ML20056H451
| ML20056H451 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/23/1993 |
| From: | Gray J NRC OFFICE OF ENFORCEMENT (OE) |
| To: | |
| Shared Package | |
| ML20056H443 | List: |
| References | |
| 2.206, NUDOCS 9309090351 | |
| Download: ML20056H451 (3) | |
Text
_ - -
U.S.
NUCLEAR REGULATORY COMMISSION Docket No. 50-423 NORTHEAST UTILITIES (Millstone Nuclear Power Station)
(License No. NPF-49) l RECEIPT OF PETITION FOR DIRECTOR'S DECISION l
UNDER 10 C.F.R.
Ei 2.206 Notice is hereby given that by Petition dated August 2,
- 1993, Paul M.
Blanch (Petitioner) has requested that the Executive i
Director for Operations take enforcement action for Northeast Utilities (NU) violations of 10 CFR 50.7.
As grounds for this
- request, the Petitioner asserts a
letter he received from Mr. James Lieberman,
- Director, Office of Enforcement, dated j
July 15, 1993, responding to Mr. Blanch's letter of June 4,
- 1993, l
i in which he stated that many specifics were not addressed in an l
l enforcement action taken against NU, was unresponsive.
Therefore, Mr. Blanch requests:
(1) that enforcement action be taken against Dr. Charles F.
Sears, former NU Vice President of Nuclear and Environmental Engineering, for willful violation of 10 CFR 50.7 and deliberate misconduct as defined by 10 CFR 50.5 (Mr. Blanch alleges that the NRC's Office of Investigations (OI) identified Dr. Sears 1
as one of those responsible for actions taken resulting in harassment, intimidation and discrimination (HI&D) directed against him); (2) that a Severity Level I violation be imposed upon the NU Corporate Officer responsible for directing that two of Mr. Blanch's subordinates be suspended, which Mr. Blanch alleges was a retaliatory action in violation of 10 CFR 50.7 and deliberate i
misconduct as defined by 10 CFR 50.5; (3) that three Severity Level l
9309090351 930823
~
PDR ADOCK 05000423 C
PDR_
-2 I violations be imposed upon three NU corporate officers (for violations of 10 CFR 50.7 and deliberate misconduct as defined by 10 CFR 50.5) whom Mr. Blanch alleges OI concluded were responsible for various incidents of HI&D and attempted HI&D against him; (4) that a Severity Level I violation be issued for actions by Ed Richters, NU attorney, and a Severity Level II violation be issued to Thomas Shaffer, NU manager, whom Mr.
Blanch asserts threatened certain individuals with letters of reprimand if they did not talk with NU contract attorneys prior to being interviewed by the Office of Investigations (OI), for violation of 10 CFR 50.7 and deliberate misconduct as defined by 10 CPR 50.5; and (5) that a minimum of a Sevc.rity Level II violation be issued for actions in violation of 10 CFR 50.7 and 10 CFR 50.5 by Mr. Allen Pollack, NU Manager of Internal Auditing.
Mr.
Blanch alleges that Mr. Pollack, who was responsible for conducting an audit of Mr. Blanch's engineering group, was found by OI to have used falsified credentials and to have arrived at invalid conclusions based on invalid documentation, and that Mr. Pollack was fully aware that the audit was retaliatory and in violation of 10 CFR 50.7.
The request is being treated pursuant to 10 C.F.R. S 2.206 of the Commission's regulations. The request has been referred to the Director of the office of Enforcement for action.
As provided by section 2.206, appropriate action will be taken on this request within a reasonable time.
. A copy of the Petition is available for inspection at the Commission's Public Document Room at 2120 L
- Street, N.W.,
Washington, D.C.
20555.
I FOR THE NUCLEAR REGULATORY COMMISSION 7
l J
ph Gray epu Director l
0 fic of Enfo eme 1
i Date Rockville, Maryland this ay of August 1993.
l l
_