATION DOSIMETERS DISTRIBUTED ON THE l

SI.TE. NOVEMBER 2.1992 i

2.

  1. 003 EVALUATION OF PORTIONS OF MONITORED DRAIN LINE SYSTEM ABANDONED IN PLACE. NOVEMBER 24.1992 3.
  1. 005 FINAL RADIOLOGICAL SURVEY OF INCINERATOR BUILDINCn DECEMBER 11.1992 4.
  1. 006 PRELIMINARY SURVEY OF SELECTED SITE BUILDINGS.

DECEMBER 7 '1992 5.

  1. 008 FINAL RADIOLOGICAL SURVEY OF PIT BEHIND BUILDING 5.

JANUARY 6.1993 6.

  1. 010 FINAL RADIOLOGICAL SURVEY OF PIPE CHASE WITHIN BUILDING NUMBER 9. JANUARY 6.1993 7.
  1. 011 FINAL i'ADIOLOGICAL SURVEY OF BUILDING NO. 8. (SURVEY SECTION 265). JANUARY 26.1993 8.
  1. 012 FINAL RADIOLOGICAL SURVEY OF THE FIRST FLOOR OF BUILDING NO. 7. (SURVEY SECTION 7). JANUARY 29.1993 9.
  1. 013 FINAL RADIOLOGICAL SURVEY OF BUILDING NO. 7. SECOND FLOOR. (SURVEY SECTION 28D). FEBRUARY 4.1993 10.
  1. 014 TINAL RADIOLOGICAL SURVEY OF BUILDING NO. 6A. (SURVEY SECTION 6). FEBRUARY 9.1993 11.
  1. 015 FINAL RADIOLOGICAL SURVEY OF THE BASEMENT OF BUILDING NO. 4. (SURVEY SECTION 14). FEBRUARY 16.1993 12.
  1. 016 FINAL RADIOLOGICAL SURVEY OF THE PIT IN BUILDING NO.9.

(SURVEY SECTION 9). MARCH 10.1993 13.

  1. 017 FINAL RADIOLOGICAL SURVEY OF THE FIRST FLOOR OF BUILDING NO. 6. (SURVEY SECTION 4). MARCH 11.1993

Oak Ridge Institute for Science and Environment 14.

  1. 018 FINAL RADIOLOGICAL SURVEY OF BUILDING NO.11. (SURVEY SECTION 28I). MARCH 15.1993 1

15.

  1. 019 FINAL RADIOLOGICAL SURVEY OF THE SECOND FLOOR OF BUILDING NO. 6. (SURVEY SECTION 5). MARCH 15.1993 16.
  1. 020 FINAL RADIOLOGICAL SURVEY OF THE FIRST FLOOR OF BUILDING NO. 9. (SURVEY SECTION 10L MARCH 17.1993 17.
  1. 021 FINAL RADIOLOGICA.L SURVEY OF BUILDING NO.10. (SURVEY SECTION 28H). MARCH 17.19M i

18.

  1. 022 FINAL RADIOLOGICAL SURVEY OF THE SECOND FLOOR OF BUILDING NO. 9. (SURVEY SECTION 28G). MARCH 17.1993 19.
  1. 023 FINAL RADIOLOGICAL SURVEY OF THE SECOND FLOOR OF BUILDING NO. 5. (SURVEY SECTION 2L MARCH 30.1993 20.
  1. 024 FINAL R ADIOLOGICAL SURVEY OF THE THIRD FLOOR OF BUILDING NO. 5. (SURVEY SECTION 3L MARCH 31.1993 21.
  1. 025 FINAL RADIOLOGICAL SURVEY OF THE FIRST AND SECOND FLOORS OF BUILDING NO. 4. (SURVEY SECTION 28AL APRIL 1.1993 22.
  1. 026 FINAL RADIOLOGICAL SURVEY OF BUILDING NO. 5A. (SURVEY SECTION 28CL APRIL 5.1993 23.
  1. 027 FINAL RADIOLOGICAL SURVEY OF ' IRE FIRST FLOOR OF BUILDING 4

NO.12. (SURVEY SECTION 16L APRIL 5.1993

+

24.

  1. 028 FINAL RADIOLOGICAL SURVEY OF THE SECOND FLOOR OF BUILDING NO.12. (SURVEY SECTION 28LL APRIL 7.1993 t

25.

  1. 029 FINAL RADIOLOGICAL SURVEY OF THE THIRD FLOOR OF BUILDING NO. 4. (SURVEY SECTION 15L APRIL 7.1993 26.
  1. 030 FINAL RADIOLOGICAL SURVEY OF THE FOURTH FLOOR OF BUILDING NO. 5. (SURVEY SECTION 28BL APRIL 8.1993 5

L.

I Oak Ridge Institute for Science ;

and Environment 27.

  1. 031 FINAL BUILDING SURVEY OF THE FIRE HALL. (SURVEY SECTION 28J). APRIL 8.1993 28.
  1. 032 FINAL RADIOLOGICAL SURVEY OF THE SECOND FLOOR OF

{

BUILDING NO 8A. (SURVEY SECTION 28F). APRIL 8.1993 i

29.

  1. 033 FINAL RADIOLOGICAL SURVEY OF THE HYDROGEN FACILITY.

(SURVEY SECTION 11). MAY 10.1993 i

30.

  1. 034 FINAL RADIOLOGICAL SURVEY OF THE FIRST FLOOR OF BUILDING NO. 5. (SURVEY SECTION 1). APRIL 20.1993 31.
  1. 035 FINAL RADIOLOGICAL SURVEY OF THE FIRST FLOOR OF Ilfl[LDING NO. 8A. (SURVEY SECTION 8). MAY 5.1993 32.
  1. 036 CALIBRATION RECORDS FOR REPORTS USED FOR RADIOLO71 CAL SURVEYS. APRIL 22.1993 33.
  1. 037 TECHNICAL DESCRIPTION OF INSTRUMENTS USED FOR f

RADIOLOGICAL SURVEYS. APRIL 30.1993 34.

  1. 038 FINAL RADIOLOGICAL SURVEY OF THE BUILDING ROOFS. (SURVEY SECTION 29). JUNE 1.1993 35.
  1. 039 FINAL RADIOLOGICAL SURVEY OF THE SITE GROUNDS. (SURVE f

SECTION 30). JUNE 2.1993 36.

  1. 040 RADIOLOGICAL SURVEY OF STREAMS ADJACENT TO THE SITE.

(SURVEY SECTION 31) 37.

  1. 041
INAL RADIOLOGICAL SURVEY OF THE STORM DRAIN SYSTEM ON THE SITE. (SURVEY SECTION 32). JUNE 8.1993 i

38.

  1. 042

SUMMARY

REPORT ON INFORMATION RELEVANT TO TERMINATION OF LICENSE NUMBER SNM-951. Julv 9.1993 39.

letters, with enclosures, dated January 11,1992, February 12, Febmary 24, April 16, April 30, May 14, July 9, and July 20,1993, from the licensee to the NRC, Region I.

4 L

!