Forwards SE Re Proposed Changes to TSs on Frequency of ECCS Venting & Notice of Denial of Amends & Opportunity for Hearing
ML20056H639
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/26/1993
From: Hood D
Office of Nuclear Reactor Regulation
To: Mccoy C
GEORGIA POWER CO.
Shared Package
ML20056H640 List:
References
TAC-M84527, NUDOCS 9309100243
Download: ML20056H639 (3)


Text

_ _ _ __ - _____ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ . .

  • \

~ '

fa m%,

A E UNITED STATES i'  ! NUCLEAR REGULATORY COMMISSION

(* / ***

WASHINGTON, D.C. 20555-0001 August 26, 1993 Docket Nos. 50-424 and 50-425 Mr. C. K. McCoy Vice President - Nuclear Vogtle Project Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201

Dear Mr. McCoy:

SUBJECT:

PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS ON FREQUEN'CY OF ECCS VENTING, V0GTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. M84527 AND M84528)-

By [[letter::ELV-03832, Application for Amends to Licenses NPF-68 & NPF-81,revising TS SR 4.5.2.b by Changing Frequency for Verifying That ECCS Piping Is Full of Water from Once Per 31 Days to Once Per 6 Months|letter dated September 17, 1992]], you proposed amendments to revise Vogtle Technical Specification 4.5.2.b to decrease the frequency for verifying that the emergency core cooling system (ECCS) piping is full of water from once every 31 days to once every 6 months. You note that this change would reduce radiation exposure to personnel performing these surveillances.

The NRC staff has reviewed the proposed change and, as discussed in the enclosed Safety Evaluation, finds it unacceptable. We find.that gases that could potentially damage ECCS pumps when needed to mitigate an accident continue to be found in nuclear power plants. Although the volume of such gases at Vogtle, to date, have been insufficient to cause an operability concern, gases have been observed in Vogtle ECCS lines since the date of your letter. Moreover, the NRC staff concludes that until the various potential mechanisms for introducing gases into ECCS lines in nuclear power plants are better understood, and appropriate procedures have been implemented and proven to preclude such occurrences, monthly surveillances should be continued.

Accordingly, your proposed amendments are deemed premature and are, therefore, denied. The NRC staff's decision to deny these amendments was discussed with you and other members of your staff on August 4,1993.

A copy of the Notice of Denial of Amendments and Opportunity for Hearing to be published in the Federal Reaister is enclosed for your'information.

hl eso,1oom.a eso m PDR P

ADOCK 05000424 1 PDR .

'(

Mr. C. K. McCoy August 26, 1993 If you have questions regarding this matter, contact me at (301) 504-3049.

Sincerely, Ar?L 00 Darl S. Hoo , Project Manager Project Directorate II-3

  • Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosures:

1. Safety Evaluation
2. Notice l cc w/ enclosures:

l See next page l

!? .

Mr. C. K. McCoy August 26, 1993 If you have questions regarding this matter

, contact me at (301) 504-3049.

Sincerely,

/s/

Darl S. Hood, Project Manager Project Directorate II-3 Division of Reactor Projects - I/II

Enclosures:

Office of Nuclear Reactor Regulation

1. Safety Evaluation
2. Notice cc w/ enclosures:

See next page Distribution:

Docket File NRC PDR & Local PDRs PDII-3 R S. Varga/F G. Lainas D. Matthews L. Berry (2)

D. Hood OGC-WF ACRS (10) 15-B-18 E. Herschoff P-315 R. Jones RII A. Thadani 8-E-23 C. Jackson 8-E-2 8-E-23 LA:PDIIb LBerryk(b (

PM:PD N DHood/rst OGC4'df

'f /g/93 (/y/93 /(kuj D:.Df DM thess

(//3 /93 0FFICIAL RECORD COPY

[/g/93 DOCUMENT NAM 2:

G:\V0GTLE\ VENTING.SER

i i

Mr. C. K. McCoy Georgia Power Company Vogtle Electric Generating Plant CC:

Mr. J. A. Bailey Harold Reheis, Director Manager - Licensing Department of Natural Resources Georgia Power Company 205 Butler Street, SE. Suite 1252 P. O. Box 1295 Atlanta, Georgia 30334 Birmingham, Alabama 35201 Attorney General Mr. J. B. Beasley Law Department General Manager, Vogtle Electric 132 Judicial Building Generating Plant Atlanta, Georgia 30334 P. O. Box 1600 Waynesboro, Georgia 30830 Mr. Alan R. Herdt Project Branch #3 Regional Administrator, Region II U. S. Nuclear Regulatory Commission  !

U. S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 101 Marietta Street, NW., Suite 2900 Atlanta, Georgia 30323 Atlanta, Georgia 30323 Mr. Dan H. Smith, Vice President Office of Planning and Budget Power Supply Operations Room 615B Oglethorpe Power Corporation 270 Washington Street, SW. 2100 East Exchange Place Atlanta, Georgia 30334 Tucker, Georgia 30085-1349 l Office of the County Commissioner Charles A. Patrizia, Esquire I l Burke County Commission Paul, Hastings, Janofsky & Walker l Waynesboro, Georgia 30830 12th Floor 1050 Connecticut Avenue, NW.

Mr. J. D. Woodard Washington, DC 20036 Senior Vice President -

Nuclear Operations Art Domby, Esquire Georgia Power Company Troutman Sanders P. O. Box 1295 600 Peachtree Street Birmingham, Alabama 35201 NationsBank Plaza Suite 5200 Atlanta, Georgia 30308-2210 Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 572 Waynesboro, Georgia 30830 l