ML20056H509

From kanterella
Jump to navigation Jump to search
Notification of 930920 Meeting W/Westinghouse in Corvallis, or to Discuss low-pressure Integral Testing of AP600 Design
ML20056H509
Person / Time
Site: 05200003
Issue date: 08/26/1993
From: Hasselberg F
Office of Nuclear Reactor Regulation
To: Borchardt R
Office of Nuclear Reactor Regulation
References
NUDOCS 9309090453
Download: ML20056H509 (5)


Text

ki cnd 55 a f *'c%

fi

'k UNITED STATES

[.k. [f - ~ g j

NUCLEAR REGULATORY COMMISSION E i Qggl WASHINGTON. D C. 20555-0001

\\.,

August 26, 1993 Docket No.52-003 i

i MEMORANDUM FOR:

R. W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR FROM:

Frederick W. Hasselberg, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR F

SUBJECT:

NOTICE OF MEETING WITH WESTINGHOUSE TO DISCUSS LOW-PRESSURE INTEGRAL TESTING OF THE AP600 DESIGN DATE & TIME:

September 20, 1993 (8:15 a.m. - 5 p.m.)

LOCATION:

Oregon State University LaSells Stewart Center Agricultural Science Room 26th Street and Western Boulevard Corvallis, Oregon 97330 PURPOSE:

To ootain detailed information on the design and expected operation of the low-pressure integral systems test facility at Oregon State University and Westinghouse Electric Compa-ny's plans for obtaining long-term cooling data from matrix l

tests at the facility. Data from these tests will be used in

~

support of the Westinghouse AP600 design certification appli-cation. A preliminary meeting agenda and directions to the LaSells Stewart Center are enclosed.

NOTE:

Proprietary features of the AP600 design will be discussed.

c,0000C 9309090453'930826 i

f1'd 1

PDR ADOCK 05200003.

'O A

PDR,

i

August 26, 1993 PARTICIPANTS
* NRC WESTINGHOUSE ACRS DDI i

R. Jones B. McIntyre I. Catton J. Wheller D. McPherson L. Hochreiter P. Davis D. Harrison M. Rubin E. Piplica T. Kress A. Levin J. Butler B. Lindblad L. Shotkin L. Lau E. Wilkins i

T. King J. Hanson V. J. Dhir D. Bessette J. Reyes, OSU W. Wulff l

F. Hasselberg J. Groome, OSU N. Zuber M. Ortiz, INEL P. Boehnert j

(Original signed by) l Frederick W. Hasselberg, Project Manager f

Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR

Enclosures:

l As stated cc w/ enclosures:

See next page l

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC i

Staff Policy," 43 Federal Reaister 28058, S/28/78. However, portions of this meeting may be closed to protect Westinghouse proprietary information.

Members of the public who wish to attend should contact me at (301) 504-1141.

DISTRIBUTION:

Docket File PDST R/F TMurley/FMiraglia DCrutchfield PDR WTravers RBorchardt NRR Mailroom TEssig FHasselberg TKenyon PShea AChaffee, EAB TGody, EDO JMoore, 15B18 ERossi EJordan, MNBB3701 ACRS (11)

DMcPherson, BE23 RJones, 8E23 MRubin, 8E23 Alevin, 8E23 LShotkin, NLN353 TKing, NLN368 DBessette, NLN353 0FC LA:PDST:ADAR PM:PDST:ADAR, SC:PDST:GDAR NAME PShea a D3 FHasselb8[

TEssig ' k 08/T/9h 08/26 93 08/9/93 DATE

/

0FFICIAL RECORD COPY: OSUMEET.FH 4

m n

Docket No.52-003 Westinghouse Electric Corporation cc: Mr. Nicholas J. Liparulo Nuclear Safety and Regulatory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. B. A. McIntyre Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania 15230 Mr. John C. Butler Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania 15230 Mr. M. D. Beaumont Nuclear and Advanced Technology Division Westinghouse Electric Corporation One Montrose Metro 11921 Rockville Pike Suite 350 Rockville, Maryland 20852 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.

