'9 UNITED STATES NUCLEAR REGULATORY COMMISSION POWER AUTHORITY OF THE STATE OF NEW YORK ,

1 JAMES A. FITZPATRICK NUCLEAR POWER PLANT l l

NOTICE OF PARTIAL WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE  !

The United States Nuclear Regulatory Commission (the Commission) has granted the request by the Power Authority of the State of New York (PASNY or the licensee) to withdraw a portion of their June 16, 1993, application for a proposed amendment to facility Operating License No. DPR-59 for the James A.

FitzPatrick Nuclear Power Plant located in Oswego County, New York.

i The proposed amendment involved changes to the Technical Specifications '

(TSs) to extend the current intervals for bench checking and disassembling  ;

safety / relief valves in accordance with TSs 4.6.E.1 and 4.6.E.2, and for ,

functionally testing 10 percent of each snubber type in accordance with TS  !

4.6.1.3. The proposed changes would also extend the current interval for .

+

testing excess flow check valves in accordance with TS 4.7.D.I.b. PASNY f

requested extensions of these surveillance intervals until the start of the l next refueling outage, scheduled to start in January 1995. The portions of the license amendment relating to safety / relief and excess flow check valve testing were approved in License Amendment No. 195 that was issued on August 11, 1993. i 06' August lo,1993, the licensee submitted a letter to the'NRC requesting withdrawal of the requested extension of the current surveillance interval for snubbers. The licensee requested withdrawal on the basis that the extension of the surveillance interval was not required.

i I

9309100223 930907 II PDR ADOCK 05000333 Gj!

P PDR G'  !

C l

  • l The Commission has previously issued a Notice of Consideration of l i

Issuance of Amendment to Facility Operating License, Proposed No Significant i

Hazards Consideration Determination, and Opportunity for a Hearing which was  !

! published in the Federal Register on July 7, 1993-(58 FR 36444).

For further details with respect to this action, see the application for i amendment dated June 16, 1993, the supplement to the application dated i July 30, 1993, and the licensee's letter of August 19, 1993, which withdrew I the portion of the application for license amendment. The above documents are '

available for public inspection at the Commission's Public Document Room, 2120 l L Street, NW., Washington, DC 20555 and the Reference and Documents i

! Department, Penfield Library, State University of New York, Oswego, New York.

i i

l Dated at Rockville, Maryland, this 7th day of September 1993.

FOR THE NUCLEAR REGULATORY COMISSION ,

i

~

d

(  :

John E. Mennin'g, Project Manager  !

Project Directorate I-I l

Division of Reactor Projects - I/II i Office of Nuclear Reactor Regulation i

i