Provides Suppl Reponse to NRC Bulletin 93-003, Resolution of Issues Re Rv Water Level Instrumentation in Bwrs. During 5th Refueling Outage Beginning Sept 1993,backfill Mod Will Be Installed
ML20056H330
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 09/03/1993
From: Pict P
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
IEB-93-003, IEB-93-3, NUDOCS 9309090160
Download: ML20056H330 (2)


Text

443 7odlis T[I 3~

5DI 15Y:

3-3-33 : 3:21t'% :

D) 1400 opus Place Ctmmrnwrith Edtsen O

,( j "J Downers Grove, Illinois 60515

_%J September 3,1993 1

Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attn: Document Control Desk i

Subject:

LaSalle County Nuclear Power Station Unit 2 Supplemental Response to NRC Bulletin (IEB) 93-03,

" Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs," for LaSalle County Station Unit 2 NRC Docket No. 50-374

Reference:

(a)

L. DelGeorge letter to T. Murley, dated July 30,1993.

Dear Dr. Murley:

In the Reference (a) letter, Commonwealth Edison Company (CECO) provided its initial response to subject NRC Bulletin (IEB) 93-03, i

" Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs." The original response for LaSalle Unit 2 stated the following:

"During the 5th refuel outage (L2R05 beginning Sept 1993), the backfill modification will be installed. When the unit starts up, only the Post Accident Monitoring legs will be valved in. At the first shutdown after 6 months experience has been accumulated with the system, the reference leg for the Division 2 trip systems will be valved in. At the second shutdown after the same six months experience, the remaining reference legs will be valved in."

In the time frame since submitting the Reference (a) letter, CECO has been evaluating progress made towards completion of the hardware modifications for LaSalle County Unit 2. After further analysis of the CECO IEB 93-03 modification program and the continuing evaluation ofindustry experience to date, CECO is supplementing our original response for LaSalle County Unit 2. This supplemental responce is stated as follows:

For LaSalle Unit 2: During the 5th refuel outage (L2R05 beginning Sept l

1993), the backfill modification will be installed. When the unit starts up, all reference legs associated with the backfill modification will be valved in l

and declared operable. If problems are encountered with reactor vessel level that are discovered to be directly attributable to the backfill modification, LaSalle will disable the backfill system and immediately notify y

your Staff to discuss dispositioning the concerns.

~l) 9309090160 93o903 P

gA 08002(3 Poa Anocn osoooa74 v4 G

PDR j

5DI di:

3-3-33 : 3:22F.M :

443 76b1:# 3/ i Dr. Thomas E. Murley September 3,1993 This response supersedes the previous commitments (as stated in Reference (a)) made

~

for LaSalle County Unit 2 in their entirety.

If you have any questions or comments, please direct them to this office.

Respectfully, l

Y eter L. Pi i

Nuclear Licensing Administrator 1

i l

l J. B. Martin, Regional Administrator - RIII cc:

J. L. Kennedy, Project Manager - NRR D. Hills, Senior Resident Inspector - LaSalle r

l 3

l l

l kAnta'Jasa!)eWiis.wpf2

-