20585 Mr. S. M. Modro EG&G Idaho Inc.

Post Office Box 1625 Idaho Falls, Idaho 83415 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

l Room 8002 Washington, D.C.

20503 Mr. Frank A. Ross U.S. Department of Energy, NE-42 Office of LWR Safety and Technology 19901 Germantown Road Germantown, Maryland 20874 i

t Westinghouse /NRC 31eeting on AP600 Low Pressure 1/4 Height Integral Systems Tests September 20,1993 Oregon State l'niversity LaSells Stewart Center, Agricultural Science Room 1.

Welcome OSU 8:15 (:10) 2.

In t rod uction /B a c k g rou n d/O bj ectiv es W

8:25 (:15) 3.

OSU Facility Design Update W

8:40 (1:00)

- Final Design

- Break / Separator System BREAK 9:40 (:20) 4 OSU Instrumentation Design IV 10:00 (2:00)

- Walk Through Design and Logic LUNCH (Valley Football Center,59.00) 12:00 (1:30) 5.

Facility Tour OSU 1:30 (1:00)

BREAK (return to meeting room) 2:30 (:15) 6.

OSU Scaling Analysis OSU 2:45 (1:30)

- Brief Review of Chapters 1-4

- Depressurization Scaling, Chapter 5

- C31T, Accumulator, IRWST, Chapter 6

- Long Term Cooling, Chapter 7

- Scaling Distortions 7.

Test 31strix W

4:15 (:30)

S.

Schedule W

4:45 (:15) 9.

Adjourn 5:00 l

i I

i i

Enclosure i

DIRECTIONS FRO 31 PORTLAND TO CORVALLIS From the road leading away from Ponland airpon take Interstate Highway 205--head south on Interstate 205. Follow Interstate 205 until it meets Interstate 5. At that point continue south l

by going from Interstate 205 onto Interstate 5 at the sign marked south-Salem.

Follow Interstate 5 south to Exit #228 (Corvallis, Highway 34). Turn right off the freeway onto Highway 34 and follow Highway 34 west to Corvallis which is approximately 10 miles.

When you enter Corvallis you will cross a bridge over the Willamette River and will be on Harrison Blvd. To go to your motel, contmue west on Harrison blvd. to 9th Street, turn right, and continue until you come to Garfield. Your motels will be located on the left.

To locate the LaSells Stewan Center, (from your motel) tum left on 9th Street and continue until you come to Harrison Street. Tum right on Harrison Sueet and continue until you come to 14th Street. Turn left on 14th Street. Keep going until you come to Western Blvd. Turn l

right on Westem Blvd. and continue until you come to 26th Street. LaSells will be located on l

your right. To park, you need to park at Parker Stadium (across the street from LaSells Stewan Center).

i i

DIRECTIONS FRONI EUGENE TO CORVALLIS From the road leading away from the Eugene airpon take Highway 99--tum left on Highway 99. Follow Highway 99 through a little town called Junction City. At the nonh end of Junction City follow the signs leading to Monroe /Corvallis. There is a "Y" here at this l

intersection, you will take the left "Y." Follow Highway 99 nonh until you come to Corullis.

You will come into downtown Corvallis. You will be on 3rd Street (a one way street).

j Continue until you come to Harrison Street. Tum left and continue until you reach 9th Street.

To locate your motels, tum right on 9th Street and continue until you come to Garfield Street.

Your motel will be located on the left..

To locate the LaSells Stewan Center, (from your motel) tum left on 9th Street and continue i

until you come to Harrison Street. Tum right on Harrison Street and continue until you come j

to 14th Street. Tum left on 14th Street. Keep going until you come to Western Blvd. Tum l

right on Western Blvd., continue until you come to 26th Street. LaSells will be located on your right. To park, you need to park at Parker Stadium (across the street from LaScils Stewan Center).

1 i

If you have any questions, please contact the AP600 office at 737-4677.

1

